HomeMy WebLinkAboutGeotechnical Engineering Report
GEOTECHNICAL ENGINEERING REPORT
Profosed Retail Development
111 .Street and MichiganRoad
Zionsville, Indiana
-Information
eTo Build On
Engineering. Consulting. .7iJstlng
Consulting, Inc.
7260 Shadeland Station
Indiana 46256-3957
September 7, 2005
PROFESSIONAL SERVICE INDUSTRIES, INC.
5362 West 78th Street
Indianapolis. IN 46268
Information
To Build On
EngineCtI'ing · Consulting · 7hsfing
September 7, 2005
Mr. Christopher L. Hinkle
Project Engineer
American Consulting, Inc.
7260 Shadel and Station
Indianapolis, Indiana 46256-3957
Re: Preliminary Geotechnical Engineering Services Report
Pro~osed Retail Development
111. Street and Michigan Road
Zionsville, Indiana
PSI File No. 016-55037
Dear Mr. Hinkle:
Professional SerVice Industries, Inc. (PSI) is pleased to transmit our Geotechnical Engineering
Services. Report for the referenced. project. This report includes .the results of field and laboratory
testing, and geotechnical recommendations for foundation and general pavement design, as well
as general site development.
PSI appreciates the opportunity to perform this . geotechnical evaluation and looks forward to
continued participation during the design. and construction phases of this. project. If you have
questions pertaining to this report, or if PSI may be of further service,. please contact our office.
Respectfully submitted,
PROFESSIONAL SERVICE INDUSTRIES, INC.
S~ljff
Project Engineer
~~
Michelle M.Gottschalk, P.E.
Geotechnical Department Manager
~L)t1M}5
Kevin C. Miller . .
Principal Consultant
Service Industries, Inc. - 5362 West 78th St. -Indianapolis, IN 46268-4126 - Phone 317/876-n23. Fax 317/876-8155
TABLE OF CONTENTS
Page No.
EXECUTIVE SUMMARY .............................................................................................................. 1
PROJECT INFORMATION ........... ...................................... .... .... ...... ........ .......... ................... ....... 2
· Project Authorization ........ ....... ............... .............. ...... .......... ........................ ...... 2
· Project Description................ ... .... .... .... .... ........ ...... ............ ..... ...... .... .... ...... ........ 2
· Purpose and Scope of Services......................................................................... 3
SITE AND SUBSURFACE CONDITIONS. .......... ...... ..................... ............ ............ ..... ........ ......... 5
· Site Location and Description ............................................................................5
· Site Geology......... ............ .......... .......... ............ .... ...... ........ .... .... ...... ............ .... .... 5
· Subsurface Conditions ....... ....... ...... ...... ....... ................. .............. ............... ........ 6
· Groundwater Information ....... ............... ....... ..... ............ .......... .............. ......... .... 7
EV ALUA TION AND RECOMMENDATIONS ...............................................................................9
. Geotechnical Discussion ........... ...... .................... .......... .............. .......... ...... ....... 9
. Site Preparation....... ...... .................... ............. .... ........ .............. ....................... .... 9
· Foundation Recommendations ................................ ............ .... ........................ 12
. Seismic Design Considerations .......................................................................13
. Floor Slab Recommendations......................... ...... ................. ...... .... ................ 14
· General Pavement Recommendations ............................................................16
· Pavement Subgrade Preparation .....................................................................17
. Pavement Drainage & Maintenance................................................................. 17
CONSTRUCTION CONSiDERATIONS..... ...... ....... .... .... .... ..... ... ...................... ............. ........ ..... 19
· Moisture Sensitive SoilslWeather Related Concerns ....................................19
· Drainage and Groundwater Considerations ................................................... 20
· Excavations ... ........ ..................... ...... ........ ........ .... .............. .... ...... .... .... ... .... ...... 21
GEOTECHNICAL RiSK.............................................................................................................. 23
REPORT LIMITATIONS .......... ................. ...... .... ...... ........ ............. .......... ........ ................. .......... 24
APPENDIX
SITE VICINITY MAP
SOIL BORING LOCATION PLAN
GENERAL NOTES
SOIL BORING LOGS (15)
UNIFIED SOIL CLASSIFICATION SYSTEM
-1-
EXECUTIVE SUMMARY
PSI has completed a preliminary exploration and evaluation of the subsurface for the proposed
Center Pointe Crossing Retail Development in Zionsville, Indiana. The 37-acre parcel is located
on the west side of Michigan Road between 111 th Street and Bennett Parkway Drive. The
proposed construction will consist of one main retail box structure with several outlots. The
main retail structure is preliminarily located on the southwest quadrant of the parcel. 204,000
square feet of building footprint in main retail structure is proposed as a single-story, steel-framed,
slab-on-grade construction. The basis of report includes column loads not exceeding 150 kips and
continuous or wall loads not exceeding 3-5 kips per lineal foot. Several outlot structures ranging
from about 3,000 to 30,000 square feet in area are preliminarily located on the north and east sides
of the site.
Soil borings have been drilled and selected soil samples tested in the laboratory. In general,
beneath about 8 to 10 inches of topsoil the subsurface materials consisted of silty clay and fat clay
with discontinuous layers of silty fine to coarse sand. The borings were terminated at
predetermined depths of 30 feet, without encountering refusal. Based on the soil boring data, PSI
estimates the groundwater level at the time of drilling may have been at or below a depth of about 8
to 13 feet below existing grade.
Soft soils with an N-value of 5 blows per foot or less were encountered in nine of the 15 borings,
and may require removal prior to placement of foundations.
The results of this exploration indicate that the subsurface conditions at the site are generally
suitable for the use of shallow foundations for support of the proposed structural loads, subject to
proper subgrade preparation. The floor slab can be grade supported. Details related to site
development, foundation and general pavement design, and construction considerations are
included in subsequent sections of this report.
The moisture contents of the surficial soils varied greatly from 9 to 26 percent and may require
moisture content control prior to placement as engineered fill.
Liquid limits on the tested near surface soils ranged from 48 to 54 percent. Soils with a liquid limit
higher than 40 percent are unsuitable for use as engineered fill.
Subsequent to this preliminary investigation, additional borings are recommended for the subject
property prior to the submittal of a final geotechnical report for the referenced project.
The owner/designer should not rely solely on this Executive Summary. This summary does
not contain all the information that is found in the full report. The report must be read in its
entirety to obtain a more complete understanding of the information provided, and to aid in
any decisions made or actions taken based on this information.
PSI Project No. 016-55037, Center Pointe Crossing Retail Development
Professional Service Industries, Inc.
-2-
PROJECT INFORMATION
Project Allthori7ation
Professional Service Industries, Inc. (PSI) has completed a geotechnical exploration for the
proposed retail development in Zionsville, Indiana. PSI's services were authorized by Mr. Andrew
Gerdom of American Consulting, Inc. on August 18, 2005 by signing our proposal. This exploration
was accomplished in general accordance with PSI Proposal No. 016-550078 dated August 18,
2005.
PrQject De~cription
Project information was provided by Mr. Christopher L. Hinkle of American Consulting, Inc. on
August 12, 2005. PSI has also been furnished with a architectural site plan titled, "Michigan Retail-
Indiana", dated August 5, 2005, prepared by Concept Design Group. On September 1, 2005,
American Consulting, Inc. has also furnished PSI with an updated architectural site plan titled,
"Michigan Retail - Indiana", dated August 31, 2005. PSI understands the proposed construction
layout provided to us is preliminary. Information regarding the project site and construction, as it is
proposed at this time, is outlined below:
Site Location and Information
· 37-acre parcel
· West side of Michigan Road between 111th Street and Bennett Parkway Drive
· Current land use is undeveloped and is presently grass and weed covered
· Accessible to a truck-mounted drill rig during dry weather
Building
· One main retail box structure with several outlots
· Main retail structure preliminarily located on the southwest quadrant of the parcel
· Single-story, steel-framed, slab-on-grade construction without a basement
· 204,000 square feet of building footprint in main retail structure
· Column loads not exceeding 150 kips (basis of report)
· Continuous or wall loads not exceeding 3-5 kif (basis of report)
· Several outlot structures ranging from about 3,000 to 30,000 square feet in area - north and
east of main structure
PSI Project No. 016-55037, Center Polnte Crossing Retail Development
Professional Service Industries, Inc.
-1-
Grading
. Proposed based on less than 2 feet of cutlfill in building areas
. Proposed based on less than 5 feet of cut/fill across the property
. Stormwater detention pond, to be wet under normal conditions, estimated to be about 8 feet
deep, preliminarily located just west of the main retail structure
Pavement
. Proposed asphaltic pavements and drives
. Preliminarily located primarily 1) between the main structure and the outlots along the west
side of Michigan Road, and 2) north of the main structure, dedicated to the larger outlots
. A pavement section design was not requested of PSI and is not being provided in the scope
of this report
The geotechnical recommendations presented in this report are based on the available project
information, building location, and the subsurface conditions described in this report. If PSI's basis
of report or understandings of the project are considered incorrect or if conditions during
construction are significantly different from those described in this report, please inform PSI
immediately in writing so that PSI may amend the recommendations presented in this report if
appropriate and if desired by the client. PSI will not be responsible for the implementation of its
recommendations when it is not notified of changes in the project.
Purpm~e and Scope of Services
The purpose of this study was to explore the subsurface conditions at the site in order to develop
earthwork and foundation related design recommendations for the proposed construction. PSI's
scope of services included drilling 15 soil borings at the site to depths of about 30 feet below the
existing ground surface, select laboratory testing, and preparation of this geotechnical report. PSI
based the preliminary soil boring program on a discussion with Andy Gerdom of American
Consulting, Inc. in a meeting with PSI's Business Development Manager, Andrew Mcintyre.
This report briefly outlines the testing procedures, presents available project information, describes
the site and subsurface conditions, and presents geotechnical recommendations regarding the
following:
PSI Project No. 016-55037, Center Pointe Crossing Retail Development
Professional Service Industries, Inc.
-4-
. Available project information
. Site topographic information and surface conditions
. Review of geologic setting
. Review of subsurface conditions
. Review of field and laboratory test procedures and test data
. Subgrade preparation planning recommendations
. Site grading and cut/fill planning recommendations
. Geotechnical seismic design parameters per IBC 2003.
· Recommendations pertaining to what preliminary design and construction can be used in
the planning of:
· Foundations, including suitable foundation type(s), preliminary allowable bearing
pressure(s), and estimated settlement
· Floor slabs
· Subgrade preparation for pavement areas including drainage considerations and an
estimated CBR value, based on anticipated subgrade soil conditions. (A specific
recommendation for pavement section thickness was not requested and is not
included in the scope).
· Construction considerations, including temporary excavation and construction control of
water.
. Recommendations for the final geotechnical report
The scope of services did not include an environmental assessment for determining the presence
or absence of wetlands, or hazardous or toxic materials in the soil, bedrock, surface water,
groundwater, or air on or below, or around this site. Any statements in this report or on the boring
logs regarding odors, colors, and unusual or suspicious items or conditions are strictly for
informational purposes. Prior to development of this site, an environmental assessment is
advisable.
PSI's scope of services did not include any service to investigate or detect the presence of
moisture, mold or other biological contaminates in or around any structure, or any service that was
designed or intended to prevent or lower the risk of the occurrence of the amplification of the same.
Mold is ubiquitous to the environment with mold amplification occurring when building materials are
impacted by moisture. Site conditions are outside of PSI's control, and mold amplification will likely
occur, or continue to occur, in the presence of moisture. As such, PSI cannot and shall not be held
responsible for the occurrence or recurrence of mold amplification.
PSI Project No. 016-55037, Center Pointe Crossing Retail Development
Professional Service Industries, Inc.
-5-
SITE AND SUBSURFACE CONDITIONS
Sih~ Lncation and De~criptinn
The approximately 37-acre site for the proposed retail development is located at the southwest
corner of Bennett Parkway and Michigan Road in Zionsville, Indiana. It is bordered by Bennett
Parkway to the north, commercial development and grassed areas to the south and west, and
Michigan Road to the east. The site latitude and longitude is approximately N 39056'48" and W
86014'28", respectively. The general site location is shown on Figure 1, Site Vicinity Map, in the
Appendix of this report.
Ground surface elevations across the site ranged from a minimum of approximately 895 feet at the
northwest corner to approximately 903 feet near the center of the northeast quadrant of the site. At
the proposed 204,000 square foot building in the southwest corner, the ground surface elevations
ranged from about 896 feet to about 902 feet. The ground surface elevations were interpolated
from the topographic survey prepared by Concept Design Group. The project elevations are
referenced to the National Geodetic Vertical Datum (NGVD).
A treeline running west to east separates the site approximately in half. The northern half of the
site is covered with weeds and tall grass, while the southern half is an agricultural field covered in
mature corn at the time of drilling. The surficial soils were firm at the time of the field exploration.
PSI's rubber tired all terrain vehicle (A TV) mounted-drill rig experienced no significant difficulty in
moving about the site.
Site Geology
Based on the regional geologic map for Indianapolis, Indiana, unconsolidated sediment deposits
at the project area consist of mainly loam till sheets of low relief from the Wisconsinan Age Glacier.
Based on regional geologic mapping, the thickness of the unconsolidated sediment deposits in
the project area is approximately 150 to 200 feet. The site is mapped as underlain by New
Albany Shale.
PSI Project No. 016-55037, Center Pointe Crossing Retail Development
Professional Service Industries, Inc.
-6-
Subsurface Conditions
The site subsurface conditions were explored with 15 soil test borings, 11 within the proposed
building areas, one in the proposed detention pond area and three within parking and drive areas.
The borings were advanced to a depth of 30 feet. .
The boring locations and depths were suggested by PSI and reviewed with the client prior to
drilling. PSI personnel staked the borings in the field by measuring distances from available surface
features. As instructed by Andy Gerdom of American Consulting, Inc., on August 24,2005, boring
locations were adjusted in the field to minimize damage to existing corn. The surface elevations at
the borings were interpolated to the nearest foot from the provided drawing.
The borings were advanced utilizing 3%-inch inside diameter hollow stem auger drilling methods
and soil samples were routinely obtained during the drilling process. Select soil samples were later
tested in PSI's laboratory to document material properties to be used in the recommendations.
Drilling, sampling, and laboratory testing were accomplished generally in accordance with ASTM
procedures.
The subsurface conditions below the 8 to 10 inches of topsoil, as identified by the 15 borings
primarily include silty medium to fat clay. These materials are described in more detail in the
following paragraphs.
Silty medium to fat clay with moisture contents generally above 20% generally extend to a depth
of 5 feet. N-values were typically between 5 and 14, but were as high as 21 blows per foot in
boring 8-13 and as low as 2 in boring 8-10 in the samples taken at a depth of 2.5 feet.
Occasional sand seams were encountered in seven of the borings. N-values typically increased
below a depth of 20 feet with an increase in granular content of the soil. Layers of silty fine to
coarse sand were encountered in five borings at depths ranging from 14 feet at borings 8-7 and
8-9 and as deep as 19 feet at boring 8-5. The layer extended as deep as 29 feet below existing
grade at boring 8-1. Sampler refusal, where 50 blows advanced the split spoon less than 6
inches, was encountered in borings 8-1 and 8-2 at samples taken 20 feet and deeper.
PSI Project No. 016-55037, Center Pointe Crossing Retail Development
Professional Service Industries, Inc.
-7-
The following table briefly summarizes the range of results from the field and laboratory testing
programs. Please refer to the attached boring logs and laboratory data sheets for more specific
information:
Silty medium to fat clay
Silty clay
Gray silty clay
0.7 -5
5-13
5 -14
9-22
48"':'54 15-17
2-18 11-22119-1260.78-0.81
13-30 6-50+ 7-14
Silty fine to coarse sand 14 - 29 15 - 57+
The above subsurface description is of a generalized nature to highlight the major subsurface
stratification features and material characteristics. The boring logs included in the Appendix should
be reviewed for specific information at individual boring locations. These records include soil/rock
descriptions, stratifications, penetration resistances, and locations of the samples and laboratory
test data. The stratifications shown on the boring logs represent the conditions only at the actual
boring locations. Variations may occur and should be expected between boring locations. The
stratifications represent the approximate boundary between subsurface materials and the actual
transition may be gradual. Water level information obtained during field operations is also shown
on these boring logs. The samples that were not altered by laboratory testing will be retained for 60
days from the date of this report and then will be discarded.
Groundwater Information
Water levels were measured in the borings during and at completion of drilling. The driller reported
water in 7 of the 15 borings at depths of about 12% to 23 feet below existing grade, approximately
PSI Project No. 016-55037, Center Pointe Crossing Retail Development
Professional Service Industries, Inc.
-8-
elevation 877 to 886 feet, during drilling. The water levels at completion of drilling, following
removal of the augers, in 4 of the 15 borings ranged from 3 to 14 feet below existing grade. In the
remaining borings, no free water was observed in the borehole or on the sampling tools. These
conditions indicate that the continuous groundwater level at the site at the time of the exploration
was either below the terminated depths of the borings, or that the soils encountered were relatively
impermeable.
In fine-grained soils such as the silty clay at this site, the water levels in the boreholes often are not
representative of the actual groundwater level, because the boreholes remain open for a relatively
short time. To obtain longer-term measurements, it is necessary to install water level observation
wells or piezometers. In fine-grained soils, the depth of the soil color change from brown to gray'
can be an indicator of the prevailing groundwater level. Above the prevailing groundwater level,
fine-grained soils tend to oxidize to a brown color. At this site, the transition from brown to gray
soils generally occurred at a depth of about 8 to 14 feet below existing grade, at about elevation
882 to 892 feet.
Based on the water level observations during drilling, the moisture content of the recovered
granular soil samples, and the depth of color change of fine-grained soils in the borings, PSI
estimates the prevailing groundwater level may be at or below a depth of about 8 feet below
existing grade, at approximately elevation 887 to 894 feet.
The groundwater level at the site, as well as perched water levels and volumes, will fluctuate based
on variations in rainfall, snowmelt, evaporation, surface run-off and other related hydrogeologic
factors. The groundwater levels discussed in this section, and shown on the boring logs, represent
the conditions at the time the observations were made.
PSI Project No. 016-55037, Center Pointe Crossing Retail Development
Professional Service Industries, Inc.
-9-
EVALUATION AND RECOMMENDATIONS
Geotechnical Discussion
The following geotechnical related recommendations have been developed on the basis of the
subsurface conditions encountered and PSI's understanding of the proposed development. Should
changes in the project criteria occur, a review must be made by PSI to determine if modifications to
our recommendations will be required.
There are two primary geotechnical related concerns at this site, which will effect the performance
of the foundations for this structure. The following summarizes those concerns:
1. High Plasticity clays were encountered in the exploration that could require remediation.
2. Drying of some of the on site soils may be required to achieve proper compaction during
grading.
Fat (high plasticity) clay was encountered and tested in boring 8-9 on the southeast corner of the
site, near the proposed entrance off of Michigan Road. This potentially expansion soil should be
undercut by a depth of two feet and replaced with lower plasticity soil. Additional Atterberg limit
tests should be performed on soils in areas that are proposed to be used for engineered fill.
Soft soils, with N-values of 5 blows per foot or less were encountered in borings 8-1, 8-3, 8-5, 8-6,
8-7, 8-9 and 8-10, 8-12 and 8-14. Additional borings are recommended in these areas to identify
the extent of soft soils that may be required to be removed.
Sih~ Preparation
PSI recommends that topsoil, vegetation, roots, and soft soils in the construction areas be stripped
from the site and either wasted or stockpiled for later use in non-load bearings areas. Depths of
topsoil in PSI's borings ranged from 8 to 10 inches. Depths of soft soils encountered were up to 12
PSI Project No. 016-55037, Center Pointe Crossing Retail Development
Professional Service Industries, Inc.
-10-
feet below existing grade at boring B-3. The depth of removal should be determined by a
representative of the geotechnical engineer at the time of construction.
After stripping and excavating to the proposed subgrade level, as required, the building and parking
areas should be thoroughly proof-rolled with a loaded tandem axle dump truck or similar piece of
heavy rubber tired vehicle (typically with an axle load greater than 9-tons). Soils that are observed
to rut or deflect excessively (typically greater than 1-inch) under the moving load should be undercut
and .replaced with properly compacted fill. The proofrolling and undercutting activities should be
observed and documented by a representative of the geotechnical engineer and should be
accomplished. during a period of dry weather. Soft, loose or unstable areas revealed by the
proofrolling should be stabilized by additional compaction or undercut and replaced with engineered
fill or crushed aggregate. When backfilling impervious subgrades with granular soil, a means of
drainage should be provided, such as edge drains, drain tiles, or if the slope warrants, gravity
draining the granular material to a surface exit point.
If proofrolling is performed following a warm and dry period, the need for surface repairs may
generally be limited to localized areas. However, if subgrade preparation must proceed during
unfavorable wet and/or cool weather periods, such as early spring or late fall, more extensive
surface repairs will likely be required, as discussed in the Construction Considerations section of
this report.
After stripping, cutting to grade and proofrolling have been completed, fill placement to establish
construction grades may begin. The first layer of fill should be placed in a relatively uniform
horizontal lift and be adequately keyed into the stripped and scarified subgrade soils. Engineered
fill materials to be placed within building and pavement areas should be free of organic or other
deleterious materials, have a maximum particle less than 3 inches, and have a liquid limit less than
40 and a plasticity index less than 25.
None of the on site soils samples in the upper 3 feet that were tested for Atterberg limits are
suitable for use as engineered fill for site grading within building and pavement areas. If the on-site
PSI Project No. 016-55037, Center Polnte Crossing Retail Development
Professional Service Industries, Inc.
-11-
silty clay soils or imported fine-grained clay soils are used for fill, close moisture content control will
be required to achieve the recommended degree of compaction. The moisture contents majority of
the near surface silty clay soils vary greatly from 9 to 26 percent and will likely require moisture
content adjustment prior to placement .as engineered fill. Optimum moisture contents for the silty
clay soils are anticipated to be in the range of 12 of 18 percent and Proctor testing should be
performed on the actual soils used. PSI anticipates disking and aeration during a warm, dry period
will likely be necessary to lower the moisture content in areas where surficial soils are above this
range. If engineered fill placement must proceed during a wet or cool time of the year, it will likely
be infeasible to re-use the on-site soils as engineered fill, and imported fill materials will be required.
If wet or cool season earthwork is necessary, PSI recommends the use of imported fill materials
meeting the requirements of Indiana Department of Transportation (INDOT) 1999 Standard
Specifications Section 211, "B" Borrow.
In utility trenches, shallow foundation excavations, and other areas where large compaction
equipment cannot be used, granular engineered fill should be placed as backfill. Granular
engineered fill should also be used for backfill of loading dock retaining walls. PSI recommends the
use of material meeting Indiana Department of Transportation (INDOT) 1999 Standard
Specification Section 211, Structure Backfill, for use as granular engineered fill. Engineered fill
should be placed in accordance with the recommendations previously stated in this section of the
report.
The fill placed shall be tested and documented by a geotechnical technician and directed by a
geotechnical engineer to evaluate the placement of fill material. It should be noted that the
geotechnical engineer of record can only certify the testing that is performed and the work observed
and documented by that engineer or staff in direct reporting to that engineer. The following table
summarizes the recommended compactive effort for various types of engineered fills.
PSI Project No. 016-55037, Center Pointe Crossing Retail Development
Professional Service Industries, Inc.
-12-
Modified 90% -2 to +2 %
Modified 90% -2 to +2 %
Relative 75% >95%
" Saturation
Densi
Modified 88% -3 to +3 %
Utility Trench Backfill! Wall Modified 90% -2 to +2 %
Backfill
1
1
1 per 1,000 cy offill placed
1 per 200 cy of fill placed
Other -2 to +2 % 1 er 1 000 c of fill laced
"Relative Density as determined in general accordance with ASTM 04253 and 04254
"-2 Minimum of 1 test per lift
Foundation Recommendatinn~
The planned construction can be supported on conventional spread footing foundations bearing on
either competent naturally deposited silty clay natural soils or properly compacted structural fill
placed on suitable natural soils. Spread footings for building columns and continuous footings for
bearing walls may be designed for allowable soil bearing pressures of 2500 psf and 2000 psf,
respectively, based on dead load plus design live load. Minimum plan dimensions of 24 inches for
column footings and 18 inches for continuous footings should be used in foundation design to
provide an acceptable factor of safety against a local bearing capacity failure and provide adequate
room for cleaning of the bearing surface.
Exterior footings and footings in unheated areas should bear at a depth of at least 36 inches below
the final exterior grade to provide adequate frost protection. If the building is to be constructed
during the winter months or if footings will likely be subjected to freezing temperatures after
foundation construction, then all footings should be adequately protected from freezing. Otherwise,
interior footings can be located on acceptable bearing materials at nominal depths compatible with
architectural and structural considerations.
The foundation excavations should be observed and documented by a representative of PSI prior
to steel or concrete placement to assess that the foundation materials appear consistent with the
PSI Project No. 016-55037, Center Pointe Crossing Retail Development
Professional Service Industries, Inc.
-11-
materials discussed in this report and thereby capable of supporting the design loads. Soft or loose
soil zones encountered at the bottom of the footing excavations, as indicated by a dynamic cone
penetrometer (DCP) correlating to an "N-value" of less than 7, should be removed to the level of
suitable natural soils, and replaced with or adequately compacted structural fill. Fill placed below
the foundations where unsuitable materials are removed should extend one (1) foot outside the
foundation limits for every one (1) foot in thickness between the intended bearing surface and the
underlying, suitable natural soils. Alternately, the foundations may be extended through the
unsuitable soils to bear on the underlying suitable material.
After opening, foundation bearing surfaces should be observed and tested and concrete placed as
quickly as practical to limit exposure of the footing bottoms to water and construction traffic.
Surface run-off water should be drained away from the excavations and not be allowed to pond.
The foundation concrete should be placed during the same day the excavation is made. If
foundation excavations must be left open for more than one day, they should be protected by
placement of a lean concrete mud mat or a 3 to 4 inch thick layer of compacted crushed aggregate
such as INDOT No. 53 crushed aggregate.
Based on results of the field tests and the anticipated foundation loads, PSI estimates that the
maximum foundation settlement may be about % to 1 inch. Differential settlement between two
adjacent columns may be about one-half of the total settlement. While settlement of this magnitude
is generally considered tolerable for structures of the type proposed, the design of masonry walls
should include provisions for liberally spaced, vertical control joints to minimize the affects of
cosmetic cracking.
Sp-i~mic Dp-~ign Con~iderations
The 2000 (or 2003) International Building Code requires a site class for the calculation of
earthquake design forces. This class is a function of soil type (Le., depth of soil and strata types).
Soil borings at the project site extended to depths of up to 30 feet. Based on regional geologic
mapping, PSI anticipates that the subsurface conditions below the explored depth may generally
PSI Project No. 016-55037, Center Pointe Crossing Retail Development
Professional Service Industries, Inc.
-14-
consist of glacial till. Based on PSI's review of the available data, and knowledge of regional
geology, PSI evaluated the Site Class using the weighted average of known and estimated
Standard Penetration Test (SPT) N-values, soil shear strength estimated from the field and
laboratory tests and regional geologic information. Site Class" C " is recommended. The USGS-
NEHRP probabilistic ground motion values interpolated between the nearest four grid points from
latitude 39.94670 and longitude -86.24110 are as follows:
PGA 7.58
0.2 (S5) 18.16 1.20
0.3 16.68
1.0 (S1) 9.00 1.70
The Site Coefficients, Fa and Fv were interpolated for IBC 2000 Tables 1615.1.2(1) and 1615.1.2(2)
as a function of the site classifications and the mapped spectral response acceleration at the short
(S5) and 1 second (S1) periods.
Floor Slab Recommendations
The floor slab can be grade supported on native silty clay soil or properly compacted/engineered fill.
Proofrolling, as discussed in this report, should be accomplished to identify soft or unstable soils
that should be removed from the floor slab area prior to fill placement and/or floor slab construction.
High plasticity clays below floor slabs should be remediated, as discussed earlier.
For subgrade prepared as recommended and properly compacted fill, a modulus of subgrade
reaction, k value, of 140 pounds per cubic inch (pci) may be used in the grade slab design based
on values typically obtained from 1 foot x 1 foot plate load tests. However, depending on how the
slab load is applied, the value will have to be geometrically modified. The value should be adjusted
for larger areas using the following expression for cohesive and cohesionless soil:
PSI Project No. 016-55037, Center Pointe Crossing Retail Development
Professional Service Industries, Inc.
-15-
Modulus of Subgrade Reaction, ks = (~) for cohesive soil and
ks = k ( ~~ 1 )2 for cohesion less soil
where: ks = coefficient of vertical subgrade reaction for loaded area,
k = coefficient of vertical subgrade reaction for 1 x1 square foot area, and
B = width of area loaded, in feet
PSI recommends that a minimum four-inch thick free draining granular mat be placed beneath the
floor slab to enhance drainage. The soil surface shall be graded to drain away from the building
without low spots that can trap water prior to placing the granular drainage layer. Polyethylene
sheeting should be placed to act as a vapor retarder where the floor will be in contact with moisture
sensitive equipment or product such as tile, wood, carpet, etc., as directed by the design engineer.
The decision to locate the vapor retarder in direct contact with the slab or beneath the layer of
granular fill should be made by the design engineer after considering the moisture sensitivity of
subsequent floor finishes, anticipated project conditions and the potential effects of slab curling and
cracking. The floor slabs should have an adequate number of joints to reduce cracking resulting
from differential movement and shrinkage.
The precautions listed below should be followed for construction of slab-on-grade pads. These
details will not reduce the amount of movement, but are intended to reduce potential damage
should some settlement of the supporting subgrade take place. Some increase in moisture content
is inevitable as a result of development and associated landscaping. However, extreme moisture
content increases can be largely controlled by proper and responsible site drainage, building
maintenance and irrigation practices.
. Cracking of slab-on-grade concrete is normal and should be expected. Cracking can occur not
only as a result of heaving or compression of the supporting soil and/or bedrock material, but
PSI Project No. 016-55037, Center Pointe Crossing Retail Development
Professional Service Industries, Inc.
- 1 h-
also as a result of concrete curing stresses. The occurrence of concrete shrinkage crack, and
problems associated with concrete curing may be reduced and/or controlled by limiting the
slump of the concrete, proper concrete placement, finishing, and curing, and by the placement
of crack control joints at frequent intervals, particularly where re-entrant slab corners occur. The
American Concrete Institute (ACI) recommends a maximum panel size (in feet) equal to
approximately three times the thickness of the slab (in inches) in both directions. For example,
joints are recommended at a maximum spacing of twelve (12) feet based on having a four-inch
slab. PSI also recommends that the slab be independent of the foundation walls. Using fiber
reinforcement in the concrete can also control shrinkage cracking.
. Areas supporting slabs should be properly moisture conditioned and compacted. Backfill in all
interior and exterior water and sewer line trenches should be carefully compacted to reduce the
shear stress in the concrete extending over these areas.
Exterior slabs should be isolated from the building. These slabs should be reinforced to function as
independent units. Movement of these slabs should not be transmitted to the building foundation or
superstructure.
General Pavement Recnmmendation~
PSI's scope of services did not include extensive sampling and CBR testing of existing subgrade or
potential sources of imported fill for the specific purpose of detailed pavement section analysis.
Instead, PSI has based this report on pavement-related design parameters that are considered to
be typical for the area soils types. A CBR value of 3 may be used for pavem~nt design.
In large areas of pavement, or where pavements are subject to significant traffic, a more detailed
analysis of the subgrade and traffic conditions should be made. The results of such a study will
provide information necessary to design an economical and serviceable pavement.
Pavement for the dumpster area should be constructed of at least 8-inch thick, properly reinforced,
Portland cement concrete with load transfer device installed where construction joints are required.
A thickened edge is recommended on the outside of slabs subjected to wheel loads. This
PSI Project No. 016-55037, Center Pointe Crossing Retail Development
Professional Service Industries, Inc.
-17-
thickened edge usually takes the form of an integral curb. Fill material should be compacted behind
the curb or thicken edge of the outside slabs. The following are recommended to enhance the
quality of the pavement.
.
Moisten subgrade just prior to placement of concrete.
Cure fresh concrete with a liquid membrane-forming curing compound.
Keep automobile traffic off the slab for 3 days and truck traffic off the slab for 7 days, unless
tests are made to determine that the concrete has gained adequate strength (Le., usually 3,000
psi)
.
.
Pavement SlIhgrade Preparation
Prior to paving, the prepared subgrade should be proofrolled using a loaded tandem axle dump
truck or similar type of pneumatic tired equipment with a minimum gross weight of 9 tons per single
axle. Localized soft areas identified should be repaired prior to paving. Moisture content of the
subgrade be maintained between -2% and +3% of the optimum at the time of paving. It may
require rework when the subgrade is either desiccated or wet.
Construction traffic should be minimized to prevent unnecessary disturbance of the pavement
subgrade. Disturbed areas, as verified by PSI, should be removed and replaced with properly
compacted material.
Pavement Drainage & Maintenance
PSI recommends pavements be sloped to provide rapid surface drainage. Water allowed to pond
on or adjacent to the pavement could saturate the subgrade and cause premature deterioration of
pavements, and removal and replacement may be required. Consideration should be given to the
use of interceptor drain to collect and remove water collecting in the granular base. The interceptor
drains could be incorporated with the storm drains of other utilities located in the pavement areas.
Periodic maintenance of the pavement should be anticipated. This should include sealing of cracks
and joints and by maintaining proper surface drainage to avoid ponding of water on or near the
PSI Project No. 016-55037, Center Polnte Crossing Retail Development
Professional Service Industries, Inc.
-1 R-
pavement area.
PSI Project No. 016-55037, Center Pointe Crossing Retail Development
Professional Service Industries, Inc.
-19-
CONSTRUCTION CONSIDERATIONS
PSI should be retained to provide observation and testing of construction activities involved in the
foundations and pavements, earthwork, and related activities of this project. PSI cannot accept any
responsibility for any conditions that deviate from those described in this report, nor for the
performance of the foundations and pavements if not engaged to also provide construction
observation and testing for this project.
Moi~hJre Sen~itive Snil~lWeather Related Concern~
The upper silty medium to fat clay soils encountered at this site are expected to be sensitive to
disturbances caused by construction traffic and changes in moisture content. During wet weather
periods, increases in the moisture content of the soil can cause significant reduction in the soil
strength and support capabilities. In addition, soils that become wet may be slow to dry and thus
significantly retard the progress of grading and compaction activities. It will, therefore, be
advantageous to perform! earthwork and foundation construction activities during dry weather.
If proofrolling is performed following a warm and dry period, the need for surface repairs may
generally be limited to localized areas. However, if subgrade preparation must proceed during
unfavorable wet and/or cool weather periods, such as early spring or late fall, more extensive
surface repairs will likely be required. For subgrade areas that exhibit unsuitable deflection, rutting
and pumping during proofrolling, the following alternatives can be considered to continue with
construction and earthwork activities:
.
Undercutting and replacement with crushed aggregate, as recommended in the Site
Preparation section of this report
Undercutting and replacement with a geogrid or geotextile and a lesser thickness of crushed
aggregate
Lime kiln dust or other chemical stabilization
.
.
For localized unstable subgrade areas, undercutting and replacement with crushed aggregate is
generally the most cost-effective alternative. For larger areas, or severe subgrade instability,
PSI Project No. 016-55037, Center Pointe Crossing Retail Development
Professional Service Industries, Inc.
-20-
incorporation of a geogrid and/or geotextile may be warranted. The depth of undercutting,
geogrid/geotextile selection, and thickness of crushed aggregate should be evaluated by the
geotechnical engineer based on the conditions at the time of construction.
If subgrade preparation must proceed during a period of wet weather, and widespread areas of the
subgrade are unstable, undercutting may be time consuming and costly. It may be impossible to
effectively dry the soil if conditions are wet and temperatures low. In these circumstances, PSI
anticipates lime kiln dust or other chemical stabilization would be a preferable alternative. Based on
the near surface soils encountered in the borings, PSI anticipates lime kiln dust is likely to be the
most appropriate admixture for chemical stabilization at this site. If the use of lime kiln dust is
contemplated, PSI should be consulted to develop appropriate guidelines for bench testing if
warranted, percentage of lime kiln dust, placement, milling, compaction, and protection of
completed subgrades.
As discussed in the Subgrade Preparation section of this report, if earthwork must proceed during
other than summer months, it may be difficult or impossible to dry the on-site soils for re-use as fill.
If wet or cool season earthwork is necessary, PSI recommends the use of imported fill materials
meeting the requirements of Indiana Department of Transportation (INDOT) 1999 Standard
Specifications Section 211, "B" Borrow.
Drainage and Groundwater ConAiderations
Water should not be allowed to collect in the foundation excavations, on floor slab areas, or on
prepared subgrades of the construction area either during or after construction. Undercut or
excavated areas should be sloped toward one corner to facilitate removal of any collected
rainwater, groundwater, or surface runoff. Positive site surface drainage should be provided to
reduce infiltration of surface water around the perimeter of the building and beneath the floor slabs.
The grades should be sloped away from the building and surface drainage should be collected and
discharged such that water is not permitted to infiltrate the backfill and floor slab areas of the
building.
PSI Project No. 016-55037, Center Pointe Crossing Retail Development
Professional Service Industries, Inc.
-21-
Groundwater was measured in the boring 8-9 at depths of 12 % to 23 foot at boring 8-8. However,
it is possible that seasonal variations will cause fluctuations, or a water table to be present in the
upper soils at a later time. Additionally, perched water may be encountered in discontinuous zones
within the overburden. PSI anticipates groundwater or perched water seepage and surface
drainage can likely be managed by localized dewatering using conventional sump and pump
methods.
Footing drains should be installed where foundations are placed within a relatively impervious
subgrade and backfilled with granular soils. This will prevent the build up of water within the
foundation excavations.
Excavations
In Federal Register, Volume 54, No. 209 (October 1989), the United States Department of Labor,
Occupational Safety and Health Administration (OSHA) amended its "Construction Standards for
Excavations, 29 CFR, part 1926, Subpart P". This document was issued to better provide for the
safety of workers entering trenches or excavations. This federal regulation mandates that
excavations, whether they be utility trenches, basement excavation or footing excavations, be
constructed in accordance with the OSHA guidelines. It is PSI's understanding that these
regulations are being strictly enforced and if they are not closely followed, the owner and the
contractor could be liable for substantial penalties.
The contractor is solely responsible for designing and constructing stable, temporary excavations
and should shore, slope, or bench the sides of the excavations as required to maintain stability of
both the excavation sides and bottom. The contractor's "responsible person", as defined in 29 CFR
Part 1926, should evaluate the soil exposed in the excavations as part of the contractor's safety
procedures. In no case should slope height, slope inclination, or excavation depth, including utility
trench excavation depth, exceed those specified in local, state, and federal safety regulations.
PSI Project No. 016-55037, Center Polnte Crossing Retail Development
Professional Service Industries, Inc.
-22-
PSI is providing this information solely as a service to American Consulting, Inc. PSI does not
assume responsibility for construction site safety or the contractor's or other parties' compliance
with local, state, and federal safety or other regulations.
PSI Project No. 016-55037, Center Pointe Crossing Retail Development
Professional Service Industries, Inc.
-21-
GEOTECHNICAL RISK
The concept of risk is an important aspect of the geotechnical evaluation. The primary reason for
this is that the analytical methods used to develop geotechnical recommendations do not comprise
an exact science. The analytical tools which geotechnical engineers use are generally empirical
and must be used in conjunction with engineering judgment and experience. Therefore, the
solutions and recommendations presented in the geotechnical evaluation should not be considered
risk-free and, more importantly, are not a guarantee that the interaction between the soils and the
proposed structure will perform as planned. The engineering recommendations presented in the
preceding section constitutes PSI's professional estimate of those measures that are necessary for
the proposed structure to perform according to the proposed design based on the information
generated and reference during this evaluation, and PSI's experience in working with these
conditions.
PSI Project No. 016.55037, Center Pointe Crossing Retail Development
Professional Service Industries, Inc.
-24-
REPORT LIMITATIONS
The recommendations submitted, in this report, are based on the available subsurface information
obtained by PSI and design details furnished by American Consulting, Inc. for the proposed project.
If there are any revisions to the plans for this project, or if deviations from the subsurface conditions
presented in this report are encountered during construction, PSI should be notified immediately to
determine if changes in the foundation recommendations are required. If PSI is not notified of such
changes, PSI will not be responsible for the impact of those changes on the project.
The geotechnical engineer warrants that the findings, recommendations, specifications, or
professional advice contained herein have been made in accordance with generally accepted
professional geotechnical engineering practices in the local area. No other warranties are implied
or expressed.
After the plans and specifications are more complete, the geotechnical engineer should be retained
and provided the opportunity to review the final design plans and specifications to check that PSI's
engineering recommendations have been properly incorporated into the design documents. At this
time, it may be necessary to submit supplementary recommendations. If PSI is not retained to
perform these functions, PSI will not be responsible for the impact of those conditions on the
project. This report has been prepared for the exclusive use of American Consulting, Inc. for the
specific application to the proposed retail development at Bennett Parkway and Michigan Road in
Zionsville, Indiana.
PSI Project No. 016-55037, Center Pointe Crossing Retail Development
Professional Service Industries, Inc.
APPENDIX
1. Figure 1, Site Vicinity Map
2. Figure 2, Soil Boring Location Plan
3. General Notes
4. Soil Boring Logs (B-1 through B-15)
5. Unified Soil Classification System
PSI Project No. 016-55037, Center Pointe Crossing Retail Development
Professional Service Industries, Inc.
Professional Service Industries, Inc.
o = Site Location ...tT
Source: USGS Carmel & Zionsville IN, 7.5 Minute Topographic Quadrangles, Dated 1988, 1981~
Photorevised N/A, 2001
Project: Center Pointe Crossing Retail Development
Client: American Consulting, Inc.
Location: Zionsville, Indiana
PSI Job No.: 016-55037
Date: September 2005
Scale: 1" = 1 ,600' +/- Fi ure 1
5362 West 78th Street, Indianapolis, Indiana 46268
site
vicinity
map
I
..~ . --- -J:J.....--_......
~............_-...................-......
I .~
~----r
j
\
\
\
\
\
\
\
\
\
\
\
\
\
\
i
II
\
\
\
\
r~
,
,
,
,
,
,
\i)..
\~
\00
\g
B-1 = BORING #
+ AND LOCATION
5362 West 78th Street
Indianapolis, IN 46268
(317) 878.7723
soil boring
location plan
Figure 2
General Notes
DRilliNG & SAMPLING SYMBOLS
SS Split Spoon -1 3/8" 1.0., 2" 0.0. except HA Hand Auger Boring
where noted
ST Shelby Tube - 3" 0.0., except where noted BS Bag Sample
PA Power Auger RC Rock Core with Diamond Bit, NX size, except
where noted
PS Piston Sample - 3" diameter RB Roller Bit
WB Wash Boring NIA Not applicable or available
WS Wash Sample
Standard Penetration Test "N" Value - Blows per foot after an initial 6" seating of a 140 pound hammer falling 30"
on a 2" 0.0. split spoon, except where noted.
Water level Measurement Notations & Symbols
When noted during drilling or
sampling process
After all drilling tools are removed
from borehole
Number of hours after completion
Not Recorded
No measurable water level found in
borehole
Water levels indicated on the boring logs are the
levels measured in the boring at the time indicated.
The accurate determination of ground water levels
may not be possible with short term observations,
especially in impervious soils. The levels shown may
fluctuate throughout the year with variations in
precipitation, evaporation, runoff, and other
hydrogeologic factors.
First
Completion
HR
NIR
Dry
Boulder
Cobbles
Gravel
Gravel
Sand
Sand
Sand
Silt
Clay
Cohesion less Soil
CLASSIFICATION
Relative Densitv
Very Loose
Loose
Medium Dense
Dense
Very Dense
Extremely Dense
"N" Value (Blows/ft)
0-4
5-9
1 0 - 29
30 - 49
50 - 79
Over 80
Consistency
Very Soft
Soft
Medium
Stiff
Very Stiff
Hard
Particle Sizes
Greater than 6" (>152.4mm)
3" to 6" (76.2mm to 152.4mm)
Coarse 1/4" to 3"
(19.05mm to 76.2mm)
Fine (#4) 3/16" to 3/4"
(4.75mm to 19.05mm)
Coarse (#10) to (#4)
(2.00mm to 4.75mm)
Medium (#40) to (#10)
(0.425mm to 2.00mm)
Fine (#200) to (#40)
(0.074mm to 0.425mm)
Minus (#200)
(0.005mm to 0.074mm)
Less than 0.005mm (<O.005mm)
Cohesive Soil
Unconfined Compressive
Strenoth (tons/ft2)
Less than 0.25
0.25 to 0.49
0.50 to 0.99
1.00 to 1.99
2.00 to 3.99
Greater than 4.00
Soil Constituents
Less than 10%
10% to 19%
20% to 34%
35% - 50%
Soil Description TerminoloQY
If clay content is sufficient so that clay appears to dominate soil
properties then clay becomes the primary noun with the other
major soil constituent as modifiers, Le., silty clay. Other minor
soil constituents may be added according to estimates of soil
constituents present, Le., silty clay, trace to some sand.
Trace
Trace to Some
Some
And
Professional Service Industries, Inc.
Engineering. Consulting. Testing
~PSI
...~. 5362 West 78th Street LOG OF BORING B-1
Indianapolis, IN 46268
~.,. Telephone: (317) 876-7723 Sheet 1 of 2
PSI Job No.: 016-55037 Drilling Method: 3 1/4" ID Hollow Stem Auger WATER LEVELS
Project: Center Pointe Crossing Retail Development Sampling Method: Shelby Tube/Split Spoon 5l- While Drilling 17'
Location: 111th Street and Michigan Road Hammer Type: CME Automatic .Y. Upon Completion
Zionsville, Indiana Boring Location: None
:[.. Delay N/A
.s:: STANDARD PENETRATION
Ul <: 0 TEST DATA
c: ~
l Gl Gl 0 "T ~ N in blowslfl @
c C) ci .s:: "B
Gl 0 0. 0 <0:;::; "#.
~ ...J ~ Z c: IE ....rn X ~ PL
C 0 Gl :::;. MATERIAL DESCRIPTION III GlGl e Moisture
Gl III 0.1- . LL Additional
.2 oS :2 Q. ~ III ~
~ 0. Q. E ~ U ~Q. 1 25 Remarks
0. ~ E o() '0
Gl III III 8 en -0 :;
Gl 0 " (/) (/) () co....
iiJ Gl en 1-0 STRENGTH, tsf
a:: ::l Q.~
Surface Elev.: 898.0 ft (/) .. Qu lie Qp
0 2.0 4.0
~.., ~i!!..e':.!E;P~rt~d ~':!QP~QI,=- _ _ _ _ _ _ _
2-2-4 26
N=6
895 SILTY CLAY - some sand, trace gravel - firm CL
- brown
6 3-2-6 21 X
5 N=8
-------------------
18 3-2-3 14
N=5
890
8 2-5-7 22
10 N=12
SILTY CLAY - and sand, trace gravel, with
occasional sand seams - firm - brown to gray CL
@14'
885
2-6-12 10 X 0 *
15 N=18
880
12
1-6-9 11
N=15
20
SILTY FINE TO COARSE SAND - trace
gravel - very dense - moist - gray
875
25 Continued Next Pa e
Completion Depth: 30.0 ft Sample Types:
Date Boring Started: 8/22/05 ~ Auger Cutting ; Shelby Tube
Date Boring Completed: 8/22/05
Logged By: DJL Split-Spoon Hand Auger
Drillin Contractor: PSI, Inc. Rock Core DCP
The stratification lines represent approximate boundaries. The transition may be gradual.
SM
10
2-27-30
N=57
14 *
Latitude:
Longitude:
Remarks:
Bl- PSI
..~. 5362 West 78th Street
Indianapolis, IN 46268
~~. Telephone: (317) 876-7723
Fax. (317) 876-8155
016-55037
Center Pointe Crossing Retail Development
111 th Street and Michigan Road
Zionsville, Indiana
LOG OF BORING B-1
PSI Job No.:
Project:
Location:
Drilling Method:
Sampling Method:
Hammer Type:
Boring Location:
3 1/4" 10 Hollow Stem Auger
Shelby Tube/Split Spoon
CME Automatic
Sheet 2 of 2
WATER LEVELS
'Sl While Drilling 17'
~ Upon Completion None
'5l Delay N/A
.c STANDARD PENETRATION
Ul c: 0 TEST DATA
p e:~
CIl CIl 0 .- Ol
CIl P Ol ci .c "" 'e: N in blows/fl @
~ CIl 0 0. 0 !'l co+:::; <ft.
~ ...J ~ Z g IE ~'" X WI PL
r:: 0 CIl MATERIAL DESCRIPTION Ul CIlCll ~ Moisture
:2 CIl c.. ~ Ul 0.1- ::J . LL Additional
0 ~ c.. 01 ~ll. 1ii
:; Q. 0. E ~ C3 1 25 5 Remarks
lU E lU 0(,) .0 I
> CIl C5 lU 0 en -0 ::;;
CIl 0 en en 0 u ClJ~
W CIl en 1-0 STRENGTH,lsf
0:: ::l ll.~
en .. Qu lIE Qp
25 0 2.0 4.0
SILTY FINE TO COARSE SAND - trace
gravel - very dense - moist - gray
870-
~ B/SS 8
30.
- --- - ---- - ----- - - -- - 9-50/4" 10
SILTY CLAY - and sand, trace gravel - hard - CL
~~------------------
END OF BORING 30'
x
>>S
.. NOTE: Cave-in depth of 3' after removal of
augers
Completion Depth:
Date Boring Started:
Date Boring Completed:
Logged By:
Drillina Contractor:
30.0 ft
8/22/05
8/22/05
!
DJL
PSI, Inc.
Sample Types:
~ Auger Cutting
Split-Spoon
Rock Core
; Shelby Tube
Hand Auger
DCP
Latitude:
Longitude:
Remarks:
The stratification lines represent approximate boundaries. The transition may be gradual.
fBjJ_ PSI
...~. 5362 West 78th Street
Indianapolis, IN 46268
~.,. Telephone: {317} 876-7723
LOG OF BORING B-2
PSI Job No.:
Project:
Location:
016-55037
Center Pointe Crossing Retail Development
111th Street and Michigan Road
Zionsville, Indiana
Drilling Method:
Sampling Method:
Hammer Type:
Boring Location:
3 1/4" ID Hollow Stem Auger
Shelby Tube/Split Spoon
CME Automatic
Sheet 1 of 2
WATER LEVELS
'5l- While Drilling 23'
.Y. Upon Completion None
:l Delay N/A
6 ------------------- 12-50/6" 7
880 20
SILTY CLAY - and gravel, trace to some sand
- very hard to hard - gray
5 1-20-50/3" 9 X >>
CL N=70
::::- Ul
~ ::::- Cl Q) Q)
ci .r::.
Q) 0 Co 0
~ ...J ~ Z ~
c:: 0 Q)
.2 .c:: 1: Q) Q. ~
1il Q. Co Q. E ~
f! E
> Q) 1lI 1lI 0
Q) Cl C> en en 0
[j Ql
0::
0 L..!: .\
6
885 15
MATERIAL DESCRIPTION
.r::. STANDARD PENETRATION
c: 0 TEST DATA
c:~
0 ". g' N in blowslft @
'"
l'l co;:; '#.
!E ...'" X ~ PL
.. QlQ) e Moisture Additional
.. Cot- => . LL
III ~a.. 1ii
U 1 25 Remarks
en oU '0
u iii~ ::!:
en STRENGTH, tsf
~ t-o
a..~ .. Qu * Qp
en
2.0 4.0
2-6-5 10 >>
N=11
Surface Elev.: 900.0 ft
'2..ri~e~~<<?.rt~d ~'~QP~Q.I~ _ _ _ _ _ _ _
SILTY CLAY - and sand, trace gravel, with CL
occasional sand seams - firm to hard - gray
5-5-7 10
N=12
8
875 25 Continued Next Pa e
Completion Depth: 30.0 ft Sample Types:
Date Boring Started: 8/22/05 ~ Auger Cutting ; Shelby Tube
Date Boring Completed: 8/22/05
Logged By: DJL Split-Spoon Hand Auger
Drillin Contractor: PSI, Inc. Rock Core DCP
The stratification lines represent approximate boundaries. The transition may be gradual.
Latitude:
Longitude:
Remarks:
rm- PSI
...~. 5362 West 78th Street
Indianapolis, IN 46268
~.,. Telephone: (317) 876-7723
LOG OF BORING B-2
PSI Job No.:
Project:
Location:
016-55037
Center Pointe Crossing Retail Development
111th Street and Michigan Road
Zionsville, Indiana
Drilling Method:
Sampling Method:
Hammer Type:
Boring Location:
3 1/4" 10 Hollow Stem Auger
Shelby Tube/Split Spoon
CME Automatic
Sheet 2 of 2
WATER LEVELS
'Sl- While Drilling 23'
Y Upon Completion None
'51- Delay N/A
.t: STANDARD PENETRATION
Ul c: 0 TEST DATA
c c~
Q) Q) 0 "7 g'
Q) ~ Cl ci .t: '" N in blowslft @
~ Q) 0 Co 0 B co:.;::::; ;;'1.
~ ....I ~ Z g IE ~'" X ~ PL
c: 0 Q) MATERIAL DESCRIPTION <II Q)Q) e Moisture
Q) <II Col- . LL Additional
.2 .c :c 0. ~ III .a
~ Q. Co 0. E ~ B ~c.. <II 1 25 Remarks
lU E lU 0<"> '0
Q) t5 lU 0 en :;;
Ql 0 en <.) -0
en 0 lD~
iiJ Ql en STRENGTH,lsf
0:: ::J 1-0
c..~
en ... Qu * Qp
25 2.0 4.0
SILTY CLAY - and gravel, trace to some sand
- very hard to hard - gray
19-50/3" 11
x
>>
870 30
END OFBORING-30' - - - - - - - - --
.. NOTE: Cave-in depth of 7' after removal of
augers
Completion Depth: 30.0 ft Sample Types:
Date Bo~ng Started: 8/22/05 ~ Au er Cuttin ; Shelb Tube
Date Bonng Completed: 8/22/05 ~ g y
Logged By: DJL Split-Spoon Hand Auger
Drillin Contractor: PSI, Inc. Rock Core DCP
The stratification lines represent approximate boundaries. The transition may be gradual.
Latitude:
Longitude:
Remarks:
caJ- PSI
...~. 5362 West 78th Street
Indianapolis, IN 46268
I:!.". Telephone: (317) 876-7723
LOG OF BORING B-3
PSI Job No.:
Project:
Location:
016-55037
Center Pointe Crossing Retail Development
111th Street and Michigan Road
Zionsville, Indiana
Drilling Method:
Sampling Method:
Hammer Type:
Boring Location:
3 1/4" ID Hollow Stem Auger
Shelby Tube/Split Spoon
CME Automatic
Sheet 1 of 2
WATER LEVELS
:;t While Drilling 22'
~ Upon Completion None
'51- Delay N/A
870 25 Continued Next Pa e
Completion Depth: 30.0 ft Sample Types:
Date Boring Started: 8/23/05 ~ Au er Cuttin ; Shelb Tube
Date Boring Completed: 8/23/05 g g y
Logged By: DJL Split-Spoon Hand Auger
Drillin Contractor: PSI, Inc. Rock Core DCP
The stratification lines represent approximate boundaries. The transition may be gradual.
0- u;-
<II ~ en <II <II
0 J::
~ a; 0 0. 0
~ ...J ?=' z g
C 0 <II
0 ~ :c <II Q. ~
~ C. 0. is. E ~
!!! E
> <II III III 8
<II 0 C> (/) (/)
W <II
a:
0
890 5
885 10
880 15
875 20
MATERIAL DESCRIPTION
J:: STANDARD PENETRATION
<:: 0 TEST DATA
c:~
0 .- en N in blowslft @
~ 'c:
<O~ '#.
!E "'1Il X ~ PL
tJ) <11<11 ~ Moisture
tJ) 0.1- . LL Additional
.. ~a.. ~
U 1 25 Remarks
.0
en 0(.) :;
() -0
en co... STRENGTH, 1st
:::> 1-0
a..~ ... Qu * Qp
(/)
2.0 4.0
Surface Elev.: 895.0 ft
l2!"i~e~~~rt~d ~':..IQP~QI~ _ _ _ _ _ _ _
SILTY CLAY - and sand, trace gravel - brown CL 3-3-6 9
N=9
-------------------
SILTY CLAY - some sand, trace gravel - firm CL
4 - brown 1-2-3 22 0 *X
N=5
-------------------
8 1-1-1 15 0 X*
N=2
SILTY CLAY - and sand, trace gravel - soft to CL 15 AX
medium stiff - brown DD = 119.5 pet
Qu = 0.81 tsf
14
3-4-7 12
N=11
*
SILTY CLAY - and sand, trace gravel - firm to CL
hard - gray
>>
12
9-12-13 9
N=25
SILTY CLAY - and sand, trace gravel, with
occasional sand seams - soft to hard - gray
48-16-22 14 *
N=38
6
Latitude:
Longitude:
Remarks:
[flS- PSI
...~. 5362 West 78th Street
Indianapolis, IN 46268
~..". Telephone: (317) 876-7723
LOG OF BORING B-3
PSI Job No.:
Project:
Location:
016-55037
Center Pointe Crossing Retail Development
111th Street and Michigan Road
Zionsville, Indiana
Drilling Method:
Sampling Method:
Hammer Type:
Boring Location:
3 1/4" 10 Hollow Stem Auger
Shelby Tube/Split Spoon
CME Automatic
Sheet 2 of 2
WATER LEVELS
'Sl- While Drilling 22'
.y. Upon Completion None
'51- Delay N/A
.s:: STANDARD PENETRATION
Cil c: 0 TEST DATA
c c: ~
Gl Gl 0 .- Ol
Gl ~ Ol ci .s:: '" 'c: N in blowslft @
~ Qi 0 c- o l'l co"" ~
~ ....I ?:' z g IE "'Ul X WI PL
C 0 Gl MATERIAL DESCRIPTION Ul GlGl I!! Moisture Additional
:2 Gl Q. ~ Ul C-f- ~ . LL
.2 ~ is. OJ ~Q..
c- U 1 25 Remarks
1ii C. l!! E E ~ oU '0
> Gl <'II <'II 0 rn -0 :0
Gl 0 Cl en en 0 u CD...
iIi Gl rn f-O STRENGTH, tst
0:: ::> Q..~
en A Qu lIE Qp
25 2.0
CL
SILTY CLAY - and sand, trace gravel, with
occasional sand seams - soft to hard - gray
14 14-38-12 10 X
865 30 N=50
~DOFOO~~3~----------
1/ST 8.5' -10.5' REC= 100%
1/SS Driller reported 2 attempts, no recovery
** NOTE: Cave-in depth of 13' after removal
of augers
Completion Depth: 30.0 ft Sample Types:
Date Boring Started: 8/23/05 ~.;
Date Boring Completed: 8/23/05 Au~er Cutting Shelby Tube
Logged By: DJL Split-Spoon Hand Auger
Drillin Contractor: PSI, Inc. Rock Core DCP
The stratification lines represent approximate boundaries. The transition may be gradual.
Latitude:
Longitude:
Remarks:
(BiJ PSI
..~. 5362 West 78th Street LOG OF BORING B-4
Indianapolis, IN 46268
~.,. Telephone: {317} 876-7723 Sheet 1 of 2
PSI Job No.: 016-55037 Drilling Method: 3 1/4" ID Hollow Stem Auger WATER LEVELS
Project: Center Pointe Crossing Retail Development Sampling Method: Shelby Tube/Split Spoon 'Sl- While Drilling None
Location: 111 th Street and Michigan Road Hammer Type: CME Automatic .Y. Upon Completion
Zionsville, Indiana Boring Location: None
'5l Delay N/A
s::. STANDARD PENETRATION
Ul r: 0 TEST DATA
c c:~
Gl ~ Gl Gl 0 "7 ~ N in blows/fl @
Cl c:i s::. ~
~ Qj 0 a. 0 co., "#.
~ ....l ~ Z c: !E ...", X !;iiI PL
= GlGl I!! Moisture
c:: 0 Gl MATERIAL DESCRIPTION '" a.f- Additional
:2 Gl Q. ~ '" :::I . LL
0 or; Q. .. ~a.. 7ii
~ 15. a. E ~ C3 1 25 Remarks
l!! E '0
Gl Cll en 00 ::;;
Cll 0 iDe:
Gl 0 C) en en 0 <.>
jjj Gl en STRENGTH. tst
0::: :;) f-O
a..~
Surface Elev.: 899.0 ft en A Qu lIE Qp
0 2.0 4.0
L!'-.' ~i~e!!':P~rt~d ~':!~P~~I~ _ _ _ _ _ _ _
8 3-7-5 10
N=12
895 8 SIL TV CLAY - and sand, trace gravel - hard 3-3-6 11 0
CL
to firm - brown N=9
5
6 2-3-4 12 *
N=7
-------------------
890 12 1-4-8 11
>>
10 N=12
SIL TV CLAY - and sand, trace gravel - hard - CL
brown to gray @ 13'
885
1-3-5
N=8
12
1-3-5 11
N=8
15
880
1-11-12
N=23
SIL TV CLAY - and sand, trace gravel - hard -
gray
CL
20
875
4
25 - - - - - - --confTnueafVexT Pa e - - - -
Completion Depth: 30.0 ft Sample Types:
Date Boring Started: 8/23/05 ~ A C tt. ; Sh Ib T b
. ugerulng eyue
Date Bonng Completed: 8/23/05 .
Logged By: DJL Split-Spoon Hand Auger
Drillin Contractor: PSI Inc. Rock Core DCP
The stratification lines represent approximate boundaries. The transition may be gradual.
7
12
Latitude:
Longitude:
Remarks:
lIE
>>
*
tal- PSI
..~. 5362 West 78th Street
Indianapolis, IN 46268
~.,. Telephone: (317) 876-7723
LOG OF BORING B-4
PSI Job No.:
Project:
Location:
016-55037
Center Pointe Crossing Retail Development
111th Street and Michigan Road
Zionsville, Indiana
Drilling Method:
Sampling Method:
Hammer Type:
Boring Location:
3 1/4" ID Hollow Stem Auger
Shelby Tube/Split Spoon
CME Automatic
Sheet 2 of 2
WATER lEVELS
'Sl- While Drilling None
.Y Upon Completion None
:I- Delay N/A
.c STANDARD PENETRATION
Iii" c: 0 TEST DATA
c~
Q) Ol Ol 0 .- Ol N in blowslfl @
c Ol c:i .c '" 'c
~ Ol 0 C. 0 l'l co~ :R
~ ...J ~ Z g !E ~tJl 0 WI PL
c:- o MATERIAL DESCRIPTION III OlOl l'! X Moisture
Ol Ol III c.f- . LL Additional
.2 .r= :.c: c. c. ~ .. ~c... .a
iil a. c. E ~ B III 1 25 Remarks
l!! E oU '0
> Ol ltl ltl 0 en -0 ::ii
Ol 0 C> en en 0 t> Ol~
[j Ol en f-O STRENGTH, tst
c:: ::> c...~
en . Qu * Qp
25 2.0 4.0
SILTY CLAY - and sand, trace gravel - hard - CL
gray
870
10
2-6-7
N=13
9
x
>>
30
END OFBORING-30' - - - - - - - - - -
.. NOTE: Cave-in depth of 20' after removal
of augers
Completion Depth: 30.0 ft Sample Types:
Date Boring Started: 8/23/05 ~.;
D t B . C I t d 8/23/05 Auger Cutting Shelby Tube
a e onng omp e e : .
Logged By: DJL Split-Spoon Hand Auger
Drillin Contractor: PSI, Inc. Rock Core DCP
The stratification lines represent approximate boundaries. The transition may be gradual.
Latitude:
Longitude:
Remarks:
lBiJ PSI
...~. 5362 West 78th Street LOG OF BORING B-5
Indianapolis, IN 46268
~iiiiII. Telephone: (317) 876-7723
Sheet 1 of 2
PSI Job No.: 016-55037 Drilling Method: 3 1/4" 10 Hollow Stem Auger WATER LEVELS
Project: Center Pointe Crossing Retail Development Sampling Method: Shelby Tube/Split Spoon 5l- While Drilling None
Location: 111th Street and Michigan Road Hammer Type: CME Automatic ~ Upon Completion
Zionsville, Indiana Boring Location: None
7- Delay N/A
.s:: STANDARD PENETRATION
Ci) c 0 TEST DATA
c:~
Ql ~ Q) Q) 0 .- Cl N in blowslft @
Cl 0 .s:: ~ 'c:
~ Ql 0 Q. 0 co._ '$.
~ ...J ~ Z c: !E Ci>U) X ~ PL
c: 0 Q) :::- MATERIAL DESCRIPTION .. Q.~ ~ Moisture Additional
0 ~ :E Q) Q. ~ .. " . LL
Q. 1\1 ~a.. 1;;
~ Q. Q. E ~ U 1 25 Remarks
Q) ~ E III l/l 00 '0
III 0 iDr;: :;;:
Q) Cl Cl rn rn 0 ()
iIi Q) l/l STRENGTH, tst
0:: ::l 1-0
a..~
Surface Elev.: 899.0 ft rn .6. Qu )IE Qp
0 2.0 4.0
'2!"i~~~~rt~d ~'~2P~QI,=- _ _ _ _ _ _ _
10 SIL TV CLAY - and sand, trace gravel- firm- CL 1-2-3 22 0 X *
brown N=5
-------------------
895 SIL TV CLAY - some sand, trace gravel - firm CL
3 - brown 3-2-4 24 0
5 ------------------- N=6
16 1-3-4 13 0 *
N=7
890 2-7-9 9
>>
10 N=16
SIL TV CLAY - and sand, trace gravel- firm to CL
hard - brown to gray @ 8'
885 10 1-4-6 10
>>
15 N=10
880
16
4-14-14
N=28
8
2-4-6
N=10
SIL TV FINE TO COARSE SAND - medium
dense - wet - gray
SM
20
SIL TV CLAY - and sand, trace gravel - hard -
gray
875
25 Continued Next Pa e
Completion Depth: 30.0 ft Sample Types:
Date Boring Started: 8/23/05 ~ A C tt. ; Sh Ib T b
. ugerulng eyue
Date Bonng Completed: 8/23/05 .
Logged By: DJL Split-Spoon Hand Auger
Drillin Contractor: PSI Inc. Rock Core DCP
The stratification lines represent approximate boundaries. The transition may be gradual.
8
>>
Latitude:
Longitude:
Remarks:
~.PSI
...~. 5362 West 78th Street
Indianapolis, IN 46268
~.,. Telephone: (317) 876-7723
7
LOG OF BORING B-5
PSI Job No.:
Project:
Location:
016-55037
Center Pointe Crossing Retail Development
111th Street and Michigan Road
Zionsville, Indiana
Drilling Method:
Sampling Method:
Hammer Type:
Boring Location:
31/4" 10 Hollow Stem Auger
Shelby Tube/Split Spoon
CME Automatic
Sheet 2 of 2
WATER LEVELS
'Sl While Drilling None
~ Upon Completion None
7. Delay N/A
.c STANDARD PENETRATION
Ul c: 0 TEST DATA
~ c:~
Ql ~ Ql Ql 0 "J;.~ N in blowslfl @
~ a; Cl C. 0 .c ~
0 ~ Z 0 Qicn ';F.
~ ...J c: !E X ~ Pl
c:: 0 Q) c MATERIAL DESCRIPTION '" c.~ 2f Moisture Additional
Q) '" . II
.2 .r; :E C. ~ .. il
~ a. c. 0. E Q) (3 ~o.. 1 25 Remarks
l!! E '0
Q) m ~ l/) oU :0
m iDo
J! 0 Cl (/) (/) 0 u
w Q) l/) 1-5 STRENGTH, tsf
a:: ;:) o..~
(/) ... Qu lIE Qp
25 2.0 4.0
CL
SIL TV CLAY - and sand, trace gravel- hard-
gray
870 12 3-7-9 10
>>
30 N=16
END OFBORING-30' - - - - - - - - --
** NOTE: Cave-in depth of 23' after removal
of augers
Completion Depth: 30.0 ft Sample Types:
Date Boring Started: 8/23/05 ~ Auger Cutting ; Shelby Tube
Date Boring Completed: 8/23/05
Logged By: DJL Split-Spoon Hand Auger
Drillin Contractor: PSI Inc. Rock Core DCP
The stratification lines represent approximate boundaries. The transition may be gradual.
Latitude:
Longitude:
Remarks:
lBil PSI
...~. 5362 West 78th Street LOG OF BORING B-6
Indianapolis, IN 46268
I:!.". Telephone: (317) 876-7723
Sheet 1 of 2
PSI Job No.: 016-55037 Drilling Method: 3 1/4" ID Hollow Stem Auger WATER LEVELS
Project: Center Pointe Crossing Retail Development Sampling Method: Shelby Tube/Split Spoon 'Sl- While Drilling' None
Location: 111th Street and Michigan Road Hammer Type: CME Automatic .Y. Upon Completion
Zionsville, Indiana Boring Location: None
:! Delay N/A
.s::: STANDARD PENETRATION
Cil c: 0 TEST DATA
p c:~
Q) 0 "7 g>
Q) p Cl Q) 0 .s::: "" N in blows/ft @
~ Q) 0 Q. 0 l'l <0._ ;F.
~ ...J ~ Z c: !E 4;u; X lOiI PL
c: 0 Q) '=' MATERIAL DESCRIPTION Ul Q.~ e Moisture
Q) Ul . LL Additional
0 .c :c c. ~ III ~
:; 15. Q. C. E ~ <3 ~c.. 1 25 Remarks
> Q) ~ E ClI en oU '0
ClI 0 -0 ::;;
Q) 0 C> (J) (J) 0 <.> ell....
iIi Q) en STRENGTH, tsf
c::: ::::l 1-0
c..~
Surface Elev.: 900.0 ft (J) .. Qu * Qp
0 2.0 4.0
u:.\ ~i~e~~~rt~d ~':"!QP~QI~ _ _ _ _ _ _ _
5 1-3-3 21 X *'
N=6
SIL TV CLAY - and sand, trace gravel - firm to CL
hard - brown
4 1-2-3 21 X *'
895 5 N=5
-------------------
14 2-3-3 12 0 *'
N=6
1-2-3 13 0 *'
890 10 N=5
SIL TV CLAY - and sand, trace gravel - firm to CL
soft - brown to gray @ 13'
1-2-4 12 0 *'
885 15 N=6
880 20
10
1-4-13 9
N=17
8
1-2-4
N=6
12
>>
SIL TV CLAY - and sand, trace gravel, with
occasional sand seams - firm to soft - gray
CL
875 25 Continued Next Pa e
Completion Depth: 30.0 ft Sample Types:
Date Bor~ng Started: 8/23/05 ~ Au er Cuttin ; Shelb Tube
Date BOring Completed: 8/23/05 ~ g y
Logged By: DJL Split-Spoon Hand Auger
Drillin Contractor: PSI, Inc. Rock Core DCP
The stratification lines represent approximate boundaries. The transition may be gradual.
Latitude:
Longitude:
Remarks:
fBi}- PSI
...~. 5362 West 78th Street
Indianapolis, IN 46268
I:!.". Telephone: (317) 876-7723
LOG OF BORING B-6
PSI Job No.:
Project:
Location:
016-55037
Center Pointe Crossing Retail Development
111th Street and Michigan Road
Zionsville, Indiana
Drilling Method:
Sampling Method:
Hammer Type:
Boring Location:
3 1/4" II) Hollow Stem Auger
Shelby Tube/Split Spoon
CME Automatic
Sheet 2 of 2
WATER LEVELS
'Sl. Vllhile Drilling None
.J. Upon Completion None
7- Delay N/A
.r: STANDARD PENETRATION
Ul c: 0 TEST DATA
~ c: ~
Gi (D (D 0 ".. ~ N in blowslfl @
'i Cl ci "5 ""
~ 0 a. ~ co~ ~
~ ...J ~ Z e ...", 0 WI PL
c: 0 III MATERIAL DESCRIPTION III (D(D I!! X Moisture
III III 0.1- . LL Additional
0 ~ :c Q. ~ III :::J
:;::l 15. a. C. E g1 <3 ~c... "lil 1 25 Remarks
cu ~ E oU .0
> Q) cu cu 0 en iii'2 ::;:
III Cl (.!) (j) (j) 0 0
jjj III en 1-0 STRENGTH, tsf
a:: :::J c...~
(j) .6- Qu lie Qp
25 4.0
SIL TV CLAY - and sand, trace gravel, with
occasional sand seams - firm to soft - gray
-------------------
SIL TV CLAY - and sand, trace gravel, with CL
8 occasional sand seams - firm - gray 1-13-16 13
870 30 N=29
~DOFOO~NG~----------
.. NOTE: Cave-in depth of 19' after removal
of augers
Completion Depth: 30.0 ft Sample Types:
Date Boring Started: 8/23/05 ~ Au er Cullin ; Shelb Tube
Date Boring Completed: 8/23/05 ~ g y
Logged By: DJL Split-Spoon Hand Auger
Drillin Contractor: PSI, Inc. Rock Core DCP
The stratification lines represent approximate boundaries. The transition may be gradual.
Latitude:
Longitude:
Remarks:
lBil- PSI
..8. 53~2 Wes~ 78th Street
Indianapolis, IN 46268
K". Telephone: (317) 876-7723
LOG OF BORING B-7
Drilling Method:
Sampling Method:
Hammer Type:
Boring Location:
Sheet 1 of 2
WATER LEVELS
5l- While Drilling 19'
~ Upon Completion 7'
'5l Delay N/A
PSI Job No.:
Project:
Location:
016-55037
Center Pointe Crossing Retail Development
111th Street and Michigan Road
Zionsville, Indiana
3 1/4" 10 Hollow Stem Auger
Shelby Tube/Split Spoon
CME Automatic
8 ------------------- *'
1-3-8 17 0 X
885 15 N=11
SILTY FINE TO COARSE SAND - loose - SM
moist - gray
-------------------
/S 18 20-6-4 21
880 20 N=10
SILTY CLAY - and sand, trace gravel, with
occasional sand seams - firm to hard - gray
875 25 Continued Next Pa e
Completion Depth: 30.0 ft Sample Types:
Date Boring Started: 8/23/05 ~ Au er Cuttin ; Shelb Tube
Date Boring Completed: 8/23/05 ~ g y
Logged By: DJL Split-Spoon Hand Auger
Drillin Contractor: PSI, Inc. Rock Core DCP
The stratification lines represent approximate boundaries. The transition may be gradual.
c (i)
Ol
Ol 'i Cl Ol 0 .s::
~ 0 c. 0
~ ...J ~ Z .s
c: 0 Ol
0 sf :c Ol Q. ~
:; ii c. Q. E Ol
~ E >
> Ol III l\l 8
Ol Cl C) en en
W Ol
0::
0
6
895 5
890 10
/SS 10
MATERIAL DESCRIPTION
.s:: STANDARD PENETRATION
c 0 TEST DATA
c: ~
0 '7 g> N in blowsffl @
""
~ co;:; 1f.
!E ...", X WI PL
OlOl ~ Moisture
'" c.1- Additional
'" :> . LL
'" ~c... 'lii
B 1 25 Remarks
rJ) oU '0
t) ffi~ :;
rJ) STRENGTH, tsf
::> 1-0
c...~ .& Qu *- Qp
en
2.0 4.0
CL 1-3-5 20 0
N=8
5-5-5 18 0 X >>
N=10
Surface Elev.: 900.0 ft
l2."i!!.e!!~~rt~d ~':.IQP~QI~ _ _ _ _ _ _ _
SILTY CLAY - trace sand, trace gravel - dark
brown
6
8
1-1-4 19
N=5
X
SILTY CLAY - and sand, trace gravel, with CL
occasional sand seams - hard to firm - brown
2-2-7 13
N=9
o
*
CL 1-4-16
N=20
>>
9
Latitude:
Longitude:
Remarks:
lBil- PSI
...~. 5362 West 78th Street
Indianapolis. IN 46268
~'iiII. Telephone: (317) 876-7723
. - 1
PSI Job No.: 016-55037
Project: Center Pointe Crossing Retail Development
Location: 111th Street and Michigan Road
Zionsville. Indiana
LOG OF BORING B-7
Drilling Method:
Sampling Method:
Hammer Type:
Boring Location:
3 1/4" ID Hollow Stem Auger
Shelby Tube/Split Spoon
CME Automatic
Sheet 2 of 2
WATER LEVELS
'Sl- While Drilling 19'
~ Upon Completion 7'
'5l- Delay N/A
.t:. STANDARD PENETRATION
Ul c: 0 TEST DATA
c~
Q) ~ Ql Ql 0 "7 g> N in blowsJft @
~ Q) 0) c. 0 .t: B <0._
0 0 ~
~ ...J ~ Z c !E (De;; 0 WI PL
C 0 Ql :.:::. MATERIAL DESCRIPTION '" c.~ I!! X Moisture Additional
.r= :c Ql Q. ~ '" .a . LL
.2 Q. as ~Q..
c. 0 '" 1 25 Remarks
1ii ii ~ E E ~ oU '0
> Ql lU lU III air: ::!:
Ql Cl C> (/) (/) 0 ()
i:iJ Ql III 1-0 STRENGTH,lst
0:: => Q..~
(/) ... Qu * Qp
25 4.0
SIL TV CLAY - and sand, trace gravel, with
occasional sand seams - firm to hard - gray
870 30
3-12-21 9
N=33
>>
x
END OFBORING-30' - - - - - - - - --
.. NOTE: Cave-in depth of 18' after removal
of augers
Completion Depth: 30.0 ft Sample Types:
Date Boring Started: 8/23/05 ~.;
D t B. C I d 8/23/05 Auger Cutting Shelby Tube
a e orlng omp ete : .
Logged By: DJL Split-Spoon Hand Auger
Drillin Contractor: PSI, Inc. Rock Core DCP
The stratification lines represent approximate boundaries. The transition may be gradual.
Latitude:
Longitude:
Remarks:
CJB- PSI
....~. 5362 West 78th Street
Indianapolis, IN 46268
~.,. Telephone: (317) 876-7723
LOG OF BORING B-8
PSI Job No..:
Project:
Location:
016-55037
Center Pointe Crossing Retail Development
1111h Street and Michigan Road
Zionsville, Indiana
Drilling Method:
Sampling Method:
Hammer Type:
Boring Location:
3 1/4" 10 Hollow Stem Auger
Shelby Tube/Split Spoon
CME Automatic
Sheet 1 of 2
WATER LEVELS
'Sl While Drilling 23'
.!. Upon Completion 3'
:l Delay N/A
6-6-5 11
5 N=11
895
4-4-4 12 *
N=8
18 SIL TV CLAY - and sand, trace gravel - hard CL 2-4-5 13 *
10 to firm - brown to gray @ 12' N=9
890
------~ooUnUea~ff~e----
Completion Depth: 30.0 ft Sample Types:
Date Boring Started: 8/24/05 ~ Auger Cutting ; Shelby Tube
Date Boring Completed: 8/24/05
Logged By: DJL Split-Spoon Hand Auger
Drillin Contractor: PSI, Inc. Rock Core DCP
The stratification lines represent approximate boundaries. The transition may be gradual.
0 .,
Ql ~ C) Ql Ql
~ 1ii c. 0 .c
0 0
~ ...J ~ Z e:
C 0 Ql '='
0 ~ :c Ql Q. ~
~ Q. c. Q. E ~
e! E
Ql RI RI
Ql 0 c.!> (J) (J) 0
iiJ Ql
0::
0 L...!:.\
900
15
885
20
880
25
/SS 10
MATERIAL DESCRIPTION
.c STANDARD PENETRATION
c: 0 TEST DATA
e:~
0 .- C) N in blowslfl @
B 'e:
co"" "#.
IE 'Gl U) e- X Moisture WI PL
III c.~ Additional
III i . LL
'" ~Q..
U 1 25 Remarks
en oU .0
u -0 :;;
en CD.... STRENGTH, tsf
::J 1-0
Q..~ . Qu lIE Qp
(J)
2.0 4.0
1-6-8 20 0 X
N=14
Surface Elev.: 901.0 ft
Driller reported 10" TOPSOIL
12
3-3-4 11
N=7
18
10-13-5
N=18
SIL TV FINE TO COARSE SAND - trace
gravel - medium dense to dense - moist - gray
SM
11-13-17
N=30
Latitude:
Longitude:
Remarks:
tal- PSI
...8. 5362 West 78th Street
Indianapolis, IN 46268
~iiiilI. Telephone: (317) 876-7723
LOG OF BORING B-8
PSI Job No.:
Project:
Location:
016-55037
Center Pointe Crossing Retail Development
111th Street and Michigan Road
Zionsville, Indiana
Drilling Method:
Sampling Method:
Hammer Type:
Boring Location:
3 1/4" ID Hollow Stem Auger
Shelby Tube/Split Spoon
CME Automatic
Sheet 2 of 2
WATER LEVELS
5l- While Drilling 23'
.y Upon Completion 3'
'5l Delay N/A
.r:
U> c: 0
c~
Qj Gl Gl 0 "7 ~
0- Cl 0 .r: ~
~ Gl 0 a. 0 <0; '#.
~ ...J ~ Z g !E "-",
C 0 MATERIAL DESCRIPTION III GlGl e
Gl Gl III 0.1-
:E Q. ~ "
0 ~ Q. .. ~o.. 'Iii 1
:; 15. a. E ~ 5
'" E 00 .0
> Gl c9 '" '" 8 en iDe: :;
Gl 0 C/) C/) ()
jjj Gl en
0::: :::l 1-0
o..~
C/)
25
875
SILTY CLAY - and sand, trace gravel - hard - CL
gray
9-9-12 13
30 N=21
~DOFOO~NG~----------
8/SS Driller reported 2 attempts, no recovery -
Auger sample taken.
.. NOTE: Cave-in depth of 15' after removal
of augers
STANDARD PENETRATION
TEST DATA
N in blowsffl @
lOiI PL
. LL
25
Additional
Remarks
X Moisture
STRENGTH, tsf
. Qu lIE Qp
4.0
Completion Depth: 30.0 ft Sample Types:
Date Boring Started: 8/24/05 ~ Auger Cutting ; Shelby Tube
Date Boring Completed: 8/24/05 .
Logged By: DJL Split-Spoon Hand Auger
Drillin Contractor: PSI, Inc. Rock Core DCP
The stratification lines represent approximate boundaries. The transition may be gradual.
Latitude:
Longitude:
Remarks:
cs. PSI
...~. 5362 West 78th Street
Indianapolis, IN 46268
~.,. Telephone: (317) 876-7723
PSI Job No.:
Project:
Location:
016-55037
Center Pointe Crossing Retail Development
111th Street and Michigan Road
Zionsville, Indiana
Drilling Method:
Sampling Method:
Hammer Type:
Boring Location:
Ul
Qj 0 Cl Ql Ql
0 .s::
~ Ql 0 C. 0
~ ...J ~ Z c:
c:: 0 Ql c
.2 ~ :c Ql a. ~
~ 15. c. a. E ~
f! E
Ql co co 0
Ql Cl Cl en en 0
iiJ Ql
0:::
0 u'".,
8
895
5
890
10
885
15
880
/S
/SS 5
20
875
25
MATERIAL DESCRIPTION
Surface Elev.: 899.0 ft
~i~!!~~rt!:.d ~':..!~P~~I,=- _ _ _ _ _ _ _
SILTY FAT CLAY - some sand, trace gravel-
soft - brown
10
SILTY CLAY - and sand, trace gravel - soft to
stiff - brown to gray @ 13'
6
SILTY FINE TO COARSE SAND - trace
gravel - medium dense - wet - gray
SILTY CLAY - and sand, trace gravel - firm to
hard - gray
12
LOG OF BORING B-9
3 1/4" 10 Hollow Stem Auger
Shelby Tube/Split Spoon
CME Automatic
Sheet 1 of 2
WATER LEVELS
'Sl While Drilling 121/2'
~ Upon Completion 4'
'5l. Delay N/A
.s:: STANDARD PENETRATION
c: 0 TEST DATA
c: ~
0 .- Cl N in blowslfl @
B 'c:
co ._ ??
IE Ci;Ui e- X Moisture WiI PL
., c.~ Additional
., . LL
III ~Q.. il
<3 1 25 Remarks
(/) 00 .0
<.> me;: ::;;
(/) STRENGTH, tsf
:> ~o
Q..~ ... Qu lIE Qp
en
2.0 4.0
CH 2-2-4 21 0
N=6
2-1-1 19 0
N=2
13
CL
3-4-4 14
N=8
3-12-16
N=28
SM
3-4-3 12
N=7
CL 1-15-23
N=38
Latitude:
Longitude:
Remarks:
9
L= 54
L = 15
:II(
...
DO = 125.4 pet
Qu = 1.50 tsf
Continued Next Pa e
Completion Depth: 30.0 ft Sample Types:
Date Boring Started: 8/24/05 ~ Auger Cutting ; Shelby Tube
Date Boring Completed: 8/24/05
Logged By: DJL Split-Spoon Hand Auger
Drillin Contractor: PSI, Inc. Rock Core DCP
The stratification lines represent approximate boundaries. The transition may be gradual.
*'
>>
cmJ- PSI
...~. 5362 West 78th Street
Indianapolis, IN 46268
~.,. Telephone: (317) 876-7723
LOG OF BORING B-9
PSI Job No.:
Project:
Location:
016-55037
Center Pointe Crossing Retail Development
111 th Street and Michigan Road
Zionsville, Indiana
Drilling Method:
Sampling Method:
Hammer Type:
Boring Location:
3 1/4" 10 Hollow Stem Auger
Shelby Tube/Split Spoon
CME Automatic
Sheet 2 of 2
WATER LEVELS
'Sl- While Drilling 121/2'
Y Upon Completion 4'
'5l- Delay N/A
.c STANDARD PENETRATION
~ u;- c: 0 TEST DATA
c~
Qj Gl Gl 0 .7 g' N in blows/fl @
:;::- Cl 0 .c ""
~ Gl 0 0. 0 l'l co;::; '#.
~ ....I >- Z ~ IE ~'" WI Pl
I- GlGl ~ X Moisture
C 0 Gl MATERIAL DESCRIPTION '" 0.1- Additional
.2 .c- :2 Gl Q. ~ '" ::J . II
C. III ~c..
0. 0 1ii 1 25 Remarks
iii a. E E Gl '0
> Gl l!! 11I E; I/) 0(,) :;;
Gl 0 (!) 11I en () 1'ii'2
en 0
[jJ Gl I/) 1-0 STRENGTH, tsf
0::: ~ c..~
en . Qu lIE Qp
25 2.0 4.0
SILTY CLAY - and sand, trace gravel - firm to
hard - gray
870
30
3-13-20 8
N=33
x
o
>>
END OFBORING-30' - - - - - - - - --
1/ST 6.0' - 8.0' REC = 54%
.. NOTE: Cave-in depth of 21' after removal
of augers
Completion Depth: 30.0 ft Sample Types:
Date Boring Started: 8/24/05 ~.;
O t B. C I t d 8/24/05 Auger Cutting Shelby Tube
a e onng omp e e : .
Logged By: DJL Split-Spoon Hand Auger
Drillin Contractor: PSI Inc. Rock Core DCP
The stratification lines represent approximate boundaries. The transition may be gradual.
Latitude:
Longitude:
Remarks:
lBiJ- PSI
..8. 5362 West 78th Street
Indianapolis, IN 46268
~.,. Telephone: (317) 876-7723
LOG OF BORING B-10
PSI Job No.:
Project:
Location:
016-55037
Center POinte Crossing Retail Development
111th Street and Michigan Road
Zionsville, Indiana
Drilling Method:
Sampling Method:
Hammer Type:
Boring Location:
3 1/4" ID Hollow Stem Auger
Shelby Tube/Split Spoon
CME Automatic
Sheet 1 of 2
WATER LEVELS
'Sl- While Drilling None
~ Upon Completion None
:[ Delay N/A
~ Ul
Qi 'i Cl Q) Q)
0 ~
~ 0 0. 0
~ ....I ~ Z g
c: 0 Q)
0 ~ ~ Q) is. ~
:; C. 0. is. E ~
III E
> Q) c9 III III 0
Q) 0 (/) (/) 0
iIi Q)
0::
0 L..,Z','
6
MATERIAL DESCRIPTION
~ STANDARD PENETRATION
c: 0 TEST DATA
c~
0 "T g> N in blows/It @
~ co:.;::; '#.
!E "'Ul X ljjI PL
.. Q)Q) e! Moisture Additional
II) 0.1- . LL
III ::J
<3 ~a.. 1ii 1 25 Remarks
U) oU '0
u 1ii~ :;;
U) STRENGTH,lsf
::::l 1-0
a..~ ... Qu lIE Qp
(/)
2.0 4.0
1-4-4 18 X >>
N=8
Surface Elev.: 899.0 ft
Driller reported 10" TOPSOIL
15
10
SILTY CLAY - and sand, trace gravel, with
occasional sand seams - hard to firm - gray
CL
3-3-6
N=9
18
o X
*
895 10 SILTY CLAY - and sand, trace gravel - hard 1-1-1 21 0* X
to medium stiff - brown CL N=2
5
13 . DD = 126.4 pct
Qu = 0.78 tst
-------------------
890 14 3-3-5 10 0
>>
10 N=8
885
880
20
1-2-4 12
N=6
*
SILTY CLAY - and sand, trace gravel- hard -
gray
>>
875
10
1-5-9
N=14
10
25 Continued Next Pa e
Completion Depth: 30.0 ft Sample Types:
Date Boring Started: 8/24/05 ~ Auger Cutting ; Shelby Tube
Date Boring Completed: 8/24/05
Logged By: DJL Split-Spoon Hand Auger
Drillin Contractor: PSI, Inc. Rock Core DCP
The stratification lines represent approximate boundaries. The transition may be gradual.
Latitude:
Longitude:
Remarks:
lBiJ- PSI
...~. 5362 West 78th Street
Indianapolis, IN 46268
~.,. Telephone: (317) 876-7723
LOG OF BORING B-10
PSI Job No.:
Project:
Location:
016-55037
Center Pointe Crossing Retail Development
111th Street and Michigan Road
Zionsville, Indiana
Drilling Method:
Sampling Method:
Hammer Type:
Boring Location:
3 1/4" 10 Hollow Stem Auger
Shelby Tube/Split Spoon
CME Automatic
Sheet 2 of 2
WATER LEVELS
5l While Drilling None
.Y Upon Completion None
:J.. Delay N/A
.s:: STANDARD PENETRATION
Ul c: 0 TEST DATA
c l::~
Gl 0 .- Ol
Gl Ql Ol Gl 0 .s:: "" 'l:: N in blowslft @
~ 0 0. 0 !'l <0:;:; '#.
~ -l ~ z :S. IE '-", X WI PL
GlGl e Moisture
c: 0 Gl MATERIAL DESCRIPTION '" 0.1- Additional
:c Gl a. ~ '" ~ . LL
.Q sf a. IV ~ll..
iii c.. 0. E ~ (3 1 25 Remarks
~ E 00 '0
> Gl III III 0 en me: :;
Gl Cl Cl (/) (/) 0 u
iIi Gl en 1-0 STRENGTH, tsf
c::: ::> ll..~
(/) . Qu lIE Qp
25 2.0 4.0
SILTY CLAY - and sand, trace gravel - hard -
gray
870
12
3-3-6 11
N=9
o
30
END OFBORING-30' - - - - - - - - --
1/ST 6.0' - 8.0' REC= 100%
.. NOTE: Cave-in depth of 3' after removal of
augers
Completion Depth: 30.0 ft Sample Types:
Date Boring Started: 8/24/05 ~ A C tt' ; S
. uger u Ing helby Tube
Date Bonng Completed: 8/24/05 .
Logged By: DJL Split-Spoon Hand Auger
Drillin Contractor: PSI, Inc. Rock Core DCP
The stratification lines represent approximate boundaries. The transition may be gradual.
Latitude:
Longitude:
Remarks:
fijg_ PSI
..~. 5362 West 78th Street
Indianapolis, IN 46268
~iiilI. Telephone: (317) 876-7723
LOG OF BORING B-11
PSI Job No.:
Project:
Location:
Drilling Method:
Sampling Method:
Hammer Type:
Boring Location:
3 1/4" ID Hollow Stem Auger
Shelby Tube/Split Spoon.
CME Automatic
Sheet 1 of 2
WATER LEVELS
Yl- While Drilling None
~ Upon Completion None
7- Delay N/A
016-55037
Center Pointe Crossing Retail Development
111th Street and Michigan Road
Zionsville, Indiana
0 Ci)
Q) Q)
Q) 15 Cl 0 .r:
~ 0 0. 0
~ ..J ~ z 5
c:: 0 Q)
0 .c :2 Q) 15. ~
ii a. 0. 15. E ~
III E
> Q) t5 III III 0
Q) 0 (/) (/) 0
jjj Q)
e:::
0 L...,!:.'
6
.c:. STANDARD PENETRATION
c 0 TEST DATA
c:~
0 "7 g' N in blows/ft @
""
B co,." ~
!E ....1Il X !;iiI PL
'" Q)Q) e Moisture Additional
'" 0.1- ::> . LL
III ~a..
U 1ii 1 25 Remarks
en 00 .0
() air: ::;:
en STRENGTH, tsf
::> 1-0
a..~ .. Qu *' Qp
(/)
2.0 4.0
2-7-7 14 >>
N=14
MATERIAL DESCRIPTION
Surface Elev.: 899.0 ft
Driller reported 10" TOPSOIL
895
12
4-9-15
N=24
5
12 SIL TV CLAY - and sand, trace gravel- hard CL 3-4-5 13
to firm - brown N=9
14 2-2-5 15
N=7
-------------------
16 2-4-6 11
N=10
890
10
SIL TV CLAY - and sand, trace gravel - hard
to firm - brown to gray @ 13'
CL
885
1-3-4
N=7
12
15
880
10
2-3-4 11
N=7
20
SIL TV CLAY - and sand, trace gravel - hard -
gray
875
25 Continued Next Pa e
Completion Depth: 30.0 ft Sample Types:
Date Bor~ng Started: 8/24/05 ~ Auger Cutting ; Shelby Tube
Date Bonng Completed: 8/24/05 S rt S H d A
Logged By: DJL p I - poon an uger
Drillin Contractor: PSI, Inc. Rock Core DCP
The stratification lines represent approximate boundaries. The transition may be gradual.
>>
*'
>>
11
o
*'
10
>>
Latitude:
Longitude:
Remarks:
fBiJ- PSI
...~. 5362 West 78th Street
Indianapolis, IN 46268
~.,. Telephone: (317) 876-7723
LOG OF BORING B-11
PSI Job No.:
Project:
Location:
016-55037
Center Pointe Crossing Retail Development
111th Street and Michigan Road
Zionsville, Indiana
Drilling Method:
Sampling Method:
Hammer Type:
Boring Location:
31/4" ID Hollow Stem Auger
Shelby Tube/Split Spoon
CME Automatic
Sheet 2 of 2
WATER LEVELS
'Sl- While Drilling None
Y Upon Completion None
7 Delay N/A
.s::: STANDARD PENETRATION
Cil c: 0 TEST DATA
C c~
Q) Q) 0 ~.~
Q) ~ Cl ci .s::: ~ N in blows/fl @
~ 1ii c.
0 ~ Z 0 Qi0 ~
~ ...J 5- IE X WI Pl
C- o Q) MATERIAL DESCRIPTION III c.~ 1If Moisture Additional
.c :2 Q) Q. ~ III ."3 . II
0 is. os ~c..
~ a c. E ~ U .!!l 1 25 Remarks
co E oU 0
Q) t5 a:J a:J 0 lJ) ii5~ ::;;
Q) 0 (/J (/J 0 u
jjj Q) lJ) 1-0 STRENGTH, tsf
a:: ::l c..~
(/J .. Qu *' Qp
25 2.0 4.0
SIL TV CLAY - and sand, trace gravel- hard-
gray
870
12
5-11-13 9
N=24
x
>>
30
~DOFOO~NG~----------
** NOTE: Cave-in depth of 20' after removal
of augers
Completion Depth: 30.0 ft Sample Types:
Date Boring Started: 8/24/05 ~.;
D t B. C I t d 8/24/05 Auger Cutting Shelby Tube
ae onng ompee: .
Logged By: DJL Split-Spoon Hand Auger
Drillin Contractor: PSI, Inc. Rock Core DCP
The stratification lines represent approximate boundaries. The transition may be gradual.
Latitude:
Longitude:
Remarks:
EM- PSI
...~. 5362 West 78th Street
Indianapolis, IN 46268
~.,. Telephone: (317) 876-7723
LOG OF BORING B-12
PSI Job No.:
Project:
Location:
016-55037
Center Pointe Crossing Retail Development
111th Street and Michigan Road
Zionsville, Indiana
Drilling Method:
Sampling Method:
Hammer Type:
Boring Location:
3 1/4" ID Hollow Stem Auger
Shelby Tube/Split Spoon
CME Automatic
Sheet 1 of 2
WATER LEVELS
'Sl- While Drilling None
~ Upon Completion None
::r.. Delay N/A
Cil
Q) :;::- Cl Ol Ol
0 .s::
~ Ol 0 Co 0
~ ....I ~ Z c:
c: 0 Ol c
.2 ~ :2 Ol Q. ~
Q.
1ii a. Co E E Ol
e! >
> Ol III III 0
Ol 0 C!) en en 0
W Ol
c::
0 L.!: .,
895
MATERIAL DESCRIPTION
.s:: STANDARD PENETRATION
<: 0 TEST DATA
c:~
0 "7 ~ N in blows/ft @
B <0., :$:
....'" 0 I;iiI PL
IE OlOl 2! X Moisture
'" Additional
'" Co I- ~ . LL
'" ~Q..
<3 1 25 Remarks
rJ) oU .0
() iiil2 ::!i!
rJ) STRENGTH,lsf
::l 1-0
Q..~ . Qu *' Qp
en
2.0 4.0
2-2-3 18 X
N=5
5
Surface Elev.: 897.0 ft
~i~~~~Et~d ~'~~P~~I~ _ _ _ _ _ _ _
890
16
1-5-6 11
N=11
8 SIL TV CLAY - and sand, trace gravel - hard -
brown
CL 1-2-3 13
N=5
10
1-2-3 11
N=5
885
16 1-3-4 11
15 N=7
SIL TV CLAY - and sand, trace gravel - firm to
880 hard - gray
14 CL 1-6-12 8 >>
20 N=18
875
12
1-10-13
N=23
9 X
o
>>
25 Continued Next Pa e
Completion Depth: 30.0 ft Sample Types:
Date Boring Started: 8/25/05 ~ Auger Cutting ; Shelby Tube
Date Boring Completed: 8/25/05 S I. S H d A
Logged By: DJL p It- poon an uger
Drillin Contractor: PSI, Inc. Rock Core DCP
The stratification lines represent approximate boundaries. The transition may be gradual.
Latitude:
Longitude:
Remarks:
fBjJ_ PSI
..~. 5362 West 78th Street
Indianapolis, IN 46268
~.,. Telephone: (317) 876-7723
LOG OF BORING B-12
PSI Job No.:
Project:
Location:
016-55037
Center Pointe Crossing Retail Development
111th Street and Michigan Road
Zionsville, Indiana
Drilling Method:
Sampling Method:
Hammer Type:
Boring Location:
3 1/4" 10 Hollow Stem Auger
Shelby Tube/Split Spoon
CME Automatic
Sheet 2 of 2
WATER LEVELS
'Sl- While Drilling None
Y. Upon Completion None
'5l- Delay N/A
.c STANDARD PENETRATION
Ul c: 0 TEST DATA
c:~
QJ cu cu 0 .- 0> N in blowslft @
:;::- 0> 0 .c "" cO .!:
g cu 0 c. 0 B :I<
g -' I- Z g !E (j)0 0 ~ PL
C 0 cu MATERIAL DESCRIPTION III c.~ e X Moisture Additional
cu III . LL
.S! ~ :c 'is. ~ III ::>
1ii C. c. 'is. E cu (3 ~c.. 10 1 25 Remarks
~ E > oU '0
> cu ell ell 0 1Il air: ::;;
cu a (!) en en 0 c..>
iIi cu 1Il STRENGTH, tst
0:: ::l 1-0
c..~
en . Qu * Qp
25 2.0 4.0
870
SILTY CLAY - and sand, trace gravel - firm to
hard - gray
14 1-11-12 9 X 0
30 N=23
END OFBORING30'- - - - - - - - --
** NOTE: Cave-in depth of 18' after removal
of augers
Completion Depth: 30.0 ft Sample Types:
Date Boring Started: 8/25/05 ~.;
Date Boring Completed: 8/25/05 Au~er Cutting Shelby Tube
Logged By: DJL Split-Spoon Hand Auger
Drillin Contractor: PSI, Inc. Rock Core DCP
The stratification lines represent approximate boundaries, The transition may be gradual.
Latitude:
Longitude:
Remarks:
(BiJ PSI
..~. 5362 West 78th Street LOG OF BORING B-13
Indianapolis, IN 46268
~.,. Telephone: {317} 876-7723 Sheet 1 of 2
PSI Job No.: 016-55037 Drilling Method: 3 1/4" 10 Hollow Stem Auger WATER LEVELS
Project: Center Pointe Crossing Retail Development Sampling Method: Shelby Tube/Split Spoon '5l While Drilling None
Location: 111 th Street and Michigan Road Hammer Type: CME Automatic Y. Upon Completion
Zionsville. Indiana Boring Location: None
'5l- Delay N/A
J: STANDARD PENETRATION
Ul I: C.) TEST DATA
c c:~
Gl Gl 0 .- Cl
Gl i" Cl 0 J: "" 'c: N in blowslft @
~ 0 0. C.) l'l co+:; ;f.
~ ....I ~ Z c: IE ~'" X lOiiI PL
r:: C.) Gl :::- MATERIAL DESCRIPTION <II GlGl e Moisture Additional
Gl <II 0.1- . LL
.2 ~ :2 Q. ~ 1\I fjj
iil a 0. Q. E Gl C3 ~Q.. 1 25 Remarks
~ E '0
> Gl <II i3 rJ) oU ::;;
Gl 0 ~ <II en () iDe:
en C.)
W Gl rJ) STRENGTH, tsf
0:: ::> 1-0
Q..~
Surface Elev.: 897.0 ft en . Qu lIE Qp
0 2.0 4.0
L...!:.' ~i~e~~~~d ~':..I2P~Q.I~ _ _ _ _ _ _ _
895 10 2-10-11 10 >>
(- , N=21
SIL TV CLAY - and sand, trace gravel - hard CL 3-5-5 11
to firm - brown N=10
5
890 14 3-3-3 13
N=6
-------------------
2-4-10 11 >>
10 N=14
885
SIL TV CLAY - and sand, trace gravel - hard CL
10 to firm - brown to gray @ 12' 2-3-3 11
15 N=6
880
20
8
5-27-17
N=44
8
12
3-8-6 1 0
N=14
875
SIL TV CLAY - and sand, trace gravel- hard -
gray
25 Continued Next Pa e
Completion Depth: 30.0 ft Sample Types:
Date Boring Started: 8/25/05 ~ Au er Cuttin ; Shelb Tube
Date Boring Completed: 8/25/05 ~ g y
Logged By: DJL Split-Spoon Hand Auger
Drillin Contractor: PSI, Inc. Rock Core DCP
The stratification lines represent approximate boundaries. The transition may be gradual.
Latitude:
Longitude:
Remarks:
ail- PSI
...~. 5362 West 78th Street
Indianapolis, IN 46268
~iiiI1. Telephone: (317) 876-7723
LOG OF BORING B-13
PSI Job No.:
Project:
Location:
016-55037
Center Pointe Crossing Retail Development
111th Street and Michigan Road
Zionsville, Indiana
Drilling Method:
Sampling Method:
Hammer Type:
Boring Location:
3 1/4" 10 Hollow Stem Auger
Shelby Tube/Split Spoon
CME Automatic
Sheet 2 of 2
WATER LEVELS
'Sl- While Drilling None
~ Upon Completion None
::r.. Delay N/A
..r:: STANDARD PENETRATION
til c: ,0 TEST DATA
c~
Qi Gl Gl 0 "7 g> N in blowslft @
p Cl c:i ..r:: B
~ Gl 0 0. 0 (0:.;:; ~
~ -.l ~ Z C !E ....<11 X lOiI PL
c:: 0 Gl c MATERIAL DESCRIPTION m GlGl ~ Moisture Additional
:2 Gl C. ~ 0.1- ~ . LL
0 .s:: Q. os ~a..
~ Q. 0. E g! (3 1 25 Remarks
~ E 00 '0
Gl III III 0 en 1ii'2 ::;;
Gl Cl (!) en en 0 ()
W Gl en 1-0 STRENGTH, tsf
0:: :> a..~
en ... Qu * Qp
25 2.0 4.0
870
SILTY CLAY - and sand, trace gravel - hard -
gray
/S 10 4-19-21 8 X 0 >>
30 N=40
END OFBORING-30' - - - - - - - - --
.. NOTE: Cave-in depth of 22' after removal
of augers
Completion Depth: 30.0 ft Sample Types:
Date Boring Started: 8/25/05 ~..;
D t B . C I t d 8/25/05 Auger Cutting Shelby Tube
ae onng ompee: .
Logged By: DJL Split-Spoon Hand Auger
Drillin Contractor: PSI, Inc. Rock Core DCP
The stratification lines represent approximate boundaries. The transition may be gradual.
Latitude:
Longitude:
Remarks:
(jg_ PSI
...~. 5362 West 78th Street
Indianapolis, IN 46268
I:!.~. Telephone: (317) 876-7723
PSI Job No.:
Project:
Location:
016-55037
Center Pointe Crossing Retail Development
111th Street and Michigan Road
Zionsville, Indiana
Drilling Method:
Sampling Method:
Hammer Type:
Boring Location:
875 25 Continued Next Pa e
Completion Depth: 30.0 ft Sample Types:
Date Bor~ng Started: 8/25/05 ~ Auger Cutting ; Shelby Tube
Date BOring Completed: 8/25/05 .
Logged By: DJL Split-Spoon Hand Auger
Drillin Contractor: PSI, Inc. Rock Core DCP
The stratification lines represent approximate boundaries. The transition may be gradual.
c Ul
Cll C Cl Cll Cll
c:i .r=
~ Cll 0 0. 0
~ ...J ~ z :S.
c 0 Cll Cll
.2 ~ :c Q. Q. ~
10 'E. 0. E ~
f! E
> Cll lU lU 0
Cll 0 C> en en 0
W Cll
a::
0 L.,!: .\
895 5
890 10
885 15
880 20
MATERIAL DESCRIPTION
Surface Elev.: 900.0 ft
Driller reported 9" TOPSOIL
-------------------
SIL TV CLAY - and sand, trace gravel- hard
to firm - brown
12
12
SIL TV CLAY - and sand, trace gravel- firm to CL
soft - brown to gray @ 14'
SIL TV CLAY - and sand, trace gravel- hard-
gray
LOG OF BORING B-14
3 1/4" 10 Hollow Stem Auger
Shelby Tube/Split Spoon
CME Automatic
Sheet 1 of 2
WATER LEVELS
'Sl While Drilling None
.Y Upon Completion None
:[.. Delay N/A
.r= STANDARD PENETRATION
c: 0 TEST DATA
c: ~
0 '7 ~ N in blows/fl @
B \0:;:1 ~
!E ...", 0 I;iiI PL
CllCll I!! X Moisture
t1> 0.1- Additional
Ul . LL
1\I ~Cl... ~
<3 1 25 Remarks
l/) oU '0
<..> -0 :0
l/) lXl... STRENGTH, tsf
:::> 1-0
Cl...~ . Qu * Qp
en
2.0 4.0
2-3-2 19 0 X >>
N=5
CL
4-3-4 23 0 X '*
N=7
3-3-4 12
N=7
'*
'*
1-3-5 12
N=8
3-4-6 11
N=10
*
1-2-4 11
N=6
>>
2-8-14
N=22
9
Latitude:
Longitude:
Remarks:
CIS- PSI
...~. 5362 West 78th Street
Indianapolis, IN 46268
~.,. Telephone: (317) 876-7723
LOG OF BORING B-14
PSI Job No.:
Project:
Location:
016-55037
Center Pointe Crossing Retail Development
111th Street and Michigan Road
Zionsville, Indiana
Drilling Method:
Sampling Method:
Hammer Type:
Boring Location:
3 1/4" 10 Hollow Stem Auger
Shelby Tube/Split Spoon
CME Automatic
Sheet 2 of 2
WATER LEVELS
'Sl While Drilling None
Y Upon Completion None
:[ Delay N/A
.s:: STANDARD PENETRATION
Ul c 0 TEST DATA
c: ~
Ql Gl Gl 0 "T ~ N in blows/ft @
:;::- Cl 0 .s:: B
~ Gl 0 a. 0 co;:; '#.
~ ....J ~ Z g !E ....<11 X WI PL
C 0 MATERIAL DESCRIPTION .. GlGl e Moisture
Gl Gl .. 0.1- . LL Additional
0 ~ :c c. c. ~ IU ~o.. i 1 25 Remarks
~ Q. a. E g1 U
f! E 00 '0
Gl m en :;
Gl 0 Cl m en 0 () -0
en 0 co....
m Gl en STRENGTH, tsf
::l 1-0
a:: o..~
en & Qu lIE Qp
25 20 4.0
SILTY CLAY - and sand, trace gravel - hard -
gray
12
9-10-16 9
N=26
x
>>
870 30
~DOFOO~~3~----------
.. NOTE: Cave-in depth of 24' after removal
of augers
Completion Depth: 30.0 ft Sample Types:
Date Boring Started: 8/25/05 ~ Auger Cutting ; Shelby Tube
Date Boring Completed: 8/25/05
Logged By: DJL Split-Spoon Hand Auger
Drillin Contractor: PSI, Inc. Rock Core DCP
The stratification lines represent approximate boundaries. The transition may be gradual.
Latitude:
Longitude:
Remarks:
{BiJ PSI
~~. 5362 West 78th Street LOG OF BORING B-15
Indianapolis, IN 46268
~.,. Telephone: (317) 876-7723 Sheet 1 of 2
PSI Job No.: 016-55037 Drilling Method: 3 1/4" 10 Hollow Stem Auger WATER LEVELS
Project: Center Pointe Crossing Retail Development Sampling Method: Shelby Tube/Split Spoon "5l While Drilling 16'
Location: 111 th Street and Michigan Road Hammer Type: CME Automatic ~ Upon Completion
Zionsville, Indiana Boring Location: 14'
7- Delay N/A
.r: STANDARD PENETRATION
Ul c 0 TEST DATA
c c:~
CIJ 0 .- 01
CIJ 'ai 01 CIJ c:i .r: B 'c: N in blows/fl @
~ 0 0. 0 CO+:; ~
~ ...J ?:' z g IE ~t/l X I;iiI PL
c: 0 MATERIAL DESCRIPTION III GlCIJ e Moisture
CIJ CIJ III 0.1- . LL Additional
0 ~ :E "is. ~ III :J
~ C. 0. "is. E ~ C3 ~a.. 1ii 1 25 Remarks
11l E 00 '0
> CIJ C5 11l 11l 0 en -0 ::;;
CIJ 0 en en 0 u Cll~
iiJ CIJ en STRENGTH, tsf
0:: ::> 1-0
a..~ ... Qu *' Qp
Surface Elev.: 902.0 ft en
0 2.0 4.0
~...\ ~i~e~:p~rt~d .!l':!~P~~I~ _ _ _ _ _ _ _
900 8 3-4-5 14 >>
N=9
18 SIL TV CLAY - and sand, trace gravel - firm - CL 3-7-9 11 *'
brown N=16
5
895 16 3-5-7 12
N=12
-------------------
16 2-4-10 11 >>
10 N=14
890
SIL TV CLAY - and sand, trace gravel, with CL
10 occasional sand seams - hard to soft - brown 3-4-8 20 X *'
to gray @ 13' N=12
15
885
20
8
1-3-15
N=18
10
1-2-5 11
N=7
880
SIL TV CLAY - and sand, trace gravel, with
occasional sand seams - firm - gray
CL
25 - - - - - - -Conunuea/'Jex7 Pa e - - - -
Completion Depth: 30.0 ft Sample Types:
Date Bo~ng Started: 8/25/05 ~ Auger Cutting ; Shelby Tube
Date Bonng Completed: 8/25/05 .
Logged By: DJL Split-Spoon Hand Auger
Drillin Contractor: PSI Inc. Rock Core DCP
The stratification lines represent approximate boundaries. The transition may be gradual.
10
>>
Latitude:
Longitude:
Remarks:
,;
liS- PSI
...~. 5362 West 78th Street
Indianapolis, IN 46268
~.,. Telephone: (317) 876-7723
LOG OF BORING B-15
PSI Job No.:
Project:
Location:
016-55037
Center Pointe Crossing Retail Development
111th Street and Michigan Road
Zionsville, Indiana
Drilling Method:
Sampling Method:
Hammer Type:
Boring Location:
3 1/4" ID Hollow Stem Auger
Shelby Tube/Split Spoon
CME Automatic
Sheet 2 of 2
WATER LEVELS
'Sj.. While Drilling 16'
.y Upon Completion 14'
'5l Delay N/A
.c STANDARD PENETRATION
Ul c: 0 TEST DATA
e:~
Q) ~ Cll Cll 0 .- Cl N in blows/fl @
Cl ci .c "" 'e:
~ Q) 0 0. 0 B co;::; ';F.
~ ..J ~ Z e: IE '-<II X r.iiiI PL
c: 0 Cll ;:- MATERIAL DESCRIPTION U> CllCll ef Moisture Additional
Cll U> 0.1- . LL
.2 ~ :2 Q. ~ III :::I
iii a. 0. Q. E ~ U ~a.. 1;; 1 25 Remarks
III E 00 .0
> Cll " III III 8 en me: ::;;
Cll 0 (j) (j) U r
[j Cll en STRENGTH, 1st
a:: ::l 1-0
a..~
(j) '" Qu lIE Qp
25 2.0 4.0
SILTY CLAY - and sand, trace gravel - hard -
gray
CL
875
12
2-7-9
N=16
9
x 0
>>
30
~DOFOO~NG~----------
.. NOTE: Cave-in depth of 22 1/2' after
removal of augers
Completion Depth: 30.0 ft Sample Types:
Date Boring Started: 8/25/05 ~.;
Date Boring Completed: 8/25/05 Au~er Cutting Shelby Tube
Logged By: DJL Split-Spoon Hand Auger
Drillin Contractor: PSI, Inc. Rock Core DCP
The stratification lines represent appr~ximate boundaries. The transition may be gradual.
Latitude:
Longitude:
Remarks:
Unified Soil Classification
,~
~
!
'liIl
8
.!!....
j~
i Iii
--:5
f!. ....
C) ..
.. i'
III _
- 0
8:i
.s
E
'4i'
.!:i
14
~
'iij
...8
=....
~o
-g%
=5
l!:5
C>t
~l
,!4
'!
{4
E
-
o
11::
.1'!!
r:
~
e
~
(9701)
MJjor Divisions
iI
o I!
.r: i is
I i Q!
... I! ';J
18"':
l! 't5 &
o 11: Iii
~=.. ~
! } ! 1~
Jil..!! 1i a. "E:!
6 "'s::l
1 '~
C)
...1'
l!.5
<3 2
" c: .$"'I a
:! l'lo!
! !-!
tlI ca...,.
~ l! 80
l1! :J '0 %
1I:C
.!s
cJ!
~J
i.1e
=: l' SM
r!S:!.5
1'1'0
'" a. '5
Is<~
!:!.""'~
S E il'li
U = c
l!:g s
... .Sf 'I
III =.
==
a -
i~~
u =.1'!!
~"a_
Ii '2. S
III ,Sf '"
= = !I)
.0 -tit
u
~c.!!
.2''''0
:z:: E' CD
o
Group
Symbols
GW
GP
GM
GC
SW
SP
Typical Names,
WeD graded gravels, gray.
$and mildUres, rrltle or no lines
PllOrly graded grawls, , gravel-
sand mixtures, little or no fines
d
-
Siltygnriels, Gntvel-sand-
silt mixtures
u
Clayey gravels,grave\-$and-
clay mixtures
Wen graded sands, gravelly
sands, little 01' no fines
PllOrly graded sands, gravelly
sands, little or no lines
d
f--
U
Silty sands,
sand-silt mixtures
SC
Clayey sands,
sand-clay mixtures
ML
Inorganic silts and very firle
sands, fllckftour,silty or
~finesa~orcl8yey
siltS witlullght plasticity
InOrganic clays of tow to
~ium p~, graVelly
clays, sandy clay$, sllty
clays, IeanClay$
Organic $iIt$and organic
silty clays of IoYIplastic;ity
CL
OL
MH
Inorganic siltS, micaceous or
diatomaceoll$fioe sandy or
slIty soils, elastic silts
CH
Inorganic clays of high
p1astiCity,fat clays
Organic clays of medium to
high plasticity, organic silts
OH
Pt
Peat and other highly
(lrgaOic soils
.
,i
'8 :i
~ N. ,~
u 0 en
~% D.o-
.! I ~-~.~
'1J! .~ ~ ~~
e~,.~@;gi
& clIl,'- ,. ....
tt~~~1
I ~ Ii L~
l!'t5; i i~
! &#-! i i iB
Q ~ i : : :
&~l!!i!
'ni~1
'g 'g8,s ~ ~
.;8., 'il ~;
o .5 .......... :E It)
60
1 US.',
I:!!.WI1.
Laboratory Classification Criteria
o.
Co =- greater than 4;
, DIG
\
i'
.AL
Cc = Belween 1 and 3
DIDIDIII
Not meeting all gradation requlrementdor GW.
Alterberg limits below"A"
nne or PI less than 4
Altelberg limits above "A"
rmewith PI greater than 7
011I
Cu= greater than 6;
DIt
Above "A" Hne with PI
I between 4 and 7 are
borderline c:ases requiring
use of dual symbols.
(D.}2
Cc =~Between 1 and 3
DloXD.
Not meeting all gradation requirementt; forSW.
Alterberg Umits below "A"
line or PI less than 4
Melberg Umits above W
Une With PI greatetthan7
PLASTlCIlYCHART
I I
-forClassifieationof fine.grained
--.;.. soils arid fine fraction of
50 _ = coalSeilrained soils. Altelberg
r- limits plotting in hatched area
e--- are bonlerlineclas$ifi~tions
~requiring u~ ofdual$Ymbols.
40 - ~ EqualionofA..fine:
r-- PI =O.73(lL-20)
~
'E
i-3O I
.2
..
.!!
D.
20
== a
10
7
4
o
o
I
I
10
/
,
,
/
'"
,
I ,
UI .A t\l
20,
30 40 5050
Uquld Limit
Limits plotting in hatched
zone with P1 betWeen 4
alld 7 are borderline
cat;es requiring Use of
dualtyl'\1bols,
I
I
I
I
I
I
1
I
/
,
~
CH ,
,
,
,
,
&/
,VI"/
70
90
100
50
Professional Service IndustriE!$, lnc,