Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
P2.01B - FIRST FLOOR PLUMBING NEW WORK - AREA B
x1 D A C B x4 x3 x5.526 26 27 27 28 28 25 25 xD xE xF x2 Y Y Z Z S1 S2 EEW1 S2 WT1 WC1 L1 S4 EEW1 MS1 WC1 L1 S1 WT1 S7 EEW1 L1 EEW2 WT1 S4 EEW1 S4 GD1 EEW1 S4 EEW1 S8 GD1 WT1 S4 GD1 EEW1 S7 EEW1 WC2 L1 MS1 1 1/2" 1 1/2" 1.5 GPM 1.5 GPM 1 1/4" 2 1/2" 2 1/2"DHWRDHWDCW1" DHW DCW DHWR DHWR DHW DCW DHWR DHW DCW HS2 HS2 HS1 3/4" 2" 3/4" 3/4" DCW DHWDCWDHWDHWR3/4"3/4" 1" 1" 1 1/2" 1 3/4" 3/4" 3/4" 1/2"DHWDCW3/4" 3/4" 3/4" 1"DCWDHWDCWDHWDCW DHW DHWR 2 1 1/2" 2" 3/4" 3/4" 1" 1" 2 3/4" HS1 2" 2" DCW DHW DHWR 2 1/2" 2 1/2" 2" 1" 2" 3 1 1/2"3/4" 2" 3/4"1/2"DHWDCWDN1 DWH1 DWH2 4 RCP1 2"2" 4" 2"4" 4"SS SANCOSTM4" (GPM 84) TD1 CO 1/2" 1/2" 3" VR 2" VR 4 P6.01 G 1/2" 2" 5 6" (GPM 171) 4" (GPM 87) STM 4" (GPM 84) E-STMRR 106T TRIAGE 107A EXAM 1 121 XRAY 113 TRAUMA 108 BARKING ROOM 115A EX MEP 120 CAT WARD 110 CLINCAL TEAM 107B ICU 112 RR 114T JAN. 107D RR 119T ONCOLOGY SHELL SPACE 117 WARD 115 LAUNDRY 116 MEP 135 PROCEDURE ROOM 107C CORRIDOR X120 PHARMACY 109 ER/TRIAGE 107 CARDIOLOGY 118 ISOLATION 111 ANTE 111A ISOLATION 111B JC 111C ECHO 118C MECH 116A WORK RM 118A PRIVATE WK RM 118B CO 3/4" 3/4" HS1 1 1/2" CV1 6 FD1 2 P6.02 78 FD1 (TYP. 2) FD1 (TYP. 6) FS1 3/4"GDHWDHWRDCWSAN 10 2" VR 2" 3" FD1 (TYP. 6) FD1 (TYP. 3) 2" VR 9 9 9 3" VTR VVV V VVV V 2" 1 1/2" 2" 2" 2" 3" 3" 3" 3" 1 1/2" 1 1/2" 2" 3" 1 1/2" 2" 2" 1 1/2" 1 1/2" 2" 1 1/2" 7 4" 2" VAC 3"PD 2" 12 2" WB2 3/4" WH1 WH2 1 P6.01 WH1 3/4" 3/4" 3/4" 3/4" 13 AC114 15 CA16 PROJECT NUMBER: CHECKED BY: DESIGNED BY: 1650 WATERMARK DRIVE COLUMBUS, OHIO 43215 SUITE 200 DRAWN BY: © 2021 M+A Architects PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: KEY PLAN 2021-0012 A BC D 20297 FIRST FLOOR PLUMBING NEW WORK -AREA B 04 MARCH 2022 P2.01BEric Stephens Nathan Criss Nathan Criss MEDVET INDIANAPOLIS -ANIMAL HOSPITAL9650 MAYFLOWER PARK DRIVE | CARMEL, IN 46032RENOVATION AND ADDITIONN 0' 2' 4'1' SCALE: 1/4" = 1'-0"1 FLOOR PLAN FIRST FLOOR NEW WORK - AREA B CODED NOTES: 1. 3/4" DCW & DHW BELOW SLAB. 1/2" DCW & DHW TO EACH WET TABLE. COORDINATE EXACT LOCATION. MAKE FINAL CONNECTION. 2. 1/2" DCW & DHW BELOW SLAB TO WET TABLE. COORDINATE EXACT LOCATION. MAKE FINAL CONNECTION. 3. 2" DCW, 2" DHW. & 3/4" DHWR UP TO SECOND FLOOR. 4. VACUUM PUMP, REFER TO DRAWING P3.01. 5. 1/2" NATURAL GAS UP TO ROOF. 6. 1/2" BACKFLOW PREVENTER FOR HVAC MAKEUP WATER. CONTINUATION BY HVAC CONTRACTOR. 7. FUR VACUUM EXHAUST UP TO ROOF. SIZE AND INSTALL PER MANUFACTURER'S REQUIREMENTS. 8. FUR VACUUM PIPING TO BELOW SLAB. 9. FUR VACUUM INLET STATION. COORDINATE EXACT LOCATION WITH ARCHITECTURAL DRAWINGS AND OWNER. FUR VACUUM PIPING FROM INLET TO BELOW SLAB. 10. 2" NATURAL GAS DOWN TO EXISTING DOMESTIC WATER HEATER. 11. 2" FUR VAC PIPE UP THROUGH FLOOR TO OUTLET. COORDINATE EXACT LOCATION WITH ARCHITECTURAL DRWINGS & OWNER. MAKE FINAL CONNECTIONS. 12. CONNECT 2 1/2" TO EXISTING 2" EXISTING WATER SERVICE AND BACKFLOW PREVENTER. 13. 3/4" NATURAL GAS DOWN FROM SECOND FLOOR. 14. AIR COMPRESSOR TO SHELF MOUNTED. COORDINATE EXACT LOCATION AND HEIGHT WITH ARCHITECT AND OWNER. 15. DOMESTIC WATER HEATER FLUE AND COMBUSTION AIR INTAKE FROM WATER HEATER TO OUTSIDE. SIZE AND TERMINATE PIPE PER MANUFACTURER'S REQUIREMENTS. 16. 1/2" COMPRESSED AIR FROM AIR COMPRESSOR UP TO SECOND FLOOR. 07/13/22