HomeMy WebLinkAboutA0.90 PHASING PLANA. PHASING DIAGRAMS ARE SCHEMATIC IN NATURE SHOWING THE PREFERRED ORDER OF CONSTRUCTION FOR THE PROJECT. THE CONTRACTOR SHALL GENERATE A CONSTRUCTION PHASING WORK PLAN BASED ON THESE DIAGRAMS INCLUDING THE ENTIRE SCOPE OF WORK FOR THE PROJECT. ANY VARIATIONS OF THE ORDER SHALL BE DISCUSSED WITH THE A/E AND OWNER FOR APPROVAL BEFORE MAKING ANY PHASE CHANGES. B. ANY AREAS OF WORK SHOWN IN THE DOCUMENTS, BUT NOT DETAILED HERE IN THE PHASING PLANS SHALL BE SCHEDULED BY THE CONTRACTOR WITHIN AN APPROPRIATE PHASE OF WORK. REVIEW DETAILS WITH THE A/E AND OWNER FOR APPROVAL. C. THE CONTRACTOR SHALL CONSTRUCT TEMPORARY ICRA BARRIERS AROUND THE PROJECT AREA AS NEEDED. THESE PHASING PLANS SHOW THE MINIMUM NUMBER OF BARRIERS REQUIRED FOR THE PROJECT. THE CONTRACTOR SHALL PROVIDE ADDITIONAL BARRIERS AS NEEDED. D. THESE DRAWINGS SHOW THE MINIMUM NUMBER OF CONSTRUCTION DOOR ENTRANCES AND STICKY PAD LOCATIONS FOR THE PROJECT. THE CONTRACTOR SHALL PROVIDE ADDITIONAL DOORS AND PAD LOCATIONS AS NEEDED. E. USE ICRA BARRIER TYPE 2 TYPICALLY. USE ICRA BARRIER TYPE 3 BETWEEN LAB AND CONSTRUCTION AREAS. F. PROVIDE TEMPORARY BLOCKING OF EXIT SIGNS LEADING TO EXITS WHICH ARE TEMPORARILY CLOSED AND AFFECTED BY CONSTRUCTION; INFORM THE A/E AND OWNER OF AFFECTED DATES TWO WEEKS IN ADVANCE MINIMUM TO ALLOW DISSEMINATION OF INFORMATION TO BUILDING STAFF ON IMPACTED EXITS DURING EACH PHASE OF CONSTRUCTION. PHASE I -MOVE EXTERIOR UTILITIES PHASE II PHASE III PHASE IV PHASE IIA7' - 10 3/8"NEW GENERATOR / ENCLOSURE PET RELIEF AREA ISOLATION PET RELIEF AREA LINE OF EXISTING / NEW FLOOR BELOW CONSTRUCTION SIDEOCCUPIED SIDE SEAL PERIMETER OF WALL WITH DUCT TAPE TYPE-2 CONSTRUCTION BARRIER: TEMPORARY FULL HEIGHT PARTITION WALL FROM FLOOR TO DECK ABOVE; 5/8" TYPE 'X' GYP. BD. ON 3-5/8" 25 GA. METAL STUDS 24" O.C.; FINISHED SIDE WITH GLOSS PAINT; BATT INSULATION TO DECK. LINE OF EXISTING OR NEW CEILING CLOSE OPEN DUCTS WITH 6 MIL POLY; SEAL WITH DUCT TAPE EXISTING / NEW FLOOR SLAB ABOVE SEAL AROUND ALL PIPE AND DUCT PENETRATIONS IN THE PARTITION AND POLY BARRIER WITH DUCT TAPE SEAL PERIMETER OF WALL WITH DUCT TAPE CLASS 'C' 3/4 HOUR FIRE/SMOKE RATED DOOR WITH SELF CLOSING DEVICE AND KEYED LOCK OCCUPIED SIDECONSTRUCTION SIDETYPE-2 CONSTRUCTION BARRIER PLAN VIEW SECTION CONTRACTOR TO INSTALL AIR PRESSURE INDICATOR © 2022 M+A Architects PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: 20297 PHASING PLAN 04 MARCH 2022 A0.90MEDVET INDIANAPOLIS -ANIMAL HOSPITAL9650 MAYFLOWER PARK DRIVE | CARMEL, IN 46032RENOVATION AND ADDITIONPHASING PLAN GENERAL NOTES 1" = 20'-0"A0.90 1 overall first floor existing phasing plan 1" = 20'-0"A0.90 2 overall first floor phasing plan 1" = 20'-0"A0.90 3 overall second floor phasing plan PHASING PLAN LEGEND KEY PLAN A BC D 1/4" = 1'-0"A0.90 4 section -icra barrier type 2 07/13/22