Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
P2.02E - SECOND FLOOR PLUMBING NEW WORK - AREA E
32 1 2.2 A C B S4 GD1 S2 L1 L1 WC2 WC1 3/4" DHW DHWR DCW 3/4" 3/4" 3/4" 1/2" DCW DHWR DHWDHW 3/4" 3/4" 1" 1" 3/4" 1 1/2" 3"VTR 1 1/2"1 1/2" 2" 2" 2" 3" 2" 2" V V V2"VR WELLNESS 229 MOTHERS ROOM 225 IT 226 BREAK ROOM 230 RR 228T RR 227T KITCHENETTE 231 CORRIDOR X250 LOCKER ROOM 224 CONFERENCE ROOM 232 DCW2 1 3 WB1 PROJECT NUMBER: CHECKED BY: DESIGNED BY: 1650 WATERMARK DRIVE COLUMBUS, OHIO 43215 SUITE 200 DRAWN BY: © 2021 M+A Architects PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: KEY PLAN 2021-0012 A B CD E 20297 SECOND FLOOR PLUMBING NEW WORK - AREA E 04 MARCH 2022 P2.02EEric Stephens Nathan Criss Nathan Criss MEDVET INDIANAPOLIS -ANIMAL HOSPITAL9650 MAYFLOWER PARK DRIVE | CARMEL, IN 46032RENOVATION AND ADDITIONN 0' 2' 4'1' SCALE: 1/4" = 1'-0"1 FLOOR PLAN SECOND FLOOR NEW WORK -AREA E CODED NOTES: 1. 3/4" DCW DOWN CHASE. 1/2" DCW TO EACH WATER CLOSET. 2. 3/4" DCW & DHW DOWN CHASE. 1/2" DCW & DHW TO EACH LAVATORY. 3. EXTEND 1/2" DCW TO COFFEE MAKER. 07/13/22