Loading...
HomeMy WebLinkAboutSDEMO PLAN NOTES: D1. REMOVE WALL / PORTION OF WALL. DEMOLITION PLAN SCALE: 1/8" = 1'-0" 0' 2' 4' 10' D101KAELIN RESIDENCE 5 WOODLAND CIRCLE, CARMEL, INDIANA DX A. ALL EXISTING CONSTRUCTION TO REMAIN UNLESS OTHERWISE NOTED. B. NOTIFY ARCHITECT OF ANY DIMENSIONAL OR PHYSICAL DISCREPANCIES BETWEEN EXISTING CONDITIONS AND REPRESENTATIONS IN THE DRAWINGS FOR CLARIFICATION PRIOR TO PROCEEDING WITH WORK IN THE AFFECTED AREA. C. CONTRACTOR SHALL PROVIDE TEMPORARY PROTECTION OF EXISTING FINISHES AND EQUIPMENT AS NEEDED DURING DEMOLITION/ CONSTRUCTION. ANY DAMAGE TO EXISTING CONSTRUCTION SHALL BE RESTORED BY CONTRACTOR TO NEW CONDITION PRIOR TO COMPLETION OF CONSTRUCTION. D. CONTRACTOR TO VERIFY ALL STRUCTURAL CONDITIONS AND PROVIDE SUPPORT FOR ANY LOAD BEARING WALLS BEING REMOVED. GENERAL DEMO NOTES: D1 D1 D1 D1 D1 D1 D1 D1 D1 D1 DOOR R.O. 7'-8" 9'-6 1/2"D2. REMOVE PORTION OF WALL TO ACCOMMODATE NEW DOOR. D3. REMOVE PORTION OF WALL AND WINDOWS TO ACCOMMODATE NEW DOOR / WINDOW WALL. PROVIDE NEW HEADER AS REQUIRED. SIZE TO BE DETERMINED BY CONTRACTOR AND OWNER. D1 D3 D3 D2 D4. REMOVE BUILT-IN SHELVING AND CABINETRY. D4 D5. REMOVE ALL KITCHEN CABINETRY, COUNTERTOPS, APPLIANCES, AND PLUMBING FIXTURES. D5 D6. REMOVE DOOR AND FRAME.D10 D6 D6 D6 D6 D6 D6D6 D6 D7D7 D7. REMOVE WINDOW AND FRAME. D7D7 D8. REMOVE EXTERIOR BRICK AND EXTERIOR SIDING AND TRIM. FRAMED WALL TO REMAIN. D8 D8 D9. REMOVE CEILING IN THIS AREA. STRUCTURE TO BE MODIFIED TO CREATE VAULTED CEILING SUPPORT EXISTING STRUCTURE AS REQUIRED. D9 D9 D9 D9D9 NOTE: ALL EXISTING INTERIOR DOOR AND WINDOW TRIM TO BE REMOVED. ALL FLOORING (EXCEPT IN ALL BATHROOMS) TO BE REMOVED. ALL WALLPAPER TO BE REMOVED AND WALLS PREPARED TO ACCEPT A SMOOTH PAINT FINISH. D8 D1 D1 D6 D6 D1 D10. REMOVE GARAGE DOOR AND OPENER. STORE AND PROTECT FOR RE-INSTALLATION IN NEW GARAGE DOOR LOCATION. D1 D4 D9 REVISED 06.13.2022 D1 D11 D11. REMOVE LAUNDRY CABINETRY AND SINK. D6 D12 D12. REMOVE EXISTING WASHER AND DRYER. THE PURPOSE OF THESE DRAWINGS ARE FOR DESIGN INTENT ONLY. THE OWNER AND CONTRACTOR(S) SHALL ULTIMATELY BE RESPONSIBLE TO THE PROJECT IN ITS ENTIRETY. 07/26/22