Loading...
HomeMy WebLinkAboutCC Lot 89 PLOT PLAN 6.15.22STM STM STMSTMW W W W THIS DOCUMENT HAS BEEN PREPARED AND BASED UPON THE CONSTRUCTION DOCUMENTS, RECORD DRAWINGS AND ADDITIONAL INFORMATION PREPARED FOR THIS DEVELOPMENT BY OTHERS. THIS DOCUMENT IS NOT BASED UPON A FIELD SURVEY AND FOREFRONT SURVEYING AND ENGINEERING DOES NOT WARRANT THE ACCURACY OR COMPLETENESS OF THIS INFORMATION. REVISIONSDATEREV. NO. CHECKED BY: JLT PAGE 1 OF 1 PREPARED FOR: EPCON COMMUNITIES JOB #: 22SE-451 SANITARY MANHOLE WATER VALVE FIRE HYDRANT STORM STRUCTURE AS APPLICABLE CURB INLET LEGEND SITE BENCHMARK B.L.BUILDING LINE D.&U.E.DRAINAGE & UTILITY EASEMENT D.U.&S.S.E.DRAINAGE, UTILITY & SANITARY SEWER EASEMENT L.M.A.E.LANDSCAPING, MAINTENANCE ACCESS EASEMENT DRAWN BY: CCH 17241 Foundation Pkwy, Westfield, IN 46074 requests@forefrontse.com DATE: 06/02/2022 M.F.P.G.MINIMUM FLOOD PROTECTION GRADE PLOT PLAN XX.X ELEVATION PER PLAN BUILDING SETBACK LINES: 10' MINIMUM FRONT YARD 20' MINIMUM REAR YARD 3' MINIMUM SIDE YARD 8' MINIMUM BETWEEN STRUCTURES 70% MAXIMUM LOT COVERAGE END SECTION EMERGENCY FLOOD ROUTE Certified this 2nd day of June, 2022 Joseph Trtan Professional Land Surveyor Indiana No. LS21500003WATER METER M.L.A.G.MINIMUM LOWEST ADJACENT GRADE M.F.F.MINIMUM FINISH FLOOR 2926 TWAIN DRIVE CARMEL, IN 46033 CLAY TOWNSHIP HAMILTON COUNTY LOT 89 THE COURTYARDS OF CARMEL SECTION 2 INST. #2022023864 P.C. #6, SLIDE #260 DRIVEWAY SLOPE=5.1%± LOT COVERAGE=53.2% M.F.F.E.=830.40 M.L.A.G.=829.90 M.F.P.G.=829.90 LOT AREA:5,940 Sq.Ft. W S N E SOD: SEED: PRIVATE WALK: PUBLIC WALK: DRIVEWAY: MULCH: IMPERVIOUS: Sq.Ft. Sq.Ft. Sq.Ft. Sq.Ft. Sq.Ft. Sq.Ft. Sq.Ft. LOT 88 VACANT LOT 2,661 N/A 150 245 377 520 3,162 LOT 90 PROPOSED HOUSE MULCH AREA 1 06/09/22 MOVE HOUSE POSITION