Loading...
HomeMy WebLinkAboutP2.02C - SECOND FLOOR PLUMBING NEW WORK - AREA C87 6 A C B L1 WC1 S7 EEW1 S2 DCW DHWR DHW 2" 3/4" 1 1/2"DHWDCW3/4" 3/4" 1" 1" 1" V 3" 3" VR OFFICE 212 OFFICE 213 OFFICE 216 OFFICE 215 RR 220T CORRIDOR X230 CAT I-131 219A CLINCAL MANAGERS 217 WORK STATIONS 214 COMMUNICATIONS 211 CAT I-131 ANTE RM 219 MARKETING CLOSET 218 2" 3/4" G 2 3 1 1 1/2" 3/4" 2" S7 EEW1 PROJECT NUMBER: CHECKED BY: DESIGNED BY: 1650 WATERMARK DRIVE COLUMBUS, OHIO 43215 SUITE 200 DRAWN BY: © 2021 M+A Architects PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: KEY PLAN 2021-0012 A B CD E 20297 SECOND FLOOR PLUMBING NEW WORK - AREA C 04 MARCH 2022 P2.02CEric Stephens Nathan Criss Nathan Criss MEDVET INDIANAPOLIS -ANIMAL HOSPITAL9650 MAYFLOWER PARK DRIVE | CARMEL, IN 46032RENOVATION AND ADDITIONN 0' 2' 4'1' SCALE: 1/4" = 1'-0"1 FLOOR PLAN SECOND FLOOR NEW WORK - AREA C CODED NOTES: 1. 2" DCW, 1 ½" DHW, 3/4" DHWR DOWN TO FIRST FLOOR. 2. 3/4" NATURAL GAS DOWN FROM ROOF. 3. 3/4" DOWN TO DWH1 AND DHW2ON FIRST FLOOR. 07/13/22