HomeMy WebLinkAboutD1.01 FIRST FLOOR DEMO PLAND1 D1 D1 D1 D2 D2 D3 D4 2 D1.01 D1 D4 D5 D5 D5 D6 D5 FIRST FLOOR - EXISTING 0' - 0" ROOF 9' - 0" T.O. FOOTING -2' - 6" B.O. FOOTING -3' - 6" REMOVING EXISTING FOUNDATIONS AS REQUIRED REMOVE WINDOW SYSTEM COMPLETELY REMOVE EXISTING SLAB REMOVE EXISTING COLUMN REMOVE EXISTING FRAMING REMOVE EXIST. ROOF SYSTEM REMOVE EXIST. SHINGLE SYST. JOB NO.: DATE: DRAWING TITLE: ISSUE: STAMP: Project Status 6015 ORCHARD HILL LANE P: 317.520.2558 INDIANAPOLIS, IN 46220 WWW.ARXTHEON.COM D1.01 FIRST FLOOR - DEMOLITION PLAN Project Number111 BENNET ROAD ADDITIONOwnerOctober 20, 2021111 BENNET ROAD, CARMEL, IN 46032Project NumberProject Status 1/4" = 1'-0"1 1st Floor - Demolition Plan DEMOLITION PLAN KEYNOTES D1 REMOVE WINDOW SYSTEM AND ASSOCIATED ACCESSORIES D2 REMOVE PORCH COLUMNS D3 REMOVE PORCH SLAB AND FOUNDATION D4 REMOVE ROOF TO WALL LINE D5 REMOIVE EXIST. GUTTERS & DOWNSPOUTS D6 REMOVE EXIST. SHEATHING AS REQUIRED FOR AIR MOVEMENT A. DEMOLISH EXISTING CONSTRUCTION SHOWN DASHED –COORDINATE WITH NEW CONSTRUCTION B. ITEMS INDICATED FOR DEMOLITION SHALL BE REMOVED AS TO FULLY ALLOW FOR THE PROPER FURNISHING AND INSTALLATION OF SCHEDULED NEW WORK. THIS SHALL INCLUDE DEMOLITION OF ADJACENT ITEMS, ACCESSORIES, AND APPURTENANCES AS NECESSARY. C. DEMOLITION DRAWINGS ILLUSTRATE MAJOR ITEMS TO BE REMOVED.CONTRACTOR SHALL COORDINATE THESE DRAWINGS WITH NEW WORKDRAWINGS AND SHALL BE RESPONSIBLE FOR OTHER ITEMS REQUIRED FOR DEMOLITION TO ACCOMMODATE NEW WORK. D. THE CONTRACTOR IS RESPONSIBLE FOR RETAINING AND RELOCATING SALVAGE AS DESIGNATED BY THE OWNER'S REPRESENTATIVE. E. THE CONTRACTOR IS RESPONSIBLE FOR STORAGE AND PROTECTION OF SALVAGED ITEMS. F. PROTECT FINISHES TO REMAIN FROM DAMAGE DURING DEMOLITION AND CONSTRUCTION. G. PRIOR TO DEMOLITION, ENSURE THE STABILITY OF ANY WALLS TO REMAIN. H. HAZARDOUS MATERIALS INCLUDING, BUT NOT LIMITED TO; ASBESTOS AND/OR LEAD PAINT, IS ENCOUNTERED ON THE PROJECT SITE, THE OWNER SHALL ENGAGE A TESTING COMPANY TO IDENTIFY AREAS AND PROVIDE APPROPRIATE ABATEMENT. DEMOLITION CONTRACTOR SHALL COORDINATE ACTIVITIES WITH ABATEMENT CONTRACTOR. DEMOLITION GENERAL NOTES 1/2" = 1'-0"2 DEMO SECTION # DATE DESCRIPTION 07/27/22