Loading...
HomeMy WebLinkAboutP2.01C - FIRST FLOOR PLUMBING NEW WORK - AREA Cx7 x9 x10 x12 D F A C B x11 E 21 21 22 22 24 24 26 26 20 20 23 23 25 25 xD xE xF Y Y Z Z S1 S1 S1 S1 S4 L1 WC2 WT1 L1 WC2 S2 S2 EEW1 1 GPM 1 GPM 1.5 GPM 1" 3/4" 3/4" 1/2" 1/2" 1/2" 1/2" 1"DCWDHWRDHWDHW DCW DHWR DHWDHWRDCWDHWR DHW DCW DHWRDHW DCW 2 1/2" 2" 1" 1" 1 1/4" 3/4" 3/4" 3/4" 3/4" 1" 1" 3/4" 1 1/2" 1 1/4" 2" 1/2" 1/2"DCWDHWDHWDCWDHWR3/4" 1/2" 1/2" 1 1/2"2" 2 1/2"VDCWDHWDHW DHWR V 2" DN1 4" 4" 4" 4"SS 1½"SS 3"SS 1 1/2" 1 1/2" 2" SS 2"SS CO E-STM4" (GPM 54) 4" (GPM 54) 2" VR EXAM 2 122 EXAM 6 126 EXAM 9 129 EXAM 14 134 EXAM 10 130 EXAM 13 133 EXAM 12 132 EXAM 11 131 RAD. TECH WORK AREA 152 EXAM 15 136 EXAM 3 123 EXAM 5 125 EXAM 8 128 EXAM 7 127 EXAM 4 124 RR 106T EXAM 1 121 SHELLED CT 152A EX MEP 120 GRIEF 138 GRIEF 137 ENDOSCOPY 143A SURGERY RECEIVING 141 STAIR 139 RR 119T MEP 135 ELEVATOR 0000 CORRIDOR X110 CORRIDOR X130 CORRIDOR X140 CORRIDOR X120 DOCTORS OFFICE 142 RR 140T INTERNAL MEDICINE 143 CORRIDOR X150 I.M. PRIVATE WORK 143B ECHO 118C RR 139T SURG RECEIVING WK RM 141A 3" SAN STM1/2" 1/2"DCWDHWVACVAC2" 3/4" 3/4"SAN3/4" 11 2 1 1/2" 2" 1 1/2" 2" 3" VTR 1 1/2" 1 1/2" SAN 2 1/2" 2" 1 1/2" G 3 1 1/2" 4 5 2" 1 1/2" SANSAN 1 1/2" 2" S2 EEW1 1/2" 1/2" 1 1/2" V 3/4" PROJECT NUMBER: CHECKED BY: DESIGNED BY: 1650 WATERMARK DRIVE COLUMBUS, OHIO 43215 SUITE 200 DRAWN BY: © 2021 M+A Architects PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: KEY PLAN 2021-0012 A BC D 20297 FIRST FLOOR PLUMBING NEW WORK -AREA C 04 MARCH 2022 P2.01CEric Stephens Nathan Criss Nathan Criss MEDVET INDIANAPOLIS -ANIMAL HOSPITAL9650 MAYFLOWER PARK DRIVE | CARMEL, IN 46032RENOVATION AND ADDITIONN 0' 2' 4'1' SCALE: 1/4" = 1'-0"1 FLOOR PLAN FIRST FLOOR NEW WORK - AREA C CODED NOTES: 1. 2" FUR VAC PIPE UP THROUGH FLOOR TO OUTLET. COORDINATE EXACT LOCATION WITH ARCHITECTURAL DRWINGS & OWNER. MAKE FINAL CONNECTIONS. 2. FUR VAC PIPE UP THROUGH FLOOR TO FUR VACUUM PUMP. COORDINATE EXACT LOCATION. MAKE FINAL CONNECTIONS. 3. 1 ½" NATURAL GAS UP TO ROOF. 4. NATURAL GAS METER AND REGULATOR ASSEMBLY BY NATURAL GAS COMPANY. 5. CONTINUATION BY NATURAL GAS COMPANY. 07/13/22