Loading...
HomeMy WebLinkAboutDevelopment Plan .' o Q Grandin Hall, Section 1 DEVELOPMENT REPORT Submitted by: Estridge Development Co. Inc. 1041 West Main Street Carmel, IN 46032 (317) 582-2456 Prepared for: CARMEL DOCS Prepared by: The Schneider Corporation Historic Fort Harrison 8901 Otis Ave. Indianapolis, IN 46216 (317) 826-7306 August 2005 o TABLE OF CONTENTS Development Report A. Aerial Photograph B. Area Map C. Site Map D. Soils Map E. Site Narrative E. Water Service F. Sanitary Sewer Service G. Storm Drainage H. Soils u ---.. --' <( C91- "'-ZZ ,-W (f)ZO o_ N if) W 0:::: '-----' NOBLESVILLE SR~NING U (RESIDENTIAL) (CHURCH) 146 TH STREET "U cr:: - (J) ~ , I ield Dr -~~ I Saem Drve '- ~ o ~ Avian Way o .~ > <( Warbler Way No AREA MAP SCALE: 1v=500' u U 146TH STREET COMMON AREA C . 5 6 12 13 20 4 7 11 14 18 21 <!: 3 w 15 0:::: 8 9 10 16 17 22 <!: :z 2 0 ~ GRANDIN HALl ClRClf 23 ~ 0 u 1 I 45 44 43 24 COMMON AREA "E" I 40 41 25 -N, I GRANDIN HALl ORClf i= 37 36 ~ 30 29 28 z ~ ~ ~ => 0 a> ~ 31 (... 35 c 0 ~ I LAKE #1 RANDOlPH CRESCENT 32 . I COMMON AREA "F" J DRIvt: 34 33 "- COD 000 000 SITE MAP SCALE= 1"=200' ,- u u 146TH STREET t\ r-.. SOILS MAP SCALE: 1"=500' ~. J- u u E. Site Narrative Grandin Hall, Section 1 is the first of two sections of this proposed development in Clay Township that will feature Estridge's new 800 home series. Extensive entryway landscaping and a central gather space highlight the project. The site is located on the South side of 146th Street, West of Hazel Dell Road. This section contains 32.882 acres of the 39 acre site. The property is zoned S-1 and the project will be developed using the Carmel Open Space Ordinance. F. Water Service Water for the project will be supplied by the City of Carmel. Water mains serving the project will be extended from the existing 8" main in the street stub south of the site and the 12" water main on the south side of 146th Street. G. Sanitary Sewer Service The sanitary sewer service will be provided by City of Carmel. The sewers in Grandin Hall will be extended from the existing 8" sewer line in the street stub south of the project. All sewer mains through the project will be 8" PVC pipe. H. Storm Drainage The storm water runoff will be collected in storm sewers and routed to a large lake at the southeast comer of the site. Storm water will discharge from the new lake through an 18" off site storm sewer and connect to an existing 36" storm sewer in the Ashton Subdivision. The existing 36" storm sewer was constructed specifically to accept the runoff from this site and route it to the detention pond in Ashton. The storm water eventually reaches the Freemont Randall regulated drain. I. Soils Soil types found on the site are primarily Brookston-Crosby soils with some areas of Miami soils Miami soils are typically deep well-drained soils, while Brookston- Crosby soils are generally deep and somewhat poorly drained.