Loading...
HomeMy WebLinkAboutP2.02D - SECOND FLOOR PLUMBING NEW WORK - AREA Dx1x7x9 x10x12 54 A C B x11 x4 x3 x5.5 21 22 26 28 20 23 23 x2 MS1 S2 EEW1 1" 3/4" 1 1/2" DCW DHWR DHW 1 1/4"1 1/4"2" DCW DHWR DHW DHWR DHW 3/4" 3/4" 1 1/2" 3" 2" 2" 3" 2" 3" VTR VVV2" VR 4" (GPM 87) STM 4" (GPM 87) DN1 WELLNESS 229 RR 228T RR 227T DENTISTRY 221 STAIR --- CENTRAL SUPPLY 223 ELEVATOR 000 PRIVATE WORK 221A CHASE 00 DENTISTRY WK RM 221B DOCTORS 210B CORRIDOR X240 J.C. 222 STME-STM4" (GPM 87) CV1 1 2 1 1/2" 3 E-STM3/4" 1.5 GPM 2 GPM PROJECT NUMBER: CHECKED BY: DESIGNED BY: 1650 WATERMARK DRIVE COLUMBUS, OHIO 43215 SUITE 200 DRAWN BY: © 2021 M+A Architects PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: KEY PLAN 2021-0012 A B CD E 20297 SECOND FLOOR PLUMBING NEW WORK - AREA D 04 MARCH 2022 P2.02DEric Stephens Nathan Criss Nathan Criss MEDVET INDIANAPOLIS -ANIMAL HOSPITAL9650 MAYFLOWER PARK DRIVE | CARMEL, IN 46032RENOVATION AND ADDITIONN 0' 2' 4'1' SCALE: 1/4" = 1'-0"1 FLOOR PLAN SECOND FLOOR NEW WORK - AREA D CODED NOTES: 1. FUR VACUUM EXHAUST UP TO ROOF. SIZE AND INSTALL PER MANUFACTURER'S REQUIREMENTS 2. FUR VACUUM PIPING DOWN TO FIRST FLOOR. ROUTE VACUUM PIPING ABOVE CEILING ON THE FIRST FLOOR. 3. FUR VACUUM IN STACKED CONFIGURATION PER MANUFACTURER REQUIREMENTS. 07/13/22