Loading...
HomeMy WebLinkAboutP2.03 - ROOF PLUMBING NEW WORKRD1 (54 GPM) 3" VTR 3" VTR 3" VTR RD1 (84 GPM) RD2 (84 GPM) RD2 (54 GPM) G 1/2" 2 1" 1 1/2" 1" 3/4"1 1/2" 1" 1 1/4" 2" 1 1/2" 1 1/4" 3/4" RD1 (87 GPM) RD2 (87 GPM) 3" VTR 3" VTR 1 1 1" 1 1/2" 1 1/2" G 3/4" 1 1/4" 1" 1" 1 1/4" 3 4 1" 5 RTU5 RTU6 RTU9 RTU8 RTU3 RTU7 RTU4 RTU2 RTU1 PROJECT NUMBER: CHECKED BY: DESIGNED BY: 1650 WATERMARK DRIVE COLUMBUS, OHIO 43215 SUITE 200 DRAWN BY: © 2021 M+A Architects PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: KEY PLAN 2021-0012 A B CD E 20297 ROOF PLUMBING NEW WORK 04 MARCH 2022 P2.03Eric Stephens Nathan Criss Nathan Criss MEDVET INDIANAPOLIS -ANIMAL HOSPITAL9650 MAYFLOWER PARK DRIVE | CARMEL, IN 46032RENOVATION AND ADDITIONN 0'4' 8'2' 1' SCALE: 1/8" = 1'-0"1 ROOF PLAN ROOF NEW WORK -OVERALL CODED NOTES: 1. FUR VACUUM, EXHAUST, SIZE AND INSTALL PER MANUFACTURER'S REQUIREMENTS. 2. 1/2" NATURAL GAS DOWN TO EXISTING DWH. 3. 3/4" NATURAL GAS DOWN TO DOWN TO SECOND FLOOR. 4. 1 ½" NATURAL GAS UP FROM FIRST FLOOR. 5. 2" VENT THROUGH ROOF FOR OWNER FURNISHED STERILIZER. TERMINATE VENT THROUGH ROOF PER STERILIZER MANUFACTURER'S REQUIREMENTS. COORDINATE EXACT LOCATION WITH ARCHITECTURAL DRAWINGS AND OWNER. MAKE FINAL CONNECTIONS. 07/13/22