HomeMy WebLinkAboutCorrespondence
26 ~ 2-.
BRENWICK
BRENWICK DEVELOPMENT COMPANY, INC.
12821 East New Market St. Suite 200
Carmel, Indiana 46032
Telephone:
Fax:
317-574-3400
317-574-3919
TRANSMITTAL
TO: Mr. Matt Griffin DATE: December 19, 2005
Co.: Carmel DOCS PROJECT: Village of WestClay
One Civic Square RE: 10012 Plat - BPW Agenda
Carmel, IN 46032 FAX No.
FROM: Kevin Krulik TELEPHONE No. 571-2281
WE ARE SENDING YOU:
o Faxed
Total pages, including cover sheet
Attached via: 0 Mail 0 Fed Ex 0 UPS rgj Courier D Pick up 0 Other
# Copies Revision Date Description
1 Copy of Cover letter to Dick Hill
1 Copy of Cover letter to Angelina
Butler
1 Copy of Replat Application
THE ABOVE ARE TRANSMITTED as checked below:
rgj For Approval
rgj For your use
o As requested
o For review and comment
o FOR BIDS DUE
o Other:
,200
REMARKS:
Please call with any questions.
lJ COpy TO:
Rt.C,t.\\JtJ)
U\:c, \ 9 i
r;i;JCS
If enclosures are not as noted, kindly notify us at once
Operations/forms/transmittal form. doc
Updated 6/14/04
~~
Schneider
INDIANA
Corporate Headquarters
Historic Fort Harrison
8901 Otis Avenue
Indianapolis, IN 46216
Phone: 317.826.7100
Toll-Free: 866.973.7100
Fax: 317.826.7200
Lafayette Office
3725 Rome Drive
Park 26
Lafayette, IN 47905
Phone: 765.448.6661
Fax: 765.448.6665
Carmel Office
12821 E New Market Street
Suite 100
Carmel, IN 46032
Phone: 317.569.8112
Fax: 317.826.6410
Avon OffIce
Building 1000
5250 E US Highway 36
Suite 250
Avon, IN 46123
Phone: 317.745.9926
Fax: 317.745.9973
Merrillvllle Office
9800 Connecticut Drive
Suite Bl-508
Merrillville, IN 46307
Phone: 219.644.3692
Fax: 219.644.3682
NORTH CAROLINA
Charlotte Office
2151 Hawkins Street
Suite 201
Charlotte, NC 28203
Phone: 704.333.8360
Fax: 704.333.8362
IOWA
ProMap Office
1531 Airport Road
Suite 2
Ames, IA 50010
Phone: 515.233.3311
Fax: 515.233.4575
The Schneider Corporation
12821 E New Market Street, Suite 100 Carmel, IN 46032-7258 Phone: 317.569.8112 Fax: 317.826.6410
December 19,2005
Angelina Butler
Department of Community Services
One Civic Square
Carmel, IN 46032
RE: THE VILLAGE OF WEST CLAY - REPLAT SECTION 10012
TSC # 1238.10012
Dear Angelina,
Please find enclosed the following for the REPLAT in Section 10012 in the Village of
WestClayfor Lots 150, 151A, 1518, and 152:
. Replat Application
. 1 Signed Mylar
. 2 Signed Paper Copies
. 1 Legal Description (for replat area)
The Village of WestClay Section 10012 secondary plat was previously recorded, Instr.
#200500070088. Brenwick Development is re-platting Lots 150, 151, and 152; creating a
total of 4 lots. The new lot numbers are 150, 151A, 151B, and 152. This is an increase of 1
lot.
Please review and forward any comments. Once review is complete, please assign a docket
number so that we may pay the required fees as determined by DOCS prior to the BPWS
meeting. Please also have Mike Hollibaugh sign the replat and forward to Dick Hill in
Engineering to be placed on the next BPWS agenda.
I have also submitted a paper copy to Dick Hill in Engineering so that he is aware we are
requesting the replat to be on the next available BPWS agenda.
If you should have any questions, or are in need of additional information, please feel free to
contact me at your convenience.
Sincerely,
THE SCHNEIDER CORPORATION
(:::;> . ~~ (
Bra~~.~' .
Project Manager
4
RECEIVED
DEe 1 9 2005
DOCS
Enclosure
www.schneidercorp.com
BRENWICK
December 19, 2005
Mr. Dick Hill
Assistant Director, Department of Engineering
One Civic Square
Carmel, IN 46032
Re: REPLAT of The Village of West Clay Section 10012
Dear Dick,
Please consider this a formal request to be placed on the agenda of the January 5th Board
of Public Works meeting regarding plat approval for the above referenced project. If you
have any questions or should require further information please feel free to contact me at
574-3400.
Sincerely,
BRENWICK DEVELOPMENT COMPANY, INC.
~>
. ':::--==; ~. ~..-.
Kevin Krulik L.S.
Project Manager
l\
"-'
RECE\\IED
".'>':'V-
DEe' 9 :..,,'J
DOCS
Enclosures: 1 paper copy of re-plat
Cc: Matt Griffin, Angelina Butler
12821 E. New Market St. Suite 200 . Carmel, Indiana 46032 . 317.574.3400 . 317.574.3919 Fax
brenwNi!Wfw&OO'bce\<a6.Bm\ W estClay\l 00 12\hill121905 .doc http://www.brenwick.com
.--j .4
_m____~~~~-~_:_==~fr__q-w~:t.\"l-<;j?C_:_
April 21, 2005
EL
Mr. Brandon T. Burke, PE
The Schneider Corporation T B MA:
12821 East New Market Street, Suite 10()JAMES RAINARD, YOR
Carmel, IN 46032
RE: Village of West Clay, Section lOOl2-Project Review #2
Dear Mr. Burke:
The City has received your comment letter and drawings dated March 9, 2005 based upon the City review of December
29,2004.
The comments from the City review have been satisfactorily addressed with the following exceptions:
COMMENTS CONSTRUCTION PLANS
13. Sheet CIOl and C102
. Comment on previous review: "Please make the flood route arrows from the off-site to the west match
the arrow in the legend." The flood route arrows have been removed. Please add them back to the
drawings.
. Comment on previous review: "It is apparent that the roadway area draining to Structures 674 and 675
is not being detained." Thank you for your response. Please confirm that this is acceptable to the
Hamilton County Surveyor's Office.
. Comment on previous review: "It is apparent that there are concentrated discharges from most of the
aIleys into the main streets. It is also apparent that there are long distances in the alleys themselves
without drainage inlets. Please provide calculations that demonstrate the ability of the alleys to convey
the runoff generated to the proposed inlets without overwhelming the alley "gutter". Also, please
provide calculations for the gutter capacity of the main streets to convey the concentrated discharges
from the alleys to the inlets in the main streets." The Department of Engineering has not received the
requested calculations.
18. Sheet C601-C603
. Comment on previous review: "There is not the required minimum cover over the pipe at structures
609,660,661,674,675,713." The pipe between structures 674 and 675 does not have the minimum
one foot of cover between the bottom of the pavement aggregate course and the top of the pipe. By the
Department's calculations, 8 inches of additional cover is required. The Department requests that this
piping network be lowered and the outlet pipe extended to daylight such that minimum cover is
provided.
. Comment on previous review: "Please demonstrate on plans or in the Drainage Report that unmatched
pipe crowns does not have a negative effect on the HGL and that the HGL remains below the top of
castings for the design storm." Please indicate where in the plans or the drainage calculations this has
been addressed.
20. Sheets C801-C803
. Please revise typical water main installation detail noted on Sheet C703 and note 3, G on Sheet C703 to
comply with the requirements outlined in paragraph 4 of article 20 of project review letter # 1.
. Revise Detail 1/C803 to indicate B-borrow for structure backfill in lieu of#8 stone noted in text with
leaders (general note is acceptable).
21. Sheets LlOl and LlO2-Landscape Plans
. Please remove Landscape Plans from this set of plans. Approval oflandscaping does not come from the
Department of Engineering.
These comments represent the Department of Engineering's second review of the construction plans for this project.
We request that all responses to our comments be provided in \Hiting. Failure to provide written responses may result
in delay of the review process.
It is critical that this office be made a\v!,!re of all modification made on the plans being re-submitted, particularly if any
such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans indicating all
revisions. Please notify us of any changes.and specifically state any changes, including changes resulting from Plan
Commission, Special Studies or other com~ittee meetings.
DEPARTMEt'\T OF ENGINEERING
ONE CIVIC SQUARE, CAR1'vlEL, IN 46032 OFFICE 317.571.2441 FAX 317.571.2439
El\WL engineering@ci.carmel.in.us
.
All bonds and performance guarantees (if required) must be posted prior to Engineering Department approval. Also,
Board of Public Works and Safety approval and any other governing agency approvals (if required) must be obtained
prior to Engineering Department approval.
Comments from the drainage review have been issued. Please resubmit drawings that address both the comments of
this letter and any required drainage revisions.
The Department of Engineering reserves the right to provide additional comments based on subsequent reviews.
Cc: Jon Dobosiewicz, Department of Community Services
John Duffy, Carmel Utilities
Paul Pace, Carmel Utilities
Kevin Krulik, Brenwick Development Co.
Greg IIko, Crossroad Engineers
Greg Hoyes, Hamilton County Surveyor's Office
Project File
Engineering Department Review
S:\DHILL\PROJREV04\VILLAGEWCLA YI 00 i2REV2
Construction/Stormwater Pollution Prevention Plan
Technical Review and Comment (Form 1)
Project Name: ""4,"' ;<'('kiyS~~ County: Hamilton
Plan Submittal Date: 03/31/05 Hydrologic Unit Code: 5120201090060
Project Location Description: Village of West Clay, 13lst and Towne Roads 20 ac
Latitude and Longitude: Lat- 39-58'-52" N Long- 86-11'-59" W
Civil NE Section:
28
3E
=
Q
"i Project Owner Name: Brenwick Development
E Contact: Kevin Krulik
Q .
iE Address: 12821 E. New Market Street, SUite 200
...
't City: Carmel State: IN
';-' Phone: 317-547-3400 FAX:
'"'
~ Plan Preparer Name: Brandon Burke
Affiliation: Schneider Corporation
Address: 12821 E. New Market Street, Suite 100
City: Carmel State: IN
Phone: 317-569-8112 FAX: 317-826-6410
Zip: 46032
E-Mail:
Zip: 46032
E-Mail: BBVRKE@schneidercorp.com
Review Date: 04/12/05
~ Principal Plan Reviewer: John B. South P.E. CPESC
.~ Agency: Hamilton County Soil and Water Conservation District
~
~ Address: 1108 South 9th Street
; City: Nob1esville
it Phone: 317-773-2181
Assisted By:
FAX:
State: IN
317-776-1101
Zip: 46060
E-Mail: john-south@iaswcd.org
../ PLAN IS ADEQUATE: A comprehensive plan review has been completed and it has been determined that the
plan satisfies the minimum requirements and intent of 327 lAC 15-5.
o Please refer to additional information included on the following page(s).
o Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana
Department of Environmental Management. Construction activities may begin 48 hours following the submittal of
the NO!. A NOI must also be sent to the SWCD,
o A preliminary plan review has been completed; a comprehensive review will not be completed within the 28-day
review period. The reviewing authority reserves the right to perform a comprehensive review at a later date and
revisions to the plan may be required at that time to address deficiencies.
o Please refer to additional information included on the following page(s).
o Submit Notice ofIntent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana
Department of Environmental Management. Construction activities may begin 48 hours following the submittal of
the NO!. A NOI must also be sent to the
o PLAN IS DEFICIENT: Significant deficiencies were identified during the plan review.
o Please refer to additional information included on the following page(s).
o DO NOT file a Notice of Intent for this project.
o DO NOT commence land disturbing activities until all deficiencies are adequately addressed, the plan re-
submitted, and notification has been received that the minimum requirements have been satisfied.
should be mailed or delivered to the Principal Plan Reviewer identified
in the Plan Review Section above.
DNR, Division of Soil Conservation
Page 1 ofl
Revised J 2/09/03, Form J
o
~~
Schneider
o
January 10, 2005
~
~~~
~~
~~~<J
~ t&-
Jon Dobosiewicz
Department of Community Services
One Civic Square
Carmel, IN 46032
RE: VILLAGE OF WESTCLAY - SECTION 10012
Docket #0411 0042-SP
Dear Jon,
Please find enclosed a check in the amount of $2,950 for the Secondary plat filing fee for the Village of West
Clay Section 10012.
If you should have any questions, or are in need of additional information, please feel free to contact me at
your convenience.
Sincerely,
THE SCHNEIDER CORPORATION
<r ;{:S
~
Brandon Burke, P.E.
Project Manager
Enclosure
N :\1238\1 0 12\docs\dobosiewiczO 1-1 0-05.doc
~
THE SCHNEIDER CORPORATION
12821 E. New Market Street Suite 100 Carmel, Indiana 46032 317-569-8112 Fax 317-826-6410
www.schneidercorp.com
15498
CITY OF CARMEL 0 January 10, 2005 Oeck No 15498
Document Document
No. Date Amount Discount Net Amount
DOCKET # 04 01/10/05 2,950.00 0.00 2,950.00
Total
<<
o Lf I!J)}]!!~~_
CI
EL
December 29, 2004
JAMES BRAlNARD, MAYOR
Mr. Brandon T. Burke, PE
The Schneider Corporation
12821 East New Market Street, Suite 100
Carmel, IN 46032
RE: Village of West Clay, Section lO012-Project Review #1
Dear Mr. Burke:
We have reviewed the plat and plans submitted for this project and offer the following comments:
GENERAL INFORMATION
1. The project site is located within current City of Carmel Corporate Limits.
2. Jurisdictions:
. Streets and Right of Way, Curbs, Street Signs, Sidewalks - City of Carmel.
. Water - Carmel Utilities.
. Sanitary Sewers - Clay Township Regional Waste District
. Storm SewerslDrainage - Hamilton County Surveyor's Office (City of Carmel Review).
. Regulated/ Legal Drains - Hamilton County Surveyor's Office.
3. Board of Public Works and Safety Requirements:
. Water Availability
. Temporary Construction Entrance (if applicable and iflocated at a location other than planned
permanent entrances)
. Please be advised that any opell ClIts of dedicated streets will reqllire separate Board of PlIblic Works
alld Safety approval.
. Any permanent improvement (including irrigation systems) to be installed within dedicated right of way
or dedicated easements. This approval would require a Consent to Encroach Agreement between the
Owner and the City of Carmel.
. Secondary Plat approval.
. Right of Way Dedication (if applicable)
A sc.hedule for Board of Public Works and Safety meeting dates and agenda deadlines was previously sent
for your use. Please use the Engineering Department deadlines for submissions to the Board.
Any submissioll to the Board requires prior approval by tlte Carmel Clay Plan Commission andlor tlte
Board of Zoning Appeals (if applicable) and completioll of review by the Technical Advisory Committee.
All writtell requests to be placed 011 tlte Board's agellda mllst inclllde the appropriate Docket Number and
tlte date (or dates) of approval by the Plall Commissioll alldlor the Board ofZollillg Appeals (if
applicable).
4. T.A.C. ReviewlDrawings submitted for approval:
We request that all comments and comment letters generated by this office be answered in writing and be
accompanied by a drawing reflecting requested revisions. Final drawings will not be approved for
construction until all Engineering Department issues have been resolved. The design engineer must certify
all drawings submitted for final approval. This office will require a minimum of three-sets of drawings for
approval after all issues have been resolved. The drawings will be stamped as approved and will be signed
by the City Engineer. The Owner will receive one-set which is to be maintained on the construction site at all
times. Our Public Works Inspector will receive one-set and one-set will be maintained in the Engineering
Department.
DEPARTMENT OF ENGINEERING
ONE CIVIC SQUARE, CARMEL, IN 46032 OFFICE 317.571.2441 FAX 317.571.2439
EMAlL engineering@ci.carmeLin.us
~~;
Mr. Brandon 1. Burke, PE
December 14, 2004
Page 2
We will approve an additional two-sets of drawings, totaling five-sets if desired. The additional sets must be
provided with the minimum three-sets.
5. Please be advised that any installation of signs, walls, irrigation systems, etc. within dedicated right of way or
dedicated easements will require a Consent to Encroach Agreement with the City ofCarme!'s Board of
Public Works and Safetv.
6. Carmel UtilitieslWater Distribution should be provided copies of all drawings and revisions for review of
water issues. They will provide a separate review regarding these issues.
7. Carmel Utilities does not subscribe to "Holey Moley" and should be contacted directly for all water main
locations.
8. I have sent copies of the following previously and will not send additional copies unless requested to do so:
. Subdivision Project Approval Procedures
. Performance Release Procedure
. Subdivision Building Permits
. Permit Data, Contacts, etc.
. Street Sign requirements
BONDING REOUIREMENTS
9. Individual Performance Guarantees will be required for the following subdivision imRrovements:
. Streets (base, binder and surface). You may bond perimeter street improvements separately.
. Curbs
. Water Mains
. Street Signs
. Sidewalks (builders lot sidewalks and perimeter right of way sidewalks/perimeter right of way asphalt
paths/common area right of way sidewalks may be bonded separately).
The amount of the Performance Guarantee is based upon a certified Engineer's Estimate for 100% of the cost
of labor and materials to construct the individual improvements, to be provided by the design engineer.
Please provide detailed Engineers Estimates for each improvement including unit costs, quantities, materials
and types of materials, etc. Upon completion and release' of individual Performance Guarantees, a three-year
Maintenance Guarantee will be required. The Maintenance Guarantee amount is based upon 15% of the
Performance amount for Streets and Curbs and 10% of the Performance amount for all other improvements:
Performance Guarantees may be Performance or Subdivision Bonds, Irrevocable Letters of Credit or
Cashier's/CertifiedlOfficial Checks. Please reference the enclosures for more detailed explanation of our
procedures.
AVAILABILITY AND CONNECTION FEES
10. Availability (acreage) Fees must be paid after all other Engineering Department requirements have been
satisfied and prior to the approved start of construction activities. Availability Fees are based upon total
platted acreage for the development at the current rate of$I,01O.00 per acre (Water Availability Fee). Based
upon the secondary plats indicated acreage, the following Water Availability Fees would apply:
Section 10012 -
20.09 Acres @ $1,01O.00/Acre = $20,291.00
Water Connection Fees are currently $1,310.00 per single-family residence. Connection Fees are paid
when the infrastructure has been completed, satisfactory test results obtained and the subdivision has been
released for building permits. Water Connection Fees are paid on a oer-Iot basis.
. If all irrigatioll system, swimming pool or clubhouse is planned for this, or any future section of
the development, additional Water Connection Fees will be assessed based UpOIl the
recommendatioll of the Director of Carmel Utilities. Additiollal Board of Works approval is also
required.
COMMENTS SECONDARY PLAT
II. The 20- Year Thoroughfare Plan indicates West 13151 Street as a Residential Parkway with a total right of way
requirement of 100-feet, 50-feet half. The plat indicates a right of way of90-feet.
12. Please indicate corner monumentation symbols in the legend.
-
.,'
COMMENTS CONSTRUCTION PLANS
13. Sheet CIOI and CI02
. The width of most streets where subsurface drain is required is typically 30-feet or less from back of
curb to back of curb. In this section on Broad Street, with the median, there is a separation of 56-feet
between parallel subsurface drain runs. Please demonstrate that the subsurface drain is as effective with
the 56-foot separation with medians as it would be at the 30-feet or less separation without medians.
. Please label alleys as private.
. It appears that sidewalks do not continue through the alley pavement but instead abut each side of the
pavement. WiII the entire entrance apron be concrete like a commercial drive entrance? Is it possible to
construct as concrete now and not have to consider this in the future?
. The Department assumes that Lots 144-149 and Lots 156-160 are being served by existing sanitary
service laterals and that the Clay Regional Waste District is agreeable to the lengths of some of the
service laterals.
. Please delete General Note 4 from these sheets.
. Please add curve data for each of the horizontal curves.
. Please indicate the Flood Route for Pond No.3.
. Please make the flood route arrows from the off-site to the west match the arrow in the legend.
. Please indicate a MFPG for Lot 184.
. Please define MFPG in the legend with the same note as in Section 9007.
. Please label the swale slope between Structures 678 and 676 and label the swale to Structure 679 to have
a I % minimum slope.
. Please indicate the pond spillway.
. The City recommends that subsurface drains be provided under inverted crowns.
. It is apparent that the roadway area draining to Structures 674 and 675 is not being detained.
. It is apparent that there are concentrated discharges from most of the alleys into the main streets. It is
also apparent that there are long distances in the alleys themselves without drainage inlets. Please
provide calculations that demonstrate the ability of the alleys to convey the runoff generated to the
proposed inlets without overwhelming the alley "gutter". Also, please provide calculations for the gutter
capacity of the main streets to convey the concentrated discharges from the alleys to the inlets in the
main streets.
. Please revise General Note 14 on each sheet to include sidewalk and curbing.
. The median opening for the clubhouse is very close to the intersection. Is it possible to locate this
opening further to the s01.l;th?
. The Department will not allow the proposed alley access to 13151 Street. Please contact the Department
to review this matter.
. Should the lots adjacent to the flood route from the west be provided with an MFPG based on the
highest point of the flood route?
. Is it not possible to align the alley entrances behind Lots 15- I 52 and Lots I53-155?
. The Department assumes that there wiII be no drive cuts on the main streets and that all access wiII be
from the alleys?
. 'Why does the 9-foot multi-use path only come part way into Broad Street?
14. Sheet C I 07 - Please add note that all regulatory signs and their placement require ordinances approved by
the City Council of the City of Carmel. The Contractor shall coordinate the purchase and installation of the
proposed signs with the Developer and the Carmel Street Department:
15. Sheets C201-C203
. Please add the following note to each sheet: "For installation of Storm Mains, Water Mains, Sanitary
Mains, Water Service Laterals, Sanitary Service Laterals under City streets, regardless of the jurisdiction
of the utility, the minimum cover from the top of the installed pavement to the top of the instaIled pipe
shall be the pavement section thickness (all bituminous and aggregate material above the subgrade) plus
1-0". If the standard practice of the utility that has jurisdiction over the installation has a more stringent
cover requirement, the more stringent requirement shall govern."
. Please indicate the water main crossings on the street profiles.
16. Sheet C301-C302
. According to the 20- Year Thoroughfare Plan, 13151 Street is a Residential Parkway with a total right of
way requirement of 100-feet. The plans indicate a right of way of90-feet.
. A 9-foot multi-use path is indicated. Please show a I O-foot multi-use path.
. Please add a note that requires the existing pavement to be sawcut to a clean edge where new pavement
will be placed adjacent to existing pavement.
. Please add a note requiring all striping to be thermoplastic.
p
. Please add a pavement detail or text to the legend that requires the following pavement section for all
paving within the 13151 Street right-of-way: 1.5" HAC. Surface #11 over 2" HAC. Binder #8 over 3"
H.A.C. Base #5D over 7" #53 Stone over 4" #2 Stone.
. Please revise Maintenance of Traffic notes to be specific to this project.
17. Sheet C401-C403
. Please revise backfill note in legend to include the following: "Bedding, haunching and initial backfill
materials, placement and compaction for water mains, water service laterals, sanitary mains and sanitary
service laterals under and within 5-feet of pavement shall be in accordance with the standard practice of
the utility that has jurisdiction over the installation. Final backfill for water mains, water service laterals,
sanitary mains and sanitary service laterals under and within 5-feet of pavement shall be B-Borrow for
Structure Backfill meeting the material requirements of the INOOT and shall be compacted in 6-inch
maximum lifts to not less than 95% Standard Proctor Density for the entire depth of the material placed.
The backfill for the top 6-inches of the excavation below the start of the aggregate subbase of the
pavement shall beNo. 53 Stone meeting the material requirements of the INDOT and shall be
compacted to not less than 95% Standard Proctor Density. Ifthe standard practice of the utility that has
jurisdiction over the installation has a more stringent final backfill requirement, the more stringent
requirement shall govem."
. Please add General Note 9 as follows: "For installation of Storm Mains, Water Mains, Sanitary Mains,
Water Service Laterals, Sanitary Service Laterals under City streets, regardless of the jurisdiction of the
utility, the minimum cover from the top of the installed pavement to the top of the installed pipe shall be
the pavement section thickness (all bituminous and aggregate material above the subgrade) plus 1-0". If
the standard practice of the utility that has jurisdiction over the installation has a more stringent cover
requirement, the more stringent requirement shall govem."
18. Sheet C601-C603
. There is not the required minimum cover over the pipe at structures 609, 660, 661, 674, 675, 713.
. Is it not possible to make the slope of all pipes between Structures 640-644 0.3% minimum slope?
. Add General Note 5 to each sheet as follows: "For installation of Storm Mains, Water Mains, Sanitary
Mains, Water Service Laterals, Sanitary Service Laterals under City streets, regardless of the jurisdiction
of the utility, the minimum cover from the top ofthe installed pavement to the top of the installed pipe
shall be the pavement section thickness (all bituminous and aggregate material above the subgrade) plus
1-0". If the standard practice of the utility that has jurisdiction over the installation has a more stringent
cover requirement, the more stringent requirement shall govern."
. Please demonstrate on plans or in the Drainage Report that unmatched pipe crowns does not have a
negative effect on the HGL and that the HGL remains below the top of castings for the design storm
. Structures 674 and 675 cannot be constructed with 6" from top of pipe to top of concrete portion of
structure.
. Please show the water main crossings on these sheets.
19. Sheet C701-C702
. Please revise note regarding placement of valves in pavement to include sidewalks and curbing.
. Please add General Note 6 as follows: "Bedding, haunching and initial backfill materials, placement and
. compaction for water mains, water service laterals, sanitary mains and sanitary service laterals under and
within 5-feet of pavement shall be in accordance with the standard practice of the utility that has
jurisdiction over the installation. Final backfill for water mains, water service laterals, sanitary mains
and sanitary service laterals under and within 5-feet of pavement shall be B-Borrow for Structure
Backfill meeting the material requirements ofthe INOOT and shall be compacted in 6-inch maximum
lifts to not less than 95% Standard Proctor Density for the entire depth of the material placed. The
backfill for the top 6-inches of the excavation below the start of the aggregate subbase of the pavement
shall be No. 53 Stone meeting the material requirements of the INOOT and shall be compacted to not
less than 95% Standard Proctor Density. If the standard practice of the utility that has jurisdiction over
the installation has a more stringent final backfill requirement, the more stringent requirement shall
govern. "
. Please add General Note 7 as follows: "For installation of Storm Mains, Water Mains, Sanitary Mains,
Water Service Laterals, Sanitary Service Laterals under City streets, regardless of the jurisdiction ofthe
utility, the minimum cover from the top of the installed pavement to the top of the installed pipe shall be
the pavement section thickness (all bituminous and aggregate material above the subgrade) plus 1-0". If
the standard practice of the utility that has jurisdiction over the installation has a more stringent cover
requirement, the more stringent requirement shall govern."
20. Sheets C801-C803
. Please revise Cross Sections A-A, B-B and C-C to provide the following pavement section: 1.5" H.A.C.
Surface #11 over 2" H.A.C. Binder #8 over 3" H.A.C. Base #50 over 7" #53 Stone.
.J'OC;
. Detail 6, Sheet C801 shows a 5'-0" minimum sidewalk (which is the City standard) but the cross
sections indicate 4' -0" sidewalks.
. Please add the following text to the sidewalk detail notes: "Sidewalk constructed with driveways or alley
entrances shall have minimum thickness of6" or thickness of the driveway or alley apron, whichever is
greater. "
. DetailS, Sheet C802 and "Typical Water Main Installation" Detail on Sheet C703. Please revise the
detail such that the following items are specified: "Bedding, haunching and initial backfill materials,
placement and compaction for water mains, water service laterals, sanitary mains and sanitary service
laterals under and within 5-feet of pavement shall be in accordance with the standard practice of the
utility that has jurisdiction over the installation. Final backfill for water mains, water service laterals,
sanitary mains and sanitary service laterals under and within 5-feet of pavement shall be B-Borrow for
Structure Backfill meeting the material requirements of the INDOT and shall be compacted in 6-inch
maximum lifts to not less than 95% Standard Proctor Density for the entire depth of the material placed.
The backfill for the top 6-inches of the excavation below the start ofthe aggregate subbase of the
pavement shall be No. 53 Stone meeting the material requirements of the INDOT and shall be
compacted to not less than 95% Standard Proctor Density. If the standard practice of the utility that has
jurisdiction over the installation has a more stringent final backfill requirement, the more stringent
requirement shall govern."
. Detail I, Sheet C803. Please revise the detail such that the following items are specified: "Bedding,
haunching, and .initial backfill for all RCP installations shall be B-Borrow for Structure Backfill meeting
the material requirements of the INDOT. Bedding shall be placed in the trench bottom such that after the
pipe is installed to grade and line, there remains a 4-inch minimum depth of material below the pipe
barrel and a minimum of3-inches below the bell. For pipe sizes 66-inches and larger, the minimum
depth of material below the pipe barrel shall be 6-inches. Bedding, haunching and initial backfill shall be
compacted in 6-inch maximum lifts to not less than 95% Standard Proctor Density for the entire depth of
the material placed. The backfill shall be brought up evenly on both sides of the pipe for the full length
of the pipe. Haunching shall extend to the springline of the pipe. The limit of initial backfill shall be 6-
inches above the springline. Minimum trench width shall be the outside diameter of the pipe plus 18-
inches. Final backfill for all RCP installations under and within 5-feet of pavement shall be B-Borrow
for Structure Backfill meeting the material requirements of the INDOT and shall be compacted in 6-inch
maximum lifts to not less than 95% Standard Proctor Density for the entire depth of the material placed.
The backfill for the top 6-inches of the excavation below the start of the aggregate subbase of the
pavement shall be No. 53 Stone meeting the material requirements of the INDOT and shall be
compacted to not less than 95% Standard Proctor Density. Final Backfill for all RCP installations greater
than 5-feet of pavement shall be clean fill material free ofrocks larger than 6-inches in diameter, frozen
lumps of soil, wood or other extraneous material, compacted in 12-inch maximum lifts to not less than
90% Standard Proctor Density for the entire depth of the excavation.
. Please delete Detail 17 on Sheet C80 I. The County Detail on Sheet C806 applies.
21. Sheets LIOI and Ll02-Landscape Plans
. Please remove Landscape Plans from this set of plans. Approval oflandscaping does not come from the
Department of Engineering.
These comments represent the Department of Engineering's initial review of this project. Please provide our office
with a follow-up letter with written responses to the above comments and revised plans indicating all revisions. Second
and subsequent reviews will focus only on revised items. It is critical that this office be made aware of all
modifications made on the plans being re-submitted, particularly if any such changes are considered "new" or fall
outside of our initial review. If you have questions, please call Mike McBride or me at 571-2441.
Enclosures
.,.-:.
Cc: Jon Dobosiewicz, Department of Community Services
John Duffy, Carmel Utilities
Paul Pace, Carmel Utilities
Greg Hoyes, Hamilton County Surveyor's Office
Project File
Engineering Department Review
S:\DHILL\PROJREV04\VILLAGEWCLA YIOOI2REVl
City of Carmel
Fire Department Headquarters
2 CIVIC SQUARE
CARMEL, INDIANA 46032
Voice (317) 571-2600 Fax (317) 571-2615
Fire Prevention Bureau
Brandon Burke, P.E.
Schneider Corporation
12821 E. New Market St. Suite 100
Carmel, IN 46032
RE: Village of Clay West - Section 10012
LETTER OF APPROVAL
The undersigned has reviewed the proposed plans for
Village of Clay West - Section 10012
and has approved the plans subject to the following:
1. Our office, in conjunction with the Department of Community Development, are requesting in
newly platted subdivisions, fire hydrant makers be installed in the street pavement perpendicular
to the fire hydrant. This will allow the fire department to more easily spot fire hydrants during an
emergency.
2. Will this project contain an amenity area? If so our office is requesting a Knox box installed on
the building for emergency access. Knox product may be ordered on-line at www.knoxbox.com
3.
4.
5.
6.
Please respond to the above noted condition(s) in writing and submit to our office prior to the
scheduled Technical Advisory Meeting for this project.
Date: December 14.2004
By: Gary Hoyt, Fire Marshal
Carmel Fire Department
12/87/2884 14:10
3177769628
HAMILTON CO SURVEVOR
PAGE 01/03
J
~7(enroll C. 'If'llrl!, SlIIvryor
'r/iw (J ri) iib.84~$
'Fax (j17' 77h-~6J.S
SlIi/co ~~$
OtiC :Homilton C~m't>' .~ql/ar~
)"Dble~l'ifll'o 1III/Imlo 4bOC;O-,1;lJO
Re: VUlage of West Clay - Section 10012
~o~iSe=J
December 14t 2004
The Schneider Corporation
A TTN: Brandon Burke
12821 East New Market Street, Suite 100
Cannel, IN 46032
VIA FACSIMILE: 826-6410
Dear. Mr. Burke:
We have reviewed the construction plans submitted to the Hamilton County Surveyor's
Office on December 1, 2004 for this project and have the following comments:
1. The proposed project falls in the jurisdiction of the City oCCarmel.
2. The proposed project DOES NOT fall in a Cannel Wellhead Protection Zone.
3. The proposed project falls in the Elliott Creek Regulated Drain Watershed.
4. This project will be a Hamilton County Regulated Drain Subdivision, subject
to approval of the Hamilton County Drainage Board. As pet' the prior
agreement for the Village of West Clay, the underdrains will not be part of the
regulated system.
S. Please submit the following procedural items to this office, petition for
regulated subdivision, non-enforcement request for subdivisiont outlet pmnit
(Elliott Creek Drain), engineer's estimate, and all associated bonds for 120%
of construction cost. The applications are available on our website at
htlP:llwww.co.hamilton.in.us. go to Departments. Surveyor, and Drainage
Pennits. Please Dote a new Petition for Replated Drain Subdivision Is
posted OD the Hamilton County website.
12/B7/2BB4 14:1B 3177769628
HAMILTON CO SURVEYOR
PAGE B2/B3
I
6. The proposed project appears to fill in and block the existing channel that is in
place as part of Elliott Creek. The channel carries water from Lakeside Park,
Towne Pointe, and undeveloped areas up stream of this site. This channel is
not regulated drain but does carry water ftom regulated drain subdivisions.
This office will Dot allow this flow to be block by the development and it will
need to be worked out before this section will be approved.
7. Please incorporate the HCSO approved structure date table (Standard D-19) as
the format.
8. Please label the MFPGt MFFt or pad grade on lot 184.
9. The proposed. pond needs to contain a spill way in the bank of the pond, set at
the 100 year elevation (see detail 0-8). The 100 year flood emergency routing
must be set level with the spiUway and preferably maintain positive fall.
10. HCSO Standard Detail 0-8 requires a IS' easement around the pond from the
top of bank. Please increase the rear yard D.U.& S.B. on lot 184 and the
future lots in 9001 to 15 feet.
11. The plat is a little Mclear in regards to DogwOod Pond Commons and
Commons Webster Park. Are they both the same common area? Does the
188,121 sq. ft. include both areas and is it all dedicated D.V. & S.B.?
12. What does P.A. stand for On the plat (Broad Street median areas)?
13. The easement label should be moved from under the square feet area for
Commons (west side ofproject).
14. Structure 679, 676. and 711 need debris guards lIS per detail D-12. Please
label this on the development plan and the P & P sheets.
1 S. Please include HCSO Standard Detail 04 in the construction plans and show
the bank armonnent at structure 710 on the development plan.
16. Please include HCSO Standard. Detail 0-5 in the construction plans.
17. I win require a field verified depth on the existing private tile. to be connected
into structure 610, before final approval will be given to this section.
18. The road cut on 131M street will need to be approved by the City of Carmel
and the repair must be to their standards.
19. Please submit drainage calculations with the next submittal.
20. Please note the additional comments may be wammted at a later date.
12/B7/2BB4 14:1B
3177769628
HAMILTON CO SURVEYOR
PAGE B3/B3
I
Should you have any questions. I can be reached at 317-776-8495.
~~
Greg Hayes
Plan Reviewer
cc: Jon Dobosiewicz - Carmel DOCD
John South - HCSWCD
Steve Broermann - HCHD
Dick Hill- Cumel Bngineering
Brenwick Development
Q
u
CITY OF CARMEL
Department of Community Services
One Civic Square
Carmel, IN 4&X32
(317) 571-2417
Fax: (317) 571-2425.
Fax
To: ~,(GndoY\ ~Vy k
Fax: 8 2 LP - loLl I 0
From:
A.. ~nn
~
12- ~ .. 6L.j
Pages:
Phone:
Date:
Re: \J OWe -
See.. \ CK.l \ 2..
CCI
D Urgent D For Review D P.lease Comment 0 Please Reply
[J Please Recycle
(.D
CCOpy
City of Carmel
VIA FAX: 826-6410
Original by mail
December 3,2004
Brandon Burke
Schneider Corporation
12821 E New Market Street, Suite 100
Carmel, IN 46032
RE: Village of West Clay, Section 10012 (#04110042 SP) -Secondary Plat Application
Dear Mr. Burke:
This letter is in response to your Secondary Plat Application for Village of WestClay, Section 10012. This is a
preliminary letter to let you begin on revisions. Members at the T AC Meeting will make additional comments on
December 15. Please complete the following items after you have received additional comments at the TAC
Meeting.
Section 10012 Plat
1. Please place docket number on plat: #04110042 SP.
2. Provide a paragraph describing the water, sanitary sewer, and storm drainage systems.
3. Show iron pins on the comer of each lot.
4. Per the Thoroughfare Plan, please show the Yz RW on 13151 Street as being 50-ft.
5. Please show the bottom, normal, and 100-yr pond elevations on the plat.
6. Please provide a copy of your written correspondence to TAC members.
7. Sheet 2: adjust the text & numbers under the word Commons.
Construction Plan!ii
8. Landscape Plan: add plant sizes on the planting legend.
9. Provide a copy of the Landscape plan approvalletter/e-mail from the Urban Forester.
10. Label the path located east of Pond 3.
11. Per the Alternative Transportation Plan, the path along 131'1 St. should be 10-ft wide.
12. Sheet C801: Street details: Show 5-ft concrete sidewalk width and 10-ft path width along 13151 St.
Please submit a revised Secondary Plat with the above-mentioned changes. Once these changes have been made and
comments addressed, please produce a Mylar copy for signature by this Department. Two paper copies of the plat
must be filed with the Mylar prior to recording, and three paper copies and a Mylar of the recorded plat must be
submitted following recording. Our approval of the secondary plat (signature) will be forthcoming upon revision of
the plans according to the items listed above.
Also, the staff has been advised that we cannot present a Secondary Plat to the Director for signature from this point
forward until Terry Krueskamp in Information Systems has received an e-mail with an electronic file attached
(MicroStation .dgn is preferred, or AutoCad .dwg of the subdivision) and it (thee-mail) has been copied to Matt
Griffm and myself. Their e-mail addresses are: tkmeskamp@ci cannel in us and meriftin@ci carmel in liS . If you
have any questions or if I may be of assistance, please feel free to call.
. Sincerely,
Angelina Conn
Planning Administrator
file: VillageofWestClay,Sec 100 12-SP I
Page 1
ONE CIVIC SQUARE
CARMEL, INDIANA 46032
317/571-2417
Construction/Stormwater Pollution Prevention Plan
Technical Review and Comment (Form 1)
Project Name: Village of West Clay Sec. 10012 "I
Plan Submittal Date: 12/01/04 Hydrologic Unit Code:
Project Location Description: Village of West Clay, 131st and Towne Roads 20 ac
Latitude and Longitude: Not provided
Civil
County: Hamilton
5120201090060
=
=
~ Project Owner Name: Brenwick Development
E Contact: Kevin Kru1ik
= .
'E Address: 12821 E. New Market Street, SUlte 200
...
"t City: Carmel State: IN
.~ Phone: 317-547-3400 FAX:
=
J.
~
18N
3E
Zip: 46032
E-Mail:
Plan Preparer Name: Brandon Burke
Affiliation: Schneider Corporation
Address: 12821 E. New Market Street, Suite 100
City: Carmel State: IN
Phone: 317-569-8112 FAX: 317-826-6410
Zip: 46032
E-Mail: BBURKE@schneidercorp.com
Review Date: 12/14/04
:: Principal Plan Reviewer: John B. South P.E. CPESC
.~ Agency: Hamilton County Soil and Water Conservation District
~
~ Address: 11 08 South 9th Street
; City: Noblesville
~ Phone: 317-773-2181
Assisted By:
FAX:
State: IN
317-776-1101
Zip: 46060
E-Mail: john-south@iaswcd.org
PLAN IS ADEQUATE: A comprehensive plan review has been completed and it has been determined that the
plan satisfies the minimum requirements and intent of 327 lAC 15-5.
o Please refer to additional information included on the following page(s).
o Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana
Department of Environmental Management. Construction activities may begin 48 hours following the submittal of
the NO!. A NOI must also be sent to the SWCD,
o A preliminary plan review has been completed; a comprehensive review will not be completed within the 28-day
review period. The reviewing authority reserves the right to perform a comprehensive review at a later date and
revisions to the plan may be required at that time to address deficiencies.
o Please refer to additional information included on the following page(s).
o Submit Notice of Intent (NO I): Attach a copy of this cover page when submitting the NOI to the Indiana
Department of Environmental Management. Construction activities may begin 48 hours following the submittal of
the NO!. A NOI must also be sent to the
o PI.AN IS DEFICIENT: Significant deficiencies were identified during the plan review.
o Please refer to additional information included on the following page(s).
o DO NOT file a Notice of Intent for this project.
o DO NOT commence land disturbing activities until all deficiencies are adequately addressed, the plan re-
submitted, and notification has been received that the minimum requirements have been satisfied.
should be mailed or delivered to the Principal Plan Reviewer identified
in the Plan Review Section above.
DNR, Division of Soil Conservation
Page 1 of 1
Revised 12/09/03, Form 1
o
~~
Schneider
o
Jon Dobosiewicz
Department of Community Services
One Civic Square
Carmel, IN 46032
November 30, 2004
RE: Vll...LAGE OF WESTCLAY, SECTION 10012
Dear Jon,
Please fmd enclosed the following materials related to the above referenced project:
1. 2 sets of the Secondary Plat and Site Construction Plans
2. Secondary Plat Application
3. Land Description
4. Subdivider Agreement
5. Sewer Report
6. Copies ofletters to TAC members
The above referenced materials are for your review and suggestions with respect to Secondary Platting. It
is my understanding that this matter will be on the agenda of the December 15, 2004 Technical Advisory
Committee meeting. In the interim, if you should have any questions, or are in need of additional
information, please feel free to contact me at your convenience.
Sincerely,
THE SCHNEIDER CORPORATION
Ib-~ ~"--
Brandon T. Burke, P.E.
Project Manager
Enclosure
N :\1238\IOI2\docs\dobosiewiczll-30-04.doc
~
THE SCHNEIDER CORPORATION
12821 E. New Market Street Suite 100 Carmel, Indiana 46032 317-569-8112 Fax 317-826-6410
www.schneidercorp.com
/~
.-),
.
Q
o
R ort on Water Distribution, Sani
Sewer and Storm Sewer S st
VILLAGE OF WEST CLAY -10012
1. Water Distribution
The potable water to the site will be provided by the City of Carmel Utilities.
be made at the following location:
. An 8" water main will be extended from an existing 20" water main located on the south s
Street.
.
Approval for the extension of water mains will be required from the Indiana Department of Environmental
Management, and all mains will be designed and installed in accordance with the City of Carmel Utility's rules and
regulations.
2. Sanitary Sewer
Sanitary sewer effluent for the site will be accepted by the Clay Township Regional Waste District (CTRWD). A lift
station is proposed along the Eastern boundary of the site which will pump effluent via a force main into the existing
18" interceptor located in Springmill Road.
Two additional lift stations are proposed within the Village of West Clay to serve areas which cannot be served by
gravity sewers. One will be placed within the common area located along Hoover Road, South of the Claridge Farm
entrance. It will serve the Southern third of the project, and will pump North into the gravity system described
above. The station is temporary in nature, and will be taken off line upon extension of the interceptor proposed to
the South and East shown in the CTRWD's master plan.
The second station is also temporary, and is located along the project's Westernmost boundary near l26th Street.
The station will also pump to the gravity sewers to the East, and it serves the portion of the project located West of
Towne Road.
Proposed Section 10012 will connect to an existing 8" main located within the section that was constructed by
Towne Point Subdivision. The 8" main will be branched off to service future sections of West Clay.
Approvals for the design and construction of the sanitary sewers must also be obtained, from CTRWD, it's
consultant and from the Indiana Department of Environmental Management.
3. Storm Sewer
The surface runoff on the site will be conveyed by a system of swales and pipes to a network of retention lakes
within the Village of West Clay. In accordance with the requirements of the Hamilton County Surveyor's
requirements, the retention lakes will provide storm water management control in order to restrict the discharge rates
onto the site's various outfall points. The discharge points for the site are as follows:
. Elliot Creek; which traverses the site along the Northern third, then crosses 131 st Street and leaves the site
just East of the existing 8.5 acre lake on the Perez parcel.
. Claridge Farms Legal Drain; which was sized per the County Surveyor's calculations, to accept a 146 acre
drainage area that lies within the boundary of the Village ofWestClay. Connection onto the Claridge Farm
drain will be made at an existing 36" concrete pipe just South of the existing mound bordering the Perez
property, and will address drainage problems evident at that location.
. Clay Creek; Which traverses the site along the Southern third, then crosses Hoover Road near the proposed
common area South of Claridge Farm entrance.
. Brendle Legal Drain; which flows along the site's Western boundary, then crossed l26th Street West of
N:\ 1238\1 0 12\docs\sewreprt.doc
.. :"-
Q
o
Towne Road.
The connection point for the proposed section 5002 is to an existing pond built with existing Section 5003 as well as
existing storm sewer in Sections 5003 and 5001.
It is the intent that all main storm sewer lines and all lines interconnecting lakes and serving as outlet points be
petitioned to be accepted by the County Surveyor as regulated drains. A limited portion of the storm sewers that
serve to drain rear and side yards may remain within the maintenance jurisdiction of the project's homeowner's
association; however, most storm sewers and all retention lakes will be maintained by the County Surveyor.
Subsurface drains, or pavement base drains, are proposed to be installed under the street curbs, in order to provide an
outlet point to home sump pumps, and in order to intercept groundwater seepage before reaching and compromising
the pavement stability.
4. Erosion Control
During all phases of the construction the Site General Contractor and all Subcontractors shall exercise measures to
prevent the erosion of soils due to the action of water and wind. All erosion and sediment control measures shall be
implemented prior to earth moving activities.
Sediment in run-off water shall be trapped by the use of such methods as debris basins, siltation sumps and silt
fences until the disturbed area is stabilized. These shall be in place before any land alterations/grading.
Trapping devices shall be periodically inspected during dry periods and after each rainfall event by the Site
Contractor. Trapping devices shall be replaced if determined to be incapable of performing intended function of
sediment trapping.
The Contractor shall have available on the construction site a water source capable of applying water to dry exposed
soil in order to prevent wind erosion. The application rate and manner shall be such that soil moisture is attained and
no surface run-off is created.
N :\1238\1 0 12\docs\sewreprt.doc
-.....
o
~~
Schneider
~-:....:.
.;;;,
'-
--':r'
November 30, 2004
Gary Hoyt
City of Cannel Fire Department
Two Civic Square
Cannel, IN 46032
RE: VILLAGE OF WEST CLAY - SECTION 10012
Dear Gary:
Please find enclosed one copy of the Title Sheet, Development Plan, Water Distribution Plan and
Secondary Plat for the above referenced project. We will be presenting this project at the
December 15,2004 meeting of the Cannel Technical Advisory Committee. Would you please
review the enclosed material and forward to me, any comments or concerns that you may have.
If you have any questions or require additional information, please feel free to contact me at your
convemence.
Sincerely,
THE SCHNEIDER CORPORATION
~'s
Brandon T. Burke, P.E.
Project Manager
Enclosure
N:\1238\1012\docs\tacsubll-30-04.doc
~
THE SCHNEIDER CORPORATION
12821 E. New Market Street Suite 100 Carmel, Indiana 46032 317-569-8112 Fax 317-826-6410
www.schneidercorp.com
'-
-'
(,)
~~
Schneider
o
November 30, 2004
Bill Akers
CarmeVClay Communications
31 First Avenue, N.W.
Carmel, IN 46032
RE: VILLAGE OF WEST CLAY - SECTION 10012
Dear Bill:
Please find enclosed one copy of the Title Sheet, Development Plan and Secondary Plat for the
above referenced project. We will be presenting this project at the December 15,2004 meeting
of the Carmel Technical Advisory Committee. Would you please review the enclosed material
and forward to me, any comments or concerns that you may have.
If you have any questions or require additional information, please feel free to contact me at your
convemence.
Sincerely,
THE SCHNEIDER CORPORATION
~,s
~-
Brandon T. Burke, P.E.
Project Manager
Enclosure
N:\1238\IOI2\docs\tacsubll-30-04.doc
~
THE SCHNEIDER CORPORATION
12821 E. New Market Street Suite 100 Carmel. Indiana 46032 317-569-8112 Fax 317-826-6410
www.schneidercorp.com
,l'
.."
Q
~~
Schneider
o
November 30, 2004
Ron Farrand
Carmel/Clay Schools
5201 East 131 st Street
Carmel, IN 46033
RE: VILLAGE OF WEST CLAY - SECTION 10012
Dear Ron:
Please find enclosed one copy of the Title Sheet, Development Plan and Secondary Plat for the
above referenced project. We will be presenting this project at the December 15,2004 meeting
of the Carmel Technical Advisory Committee. Would you please review the enclosed material
and forward to me, any comments or concerns that you may have.
If you have any questions or require additional information, please feel free to contact me at your
convenience.
Sincerely,
THE SCHNEIDER CORPORATION
~~
-- '- ~~ '-----
Brandon T. Burke, P.R
Project Manager
Enclosure
N:\1238\1012\docs\tacsuhll-30-04.doc
~
THE SCHNEIDER CORPORATION
12821 E. New Market Street Suite 100 Carmel, Indiana 46032 317-569-8112 Fax 317.826.6410
www.schneidercorp.com
..
1;....
o
~~
Schneider
o
November 30, 2004
L. Joe Cook
Hamilton County Sherifi's Department
18100 Cumberland Road
Noblesville, IN 46060
RE: VILLAGE OF WEST CLAY - SECTION 10012
Dear Joe:
Please find enclosed one copy of the Title Sheet, Development Plan and Secondary Plat for the
above referenced project. We will be presenting this project at the December 15,2004 meeting
of the Carmel Technical Advisory Committee. Would you please review the enclosed material
and forward to me, any comments or concerns that you may have.
If you have any questions or require additional information, please feel free to contact me at your
convernence.
Sincerely,
THE SCHNEIDER CORPORATION
f"J- '6- "---
Brandon T. Burke, P.E.
Project Manager
Enclosure
N:\1238\1O 12\docs\tacsub 11-30-04.doc
~
THE SCHNEIDER CORPORATION
12821 E. New Market Street Suite 100 Carmel, Indiana 46032 317-569-8112 Fax 317-826-6410
www.schneidercorp.com
i;;"
o
~~
Schneider
o
November 30, 2004
Candy Feltner
Clay Township Regional Waste District
10701 North College Avenue, Suite A
Indianapolis, IN 46280
RE: VILLAGE OF WEST CLAY - SECTION 10012
Dear Candy:
Please find enclosed one set of the site Construction Plans and Secondary Plat for the above
referenced project. We will be presenting this project at the December 15, 2004 meeting of the
Carmel Technical Advisory Committee. Would you please review the enclosed material and
forward to me, any comments or concerns that you may have.
If you have any questions or require additional information, please feel free to contact me at your
convemence.
Sincerely,
THE SCHNEIDER CORPORATION
~f~
'-c~
------ ,.~- --
Brandon T. Burke, P .E.
Project Manager
Cc: Ron Lauritsen - CTE Engineers (including enclosure)
Enclosure
N:\1238\1012\docs\tacsubll-30-04.doc
~
THE SCHNEIDER CORPORATION
12821 E. New Market Street Suite 100 Carmel, Indiana 46032 317-569-8112 Fax 317-826-6410
www.schneidercorp.com
w
~~
Schneider
o
November 30, 2004
Ron Lauritsen, P .E.
CTE Engineering, Inc.
7102 Lakeview Parkway West Drive
Indianapolis, IN 46268
RE: VILLAGE OF WEST CLAY - SECTION 10012
Dear Ron:
Please find enclosed one set of the site Construction Plans and Secondary Plat for the above
referenced project. We will be presenting this project at the Decetn,ber 15, 2004 meeting ofthe
Carmel Technical Advisory Committee. Would you please review the enclosed material and
forward to me, any comments or concerns that you may have.
If you have any questions or require additional information, please feel free to contact me at your
convemence.
Sincerely,
THE SCHNEIDER CORPORATION
~~
-- 7- ,.
Brandon T. Burke, P .E.
Project Manager
Cc: Candy Feltner - CTRWD (including enclosure)
Enclosure
N:\1238\1012\docs\tacsubll-30-04.doc
~
THE SCHNEIDER CORPORATION
12821 E. New Market Street Suite 100 Carmel, Indiana 46032 317-569-8112 Fax 317-826-6410
www.schneidercorp.com
o
~.,
Schneider
o
November 30t 2004
John Lester
CarmeVClay Parks Department
1055 3rd Ave. S.W.
Carmelt IN 46032
RE: VILLAGE OF WEST CLAY - SECTION 10012
Dear John:
Please find enclosed one copy of the Title Sheett Development Plan and Secondary Plat for the
above referenced project. We will be presenting this project at the December 1St 2004 meeting
of the Carmel Technical Advisory Committee. Would you please review the enclosed material
and forward to met any comments or concerns that you may have.
If you have any questions or require additional informationt please feel free to contact me at your
convenience.
SincerelYt
THE SCHNEIDER CORPORATION
~ ~'---
Brandon T. Burket P .E.
Project Manager
Enclosure
N:\1238\1 0 12\docs\tacsub 11-30-04.doc
~
THE SCHNEIDER CORPORATION
12821 E. New Market Street Suite 100 Carmel, Indiana 46032 317-569-8112 Fax 317-826-6410
www.schneidercorp.com
o
~~
Schneider
o
November 30, 2004
Shirley Hunter
Cinergy
1441 South Guilford
Carmel, IN 46032
RE: VILLAGE OF WEST CLAY - SECTION 10012
Dear Shirley:
Please find enclosed one copy of the Title Sheet, Development Plan and Secondary Plat for the
above referenced project. We will be presenting this project at the December 15, 2004 meeting
of the Carmel Technical Advisory Committee. Would you please review the enclosed material
and forward to me, any comments or concerns that you may have.
If you have any questions or require additional information, please feel free to contact me at your
convenience.
Sincerely,
THE SCHNEIDER CORPORATION
~-~
Brandon T. Burke, P.E.
Project Manager
Enclosure
N:\1238\IOI2\docs\tacsubll-30-04.doc
~
THE SCHNEIDER CORPORATION
12821 E. New Market Street Suite 100 Carmel, Indiana 46032 317-569-8112 Fax 317-826-6410
www.schneidercorp.com
o
~~
Schneider
o
November 30, 2004
Steve Krebs
SBC
5858 North College Avenue
Indianapolis, IN 46220
RE: VILLAGE OF WEST CLAY - SECTION 10012
Dear Steve:
Please find enclosed one copy of the Title Sheet, Development Plan and Secondary Plat for the
above referenced project. We will be presenting this project at the December 15,2004 meeting
of the Carmel Technical Advisory Committee. Would you please review the enclosed material
and forward to me, any comments or concerns that you may have.
If you have any questions or require additional information, please feel free to contact me at your
convemence.
Sincerely,
THE SCHNEIDER CORPORATION
~~'--
Brandon T. Burke, P.E.
Project Manager
Enclosure
N:\1238\IOI2\docs\tacsubll-30-04.doc
~
THE SCHNEIDER CORPORATION
12821 E. New Market Street Suite 100 Carmel, Indiana 46032 317-569-8112 Fax 317-826-6410
www.schneidercorp.com
Q
~~
Schneider
o
November 30, 2004
Greg Hoyes
Hamilton County Surveyor's Office
One Hamilton County Square, Suite 188
Noblesville, IN 46060
RE: VILLAGE OF WEST CLAY - SECTION 10012
Dear Greg:
Please find enclosed one set of the site Construction Plans and Secondary Plat for the above
referenced project. A Drainage Report including Overall drainage design will be forwarded to
you shortly. We will be presenting this project at the December 15,2004 meeting of the Carmel
Technical Advisory Committee. Would you please review the enclosed material and forward to
me, any comments or concerns that you may have.
If you have any questions or require additional information, please feel free to contact me at your
convenience.
Sincerely,
THE SCHNEIDER CORPORATION
~ ~"--
Brandon T. Burke, P.E.
Project Manager
Enclosure
N:\1238\1012\docs\tacsubll-30-04.doc
~
THE SCHNEIDER CORPORATION
12821 E. New Market Street Suite 100 Carmel, Indiana 46032 317-569-8112 Fax 317 -826-6410
www.schneidercorp.com
o
~~
Schneider
o
November 30, 2004
Teresa Magee
Panhandle Eastern Pipe Line Company
9371 Zionsville Road
Indianapolis, IN 46268
RE: VILLAGE OF WEST CLAY - SECTION 10012
Dear Teresa:
Please find enclosed one copy of the Title Sheet, Development Plan and Secondary Plat for the
above referenced project. We will be presenting this project at the December 15,2004 meeting
of the Carmel Technical Advisory Committee. Would you please review the enclosed material
and forward to me, any comments or concerns that you may have.
If you have any questions or require additional information, please feel free to contact me at your
convenience.
Sincerely,
THE SCHNEIDER CORPORATION
~Lb-
-- ~-'---
Brandon T. Burke, P .E.
Project Manager
Enclosure
N:\1238\1012\docs\tacsubll-30-04.doc
~
THE SCHNEIDER CORPORATION
12821 E. New Market Street Suite 100 Carmel, Indiana 46032 317-569-8112 Fax 317-826-6410
www.schneidercorp.com
o
~.,
Schneider
o
November 30, 2004
John South, P.E.
Hamilton County Soil & Water Conservation District
1108 South 9th Street
Noblesville,lN 46060
RE: VILLAGE OF WEST CLAY - SECTION 10012
Dear John:
Please find enclosed one set of the site Construction Plans, Secondary Plat, BMP Manual, and
l1x17 exhibit for the above referenced project. We will be presenting this project at the
December 15, 2004 meeting of the Carmel Technical Advisory Committee. Would you please
review the enclosed material and forward to me, any comments or concerns that you may have.
If you have any questions or require additional information, please feel free to contact me at your
convenience.
Sincerely,
THE SCHNEIDER CORPORATION
~ ~-"-
Brandon T. Burke, P.E.
Project Manager
Enclosure
N:\1238\1012\docs\tacsubll-30-04.doc
~
THE SCHNEIDER CORPORATION
12821 E. New Market Street Suite 100 Carmel, Indiana 46032 317-569-8112 Fax 317-826-6410
www.schneidercorp.com
o
~~
Schneider
o
November 30, 2004
Jeff Kendall
City of Cannel
One Civic Square
Cannel, IN 46032
RE: VILLAGE OF WEST CLAY - SECTION 10012
Dear Jeff:
Please find enclosed one copy of the Title Sheet, Development Plan and Secondary Plat for the
above referenced project. We will be presenting this project at the December 15, 2004 meeting
of the Cannel Technical Advisory Committee. Would you please review the enclosed material
and forward to me, any comments or concerns that you may have.
If you have any questions or require additional information, please feel free to contact me at your
convenience.
Sincerely,
THE SCHNEIDER CORPORATION
IS--- ~ --'--
Brandon T. Burke, P .E.
Project Manager
Enclosure
N:\1238\1012\docs\tacsubll-30-04.doc
~
THE SCHNEIDER CORPORATION
12821 E. New Market Street Suite 100 Carmel, Indiana 46032 317-569-8112 Fax 317-826-6410
www.schneidercorp.com
o
~~
Schneider
o
November 30, 2004
Jason Lemaster
Hamilton County Health Dept.
Hamilton County Judicial Center, Suite 30
Noblesville, IN 46060
RE: VILLAGE OF WEST CLAY - SECTION 10012
Dear Jason:
Please find enclosed one copy of the Title Sheet, Development Plan and Secondary Plat for the
above referenced project. We will be presenting this project at the December 15, 2004 meeting
of the Carmel Technical Advisory Committee. Would you please review the enclosed material
and forward to me, any comments or concerns that you may have.
If you have any questions or require additional information, please feel free to contact me at your
convemence.
Sincerely,
THE SCHNEIDER CORPORATION
<;/J -
J :::s
-~
~
Brandon T. Burke, P.E.
Project Manager
Enclosure
N:\1238\1012\docs\tacsubll-30-04.doc
~
THE SCHNEIDER CORPORATION
12821 E. New Market Street Suite 100 Carmel, Indiana 46032 317-569-8112 Fax 317-826-6410
www.schneidercorp.com
o
~~
Schneider
o
November 30, 2004
Scott Brewer
Department of Community Services
One Civic Square
Cannel, IN 46032
RE: VILLAGE OF WEST CLAY - SECTION 10012
Dear Scott:
Please find enclosed one copy of the Landscape Plan, Title Sheet, Development Plan, and
Secondary Plat for the above referenced project. We will be presenting this project at the-
December 15,2004 meeting of the Cannel Technical Advisory Committee. Would you please
review the enclosed material and forward to me, any comments or concerns that you may have.
If you have any questions or require additional information, please feel free to contact me at your
convemence.
Sincerely,
THE SCHNEIDER CORPORATION
11- "- ~ '-
Brandon T. Burke, P .E.
Project Manager
Enclosure
N:\1238\1012\docs\tacsubll-30-04.doc
~
THE SCHNEIDER CORPORATION
12821 E_ New Market Street Suite 100 Carmel, Indiana 46032 317-569-8112 Fax 317-826-6410
www.schneidercorp.com
o
~~
Schneider
Q
November 30, 2004
Gary Duncan, Jr.
City Engineer Office
One Civic Square
Carmel, IN 46032
RE: VILLAGE OF WEST CLAY - SECTION 10012
Dear Gary:
Please find enclosed two (2) sets of the site Construction Plans and Secondary Plat. I shall
forward two (2) drainage calculations shortly for the above referenced project. We will be
presenting this project at the December 15, 2004 meeting of the Carmel Technical Advisory
Committee. Would you please review the enclosed material and forward to me, any comments
or concerns that you may have.
If you have any questions or require additional information, please feel free to contact me at your
convenience.
Sincerely,
THE SCHNEIDER CORPORATION
~ ~-"----
Brandon T. Burke, P.E.
Project Manager
Enclosure
N:\1238\1 0 12\docs\tacsub 11-30-04.doc
~
THE SCHNEIDER CORPORATION
12821 E. New Market Street Suite 100 Carmel, Indiana 46032 317-569-8112 Fax 317-826-6410
www.schneidercorp.com
7
o
~~
Schneider
o
November 30, 2004
Jason Kirkman
Brighthouse Networks
3030 Roosevelt Ave
Indianapolis, IN 46218
RE: VILLAGE OF WEST CLAY - SECTION 10012
Dear Jason:
Please find enclosed one copy of the site Title Sheet, Development Plan and Secondary Plat for
the above referenced project. We will be presenting this project at the December 15, 2004
meeting of the Carmel Technical Advisory Committee. Would you please review the enclosed
material and forward to me, any comments or concerns that you may have.
If you have any questions or require additional information, please feel free to contact me at your
convemence.
Sincerely,
THE SCHNEIDER CORPORATION
~ ~"--
Brandon T. Burke, P .E.
Project Manager
Enclosure
N:\1238\1012\docs\tacsubll-30-04.doc
~
THE SCHNEIDER CORPORATION
12821 E. New Market Street Suite 100 Carmel, Indiana 46032 317-569-8112 Fax 317-826-6410
www.schneidercorp.com
7
u
~~
Schneider
Q
November 30, 2004
Jerry Breeck
Vectren Energy
16000 Allisonville Rd
P.O. Box 1700
Noblesville, IN 46060
RE: VILLAGE OF WEST CLAY - SECTION 10012
Dear Jerry:
Please find enclosed one copy of the site Title Sheet, Development Plan and Secondary Plat for
the above referenced project. We will be presenting this project at the December 15,2004
meeting of the Carmel Technical Advisory Committee. Would you please review the enclosed
material and forward to me, any comments or concerns that you may have.
If you have any questions or require additional information, please feel free to contact me at your
convenience.
Sincerely,
THE SCHNEIDER CORPORATION
~
~-
-.
Brandon T. Burke, P .E.
Project Manager
Enclosure
N:\1238\IOI2\docs\tacsubll-30-04.doc
~
THE SCHNEIDER CORPORATION
12821 E. New Market Street Suite 100 Carmel. Indiana 46032 317-569-8112 Fax 317-826-6410
www.schneidercorp.com
/-
'-r' \1
~
u
~~
Schneider
u
November 30, 2004
John Duffy
City of Carmel Utilities
One Civic Square
Carmel, IN 46032
RE: VILLAGE OF WEST CLAY - SECTION 10012
Dear John:
Please find enclosed one set of the site Construction Plans and Secondary Plat for the above
referenced project. We will be presenting this project at the December 15, 2004 meeting of the
Carmel Technical Advisory Committee. Would you please review the enclosed material and
forward to me, any comments or concerns that you may have.
- Also included is the IDEM NOI - Notice of Intent to Construct a Water Main Extension.
Please review, fill out appropriate sections, sign, and return to me. I will complete the required
signatures and submit to IDEM along with the required fee.
If you have any questions or require additional information, please feel free to contact me at your
convenience.
Sincerely,
THE SCHNEIDER CORPORATION
-/~
-~ ------
Brandon T. Burke, P.E.
Project Manager
Enclosure
,
,
N:\1238\1012\docs\tacsubll-30-04.doc
~
\
THE SCHNEIDER CORPORATION
12821 E. New Market Street Suite 100 Carmel, Indiana 46032 317-569-8112 Fax 317-826-6410
www.schneidercorp.com