Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
P2.01A - FIRST FLOOR PLUMBING NEW WORK - AREA A
x1x5 x6 x6.5 x7 x8x10 x11 x5.5 21 21 22 22 24 24 26 26 27 27 28 2820 20 23 23 25 25 xA xB xC xD x2 WC1 L1 1/2" 1/2" 1/2" 3/4"3/4"DHWRDHWDCWVESTIBULE 100 RR 105T STAIR 104 WAITING ROOM 101 CAT-FRIENDLY WAITING 103 RECEPTION 102 1/2" WB1 WH2 3/4" DCW DCW PROJECT NUMBER: CHECKED BY: DESIGNED BY: 1650 WATERMARK DRIVE COLUMBUS, OHIO 43215 SUITE 200 DRAWN BY: © 2021 M+A Architects PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: KEY PLAN 2021-0012 A BC D 20297 FIRST FLOOR PLUMBING NEW WORK -AREA A 04 MARCH 2022 P2.01AEric Stephens Nathan Criss Nathan Criss MEDVET INDIANAPOLIS -ANIMAL HOSPITAL9650 MAYFLOWER PARK DRIVE | CARMEL, IN 46032RENOVATION AND ADDITIONN 0' 2' 4'1' SCALE: 1/4" = 1'-0"1 FLOOR PLAN 07/13/22