Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
P6.03 - PLUMBING DETAILS
SECONDARY STORM DRAIN LINE SEE PLANS FOR SIZE BIRDSCREEN SEAL ON ALL SIDES WATER TIGHT DOWNSPOUT NOZZLE SEE PLANS FOR SIZE AND LOCATION. SEE ARCH. DWGS. FOR EXACT LOCATION AND ELEVATION EXTERIOR FACE OF BUILDING PIPE THRU GYP. BOARD WALL PIPE THRU C.M.U. WALL WOOD, CMU, METAL STUDS OR GYP. BOARD. UNFINISHED AREA FINISHED AREA CONTINUOUS INSULATION THRU SLEEVE. PROVIDE ALUMINUM JACKET 2" BEYOND CAULKING OR ESCUTCHEON FIRE RATED WALLS 1" METACAULK 950 (BOTH SIDES) TROWELLED SMOOTH NON FIRE-RATED WALLS 1" DOW CORNING 832 (BOTH SIDES) PLANT MAINTENANCE SILICONE(WHITE) TROWELLED SMOOTH ESCUTCHEON TO BE PROVIDED IN FINISHED AREA PROVIDE BACKER ROD AND SEALANT (TYP.) 20 GAUGE GALVANIZED STEEL PIPE SLEEVE 1/2" MIN-SPACE ALL AROUND CAST IRON OR COPPER PIPE PROVIDE BACKSTOP MATERIAL MINERAL WOOL (4.0 PCF MIN.) FINISHED AREA 20 GAUGE GALVANIZED STEEL PIPE SLEEVE PROVIDE BACKSTOP MATERIAL MINERAL WOOL (4.0 PCF MIN.) CAST IRON OR COPPER PIPE ESCUTCHEON TO BE PROVIDED IN FINISHED AREA 1/2" MIN-SPACE ALL AROUND FIRE RATED WALLS 1" METACAULK 950 (BOTH SIDES) TROWELLED SMOOTH NON FIRE-RATED WALLS 1" DOW CORNING 832 (BOTH SIDES) PLANT MAINTENANCE SILICONE(WHITE) TROWELLED SMOOTH UNFINISHED AREA CONTINUOUS INSULATION THRU SLEEVE. PROVIDE ALUMINUM JACKET 2" BEYOND CAULKING OR ESCUTCHEON FLASH / SEAL WATER TIGHT ROOFING ROOFING MATERIAL RIGID INSULATION METAL DECK PIPE SEAL (FIELD SUPPLIED) VENT PIPE SIZE AS SHOWN ON PLANS *12" MIN. OR AS REQUIRED 3" MIN.*EPDM ROOFING TAPERED INSULATION METAL DECK AND STRUCTURE SUMP INSULATION BY MECH. TRADES INSUL. INSTALLER EPDM ROOFING OUTLET TYPE (SEE DRAIN SCHED.)STORM PIPING (SEE PLANS FOR SIZE) FRAMING BY G.C. OPENING THROUGH ROOF BY ROOFING CONTRACTOR DECK CLAMP METAL DECK STRUCTURAL BEAM FLASH/SEAL WATER TIGHT ROOFING PIPE SEAL (FIELD SUPPLIED) ROOFING MATERIAL RIGID INSULATION PIPE SIZE AS SHOWN ON PLANS 18" SQ. x 24" DEEP SUMP PIT BY GENERAL TRADES CONTRACTOR. SEE PLAN FOR LOCATION. SUMP PUMP SEE PLUMBING EQUIPMENT SCHEDULE COMBINATION FULL OPEN BALL ISOLATION VALVE, FULL FLOW NON-SLAM CHECK VALVE & DISCONNECT UNION BY PLUMBING CONTRACTOR 2" SUMP PUMP DISCHARGE PIPING BY PLUMBING CONTRACTOR GRATE BY GENERAL CONTRACTOR POWER CORD 3-PRONG GROUNDED 115V OUTLET BY DIVISION 26 CONTRACTOR ROUTE 2" SUMP PUMP DISCHARGE PIPING BELOW FLOOR SLAB AND CONNECT TO FLOOR SINK ELEVATOR SHAFT PROVIDE PIPE SLEEVE, WATER STOP AND LINK SEAL AT PENETRATION THROUGH ELEVATOR PIT WALL FINISHED FIRST SP1 FLOOR ELEVATOR PIT ELEVATOR PIT BOTTOM OF PROJECT NUMBER: CHECKED BY: DESIGNED BY: 1650 WATERMARK DRIVE COLUMBUS, OHIO 43215 SUITE 200 DRAWN BY: © 2021 M+A Architects PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: 2021-0012 20297 PLUMBING DETAILS 04 MARCH 2022 P6.03Eric Stephens Nathan Criss Nathan Criss MEDVET INDIANAPOLIS -ANIMAL HOSPITAL9650 MAYFLOWER PARK DRIVE | CARMEL, IN 46032RENOVATION AND ADDITIONDETAIL N.T.S. 1 SECONDARY ROOF DRAIN DOWNSPOUT NOZZLE DETAIL N.T.S.3 TYPICAL INTERIOR WALL PENETRATIONS DETAIL N.T.S. 2 VENT PENETRATION THRU ROOF DETAIL N.T.S. 4 ROOF DRAIN DETAIL N.T.S. 5 PIPE PENETRATION THROUGH ROOF DETAIL N.T.S.6 ELEVATOR SUMP PUMP 07/13/22