Loading...
HomeMy WebLinkAboutCorrespondence u u rU60~OOTtt...- ] L-' .", CI EL .<\ -, ~ / ./ ts ~ECE\\ItD ~1 '\ DOGS October 5, 2005 JAMES BRAINARD, MAYOR , ".. ~ " ",-.) > '--....1 ~~, Mr. J. Cort Crosby, PE The Schneider Corporation Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 /: :::~~ "/; } 'c,-Jl RE: Grandin Hall, Section l(formerly Runyon Hall) Construction Plans-'Project Review #2 Dear Mr. Crosby: The City has received your comment letter and drawings dated September 19, 2005 based upon the City review of August 15,2005. The comments from the City review have been satisfactorily addressed with the following exceptions: PROJECT COMMENTS-CONSTRUCTION PLANS 12. ADA ramps are required at all locations where the sidewalks or asphalt paths cross the streets. Still did not find anything indicating ADA ramps. Please explain how these are designated and on which sheets they are shown. 14. Please remove Sheets LlOI-Ll04 and Sheets L201-L203 from the sets submitted to the Department of Engineering for approval. The Department of Engineering does not approve these sheets. Please be sure to also remove these items from the index on the title sheet. Repeat this comment. The Department of Engineering does not approve the landscap~ plan and if they are attached to what is approved by this office, approval of the plan will be inferred. 16. On street plan-profile sheets, please delete any backfill general notes. The details should be revised to incorporate the City's backfill specification. Also, please add City of Carmel standard minimum cover note to each sheet. Please add current City of Carmel standard minimum cover requirements - see attached copy. . .. 21. Please add the City of Carmel standard backfill requirement and standard minimum cover requirements for the installation of these utilities under City streets to the water and sanitary plan sheets, or to the appropriate details on the Detail sheets and delete all generic granular backfill references on these sheets. Please add current City of Carmel standard minimum cover requirements. 22. Please add the City of Carmel standard backfill requirement and minimum cover requirements for the installation of storm sewers under City streets to the storm sewer plan-profile sheets, or to the appropriate details on the Detail sheets and delete all generic granular backfill references on these sheets. Please revise to include the current minimum cover requirements. Based upon additional review, the City provides additional comment: 1. Please add the following note to the subsurface drain detail "THE PIPE FOR ALL SUBSURFACE DRAIN IS TO BE DOUBLE WALL HANCOR HI-Q OR EQUIVALENT." These comments represent the Department of Engineering's second review of the construction plans for this project. We request that all responses to our comments be provided in writing. Failure to provide written responses may result in the delay of the review process. DEPARTMENT OF ENGINEERING ONE CMC SQUARE, CARMEL, IN 46032 OFFICE 317.571.2441 FAX 317.571.2439 ErvWL engineering@ci.carmel.in.us '1, 00 u u It is critical that our office be made aware of all modifications made on the plans being resubmitted, particularly if any such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans including all revisions. Please notify us of any changes and specifically state any changes, including changes resulting from Plan Commission, BZA or other committee meetings. All bonds and performance guarantees must be posted prior to Engineering Department approval of construction plans. Also, Board of Public Works and Safety approvals and any other governing agency approvals (if required) must be obtained prior to Engineering Department approval. The Department reserves the right to provide additional comments based on subsequent reviews. If you have questions, please call me at 571-2441. cc: Matt Griffin, Department of Community Services John Duffy, Carmel Utilities Paul Pace, Carmel Utilities Paul Arnone, Carmel Utilities Craig Kunkle, Estridge Development Company, Inc. Greg Hoyes, Hamilton County Surveyor's Office John South, Hamilton County Soil & Water Mike McBride, Hamilton County Highway Department Project File Engineering Department Review S:\DHILL\PROJREY05\GRANDlNHALLI #2 ~~ Schneider u 0 The Schneider Corporation INDIANA Corporate Headquarters Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216 Phone: 317,826.7100 Toll.Free: 866.973.7100 Fax: 317.826.7200 Lafayette Office 3725 Rome Drive Park 26 Lafayette, IN 47905 Phone: 765.448.6661 Fax: 765.448.6665 Carmel Office 12821 E New Market Street Suite 100 Carmel, IN 46032 Phone: 317.569.8112 Fax: 317.826.6410 Avon Office Building 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Phone: 317.745.9926 Fax: 317.745.9973 Merrillville Office 9800 Connecticut Drive Suite Bl-508 Merrillville, IN 46307 Phone: 219.644.3692 Fax: 219.644.3682 NORTH CAROLINA Charlotte Office 2151 Hawkins Street Suite 201 Charlotte, NC 28203 Phone: 704.333.8360 Fax: 704.333.8362 IOWA ProMap Office 1531 Airport Road Suite 2 Ames, IA 50010 Phone: 515.233.3311 Fax: 515.233.4575 Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216.1037 Phone: 317.826.7100 Fax: 317,826.7200 September 16, 2005 Angelina Conn Carmel DOCS One Civic Square Carmel, IN 46060 RE: Grandin Hall, Section 1 Secondary Plat and Construction Plans TSC Job # 5075.001 Dear Angelina, "..<'~-:-' f:" \ tJ:~ _LJ.i2(/~ ,,<'\. }. A -.J~, ;:~ry, ,'" ~~<)\ (" RECE\VEO \~,,\\ ( , \ \ SEP , 9 'l00S r~-,'J' \' It"" ",.c \ DOCS t-:':C) \/'\ '-../ I. /.,' 'K> / . <\~,", "P/ \.,,~ "-'7 ',,,: I I I; ';;r I(-{(\ "..- '~LJJ~~~~ The Secondary Plat and Construction Plans for Grandin Hall, Section 1 have been revised according to the review TAC comments. The revisions and responses corresponding to your comments are as follows: Plat 1. The docket number has been added to the plat. 2. The flood statement has been added to sheet 3 of the plat. 3. The covenants need recorded before that number is available to inset and usually done in the same process. The survey will be recorded and the number inserted prior to the mylars being prepared for signatures. 4. The zoning and set back information has been added to sheet 2 of the plat. 5. The Right-of-way has now been labeled. 6. Any signage will be permitted as required. Please approve these plans or call me if you have any questions. Sincerely, Jrt fy P.E. Project Engineer R:\5k\5075\001 \docs\DOCSconn091405.doc www.schneldercorp.com .: l "70 ~~ Schneider ., INDIANA Corporate Headquarters Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216 Phone: 317.826.7100 Toll.Free: 866.973.7100 Fax: 317.826.7200 Lafayette Office 3725 Rome Drive Park 26 Lafayette, IN 47905 Phone: 765.448.6661 Fax: 765.448.6665 Carmel Office 12821 E New Market Street Suite 100 Carmel, IN 46032 Phone: 317.569.8112 Fax: 317.826.6410 Avon Office Building 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Phone: 317.745.9926 Fax: 317.745.9973 Merrillville Office 9800 Connecticut Drive Suite Bl.508 Merrillville, IN 46307 Phone: 219.644.3692 Fax: 219.644.3682 NORTH CAROLINA Charlotte Office 2151 Hawkins Street Suite 201 Charlotte, NC 28203 Phone: 704.333.8360 Fax: 704.333.8362 IOWA ProMap Office 1531 Airport Road Suite 2 Ames, IA 50010 Phone: 515.233.3311 Fax: 515.233.4575 u 0 The Schneider Corporation Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216--1037 Phone: 317.826.7100 Fax: 317.826.7200 September 16, 2005 /'~;~~-~~- '( ~--: ~ A'\\">;''- 1-,-:.,. '. /. ~~,r~)'" ~ -~"'\~'\ f '. ," (-1' RECE\\JED . '\~\ \ \, 'St~ , 9 2005 J~~,! \~ . DOCS 0:;':/ \("~" .' fy ,~ ~\\~ ,~:. ........../ :'~TT'ff!:\/' ...........--:-~,;::..--- Gary Duncan Carmel City Engineer One Civic Square Carmel, IN 46060 RE: Grandin Hall, Section 1 Secondary Plat and Construction Plans TSC Job # 5075.001 Dear Gary, The Secondary Plat and Construction Plans have been revised according to the T AC comments. The revisions and responses corresponding to your comments are as follows: General Information 1. The site will be designed to meet the City of Carmel standards. 2. The jurisdictional requirements of Carmel will be followed as well as the requirements for the Hamilton County Surveyor. 3. Board Works: a. Water and sewer availability has been requested. b. Water availability will be requested for any irrigation system. c. No curb cuts are planned for amenity areas. d. A Consent to Encroach Agreement for anything in the right-of- way will be prepared for approval. e. The Secondary Plat will be approved by the Board of Works. f. No right-of-way dedication other than what will. be shown on the secondary plat is planned. g. The Board of works schedule will be followed for submittals. 4. All comments will be answered in writing and the seven construction sets will be submitted after approval. 5. Any improvements in easements or right"'of-way will be included in a consent to encroach agreement. j" ,.' .'," ;":.' www.schneiderco'rp.comf", u o Gary Duncan September 16, 2005 Page 2 6. Carmel Utilities has been provided with the plans plat for review and their comments will be addressed directly. 7. Carmel utilities will be contacted for waterline locations. 8. I have copies of the procedural information. Bondina Reauirements 9. Bonds will be provided by the developer. Final Engineers Estimates for the improvements have been submitted. The Hamilton County Highway Department will be involved with any improvements on 146th Street. 10. A copy of the revised plans and drainage report has been sent to Crossroads Engineering along with the revisions and response letter to their concerns. Availabilitv and Connection Fees 11. Availability and connection fees will be paid by the developer/builder. Connection fees will be required for irrigation. Proiect Comments - Construction Plans 12. The handicapped ramps are shown. 13. The curve data tables have been copied to the street plans. 14. The landscaping plans are required by Carmel and many TAC members review them for various purposes. Please ignore them if you do not want to see them. 15. The corner lots will fit the homes being designed for this site. 16. The cover note has been added to each street profile. No backfill notes are on the street profiles. 17. The island and lane width dimensions are shown shown on the entrance . plan. The auxiliary lanes on 146th Street have been worked out with the Highway Department. 18. A maintenance of traffic plan has been added to sheet C301. 19. The sign ordinance note has been added. 20. The note has been added to the respective sheets. 21. The backfill requirements have been added to the specifications and details were applicable. 22. Same as 21. 23. The pavement sections have been updated. 24. The sidewalk detail has been replaced. 25. Yes. The entire common area is a platted drainage easement. 26. We agree with your previous letter and will be improving any downstream conditions considerably in all storm events by adding detention and by over detaining the standard amounts required. 27. The details have been revised. w (.) Gary Duncan September 16, 2005 Page 3 Please approve these plans or call me if you have any questions. Sincerely, /1/7 c;JCI J. Cort Crosby P.E. Project Engineer R:\5k\5075\001 \docs\CanneIRedden081605.doc ~~ Schneider INDIANA Corporate Headquarters Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216 Phone: 317.826.7100 Toll-Free: 866.973.7100 Fax: 317.826.7200 Lafayette Office 3725 Rome Drive Park 26 Lafayette, IN 47905 Phone: 765.448.6661 Fax: 765.448.6665 Carmel Office 12821 E New Market Street Suite 100 Carmel, IN 46032 Phone: 317.569.8112 Fax: 317.826.6410 Avon Office Building 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Phone: 317.745.9926 Fax: 317.745.9973 Merrillville Office 9800 Connecticut Drive Suite B1-508 Merrillville, IN 46307 Phone: 219.644.3692 Fax: 219.644.3682 NORTH CAROLINA Charlotte Office 2151 Hawkins Street Suite 201 Charlotte, NC 28203 Phone: 704.333.8360 Fax: 704.333.8362 IOWA ProMap Office 1531 Airport Road Suite 2 Ames, IA 50010 Phone: 515.233.3311 Fax: 515.233.4575 W U The Schneider Corporation Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 Phone: 317.826.7100 Fax: 317.826.7200 September 16, 2005 Greg Hoyes Hamilton County Surveyor One Hamilton County Square, Suite 188 Noblesville, IN 46060 RE: Grandin Hall, Section 1 Secondary Plat and Construction Plans TSC Job # 5075.001 Dear Greg, The Secondary Plat and Construction Plans for Grandin Hall, Section 1 have been revised according to the review T AC comments. The revisions corresponding to your comments are as follows: 1. The project is in Carmel's jurisdiction. 2. Please indicate if any special requirements are needed. 3. The outlet request and fees have been submitted. 4. A copy of the letter from the City Engineer is attached indicating our ability to use the platted drainage easement in install drainage improvements. 5. The landscaping is absent directly over the storm sewers. The nice wide flat area along the north side of the Woodfield lake is the best access area to the outlet and the offsite storm sewer and could also be used to get to the Freemont-Randal Drain that begins at the south end of the Woodfield lake. The legal drain would be best accessed from the streets in Woodfield however. 6. Your comments were provided by email and responded to. 7. The comments from Carmel and Crossroads Engineering will be addressed. 8. Any further comments will be addressed. Please approve these plans or call me if you have any questions. Sincerely, J. ~roSbY P.E Project Engineer R:\5k\5075\OO 1 \docs\HamCoSurvHoyes091605.doc . - -', . ~ '... .www.schneidercorp~com..l.li l ~~ Schneider INDIANA Corporate Headquarters Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216 Phone: 317.826.7100 Toll-Free: 866.973.7100 Fax: 317.826.7200 Lafayette Office 3725 Rome Drive Park 26 Lafayette, IN 47905 Phone: 765.448.6661 Fax: 765.448.6665 Carmel Office 12821 E New Market Street Suite 100 Carmel, IN 46032 Phone: 317.569.8112 Fax: 317.826.6410 Avon Office Building 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Phone: 317.745.9926 Fax: 317.745.9973 Merrillville Office 9800 Connecticut Drive Suite Bl-508 Merrillville, IN 46307 Phone: 219.644.3692 Fax: 219.644.3682 NORTH CAROLINA Charlotte Office 2151 Hawkins Street Suite 201 Charlotte, NC 28203 Phone: 704.333.8360 Fax: 704.333.8362 IOWA ProMap Office 1531 Airport Road Suite 2 Ames, IA 50010 Phone: 515.233.3311 Fax: 515.233.4575 u 0 The Schneider Corporation Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 Phone: 317.826.7100 Fax: 317.826.7200 September 16, 2005 Greg IIko Crossroads Engineers, PC 3417 South Sherman Drive Beach Grove, IN 46107 RE: Grandin Hall, Section 1 Secondary Plat and Construction Plans TSC Job # 5075.001 Dear Greg, The Secondary Plat and Construction Plans for Grandin Hall, Section 1 have been revised according to the review TAC comments. The revisions and responses corresponding to your comments are as follows: 1. Plans have been revised to show the 2-year, 10-year, 1 OO-year and bottom elevation for the lake. 2. The critical elevations have been added to the lake detail as requested. 3. The site is on the south side of 146th Street. The right-at-way tor 146th Street is already full developed with 5 lanes and curb and gutter and the entire R/W is accommodated by storm inlets. 4. The basin areas have been converted to acres. 5. The pipe to Str 120 has been revised in the future section's design. 6. The hydraulic grade lines have been added. 7. Inlet capacity and gutter spread calculations have been added. The requirements are met. 8. Drainage arrows have been added. 9. Elevations at all grade breaks are on the plans and tlow arrows have been added. 10. The project name has been corrected. 11 . The project name has been revised. :,., "-J .... ,'.'.www:schneidercorp.com':1ii u o Greg IIko September 16, 2005 Page 2 12. The storm sewers have been revised to meet the maximum velocity requirement. 13. The note and the flood protection grades have been added. 14. Spot elevations in addition to the previous note have been added to the spillway and the drainage narrative has been revised to include the spillway. 15. Structure 166 is now a beehive inlet. 16. The discrepancies between the report and plans have been corrected. 17. The discrepancies between the inverts in the plans and those in the report have been corrected. 18. The future storm structures are not shown. The inlet spacing for Structures 120 and 121 has been accounted for and the storm sewer spread sheets have been revised. 19. The pipe cover has been corrected in all areas except at structure 101 where we are picking up and existing swale in a homeowner's back yard and can not meet the requirement right at the inlet. The cover is present a few feet away from the inlet. Please approve these plans or call me if you have any questions. Sincerely, [JLC J. Cort Crosby P.E. Project Engineer R:\5k\507 5\001 \docs\Crossroads091605.doc l ~~ Schneider u (;) The Schneider Corporation INDIANA Corporate Headquarters Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216 Phone: 317.826.7100 Toll-Free: 866.973.7100 Fax: 317.826.7200 Lafayette Office 3725 Rome Drive Park 26 Lafayette, IN 47905 Phone: 765.448.6661 Fax: 765.448.6665 Carmel Office 12821 E New Market Street Suite 100 Carmel, IN 46032 Phone: 317.569.8112 Fax: 317.826.6410 Avon Office Building 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Phone: 317.745.9926 Fax: 317.745.9973 Merrillville Office 9800 Connecticut Drive Suite B1-508 Merrillville, IN 46307 Phone: 219.644.3692 Fax: 219.644.3682 NORTH CAROLINA Charlotte Office 2151 Hawkins Street Suite 201 Charlotte, NC 28203 Phone: 704.333.8360 Fax: 704.333.8362 IOWA ProMap Office 1531 Airport Road Suite 2 Ames, IA 50010 Phone: 515.233.3311 Fax: 515.233.4575 Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 Phone: 317.826.7100 Fax: 317.826.7200 September 14, 2005 Gary Hoyt Carmel Fire Department 2 Civic Square Carmel, IN 46032 RE: Grandin Hall, Section 1 Secondary Plat and Construction Plans TSC Job # 5075.001 Dear Gary, The Secondary Plat and Construction Plans for Grandin Hall, Section 1 have been revised according to your T AC comments and the others on the T AC committee. The revisions and responses corresponding to your written comments are as follows: 1. The fire hydrant markers are indicated on sheet C701 and C702 in the construction plans. Please approve these plans or call me if you have any questions. Sincerely, J. ~roSbY P.E. Project Engineer R:\5k\5075\001 \docs\CARMELFIREhoyt091405.doc . . -,', ,.", .:'~ ~1;www.schneidercorp:coinJ7i ~~ Schneider INDIANA Corporate Headquarters Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216 Phone: 317.826.7100 Toll-Free: 866.973.7100 Fax: 317.826.7200 Lafayette Office 3725 Rome Drive Park 26 Lafayette, IN 47905 Phone: 765.448.6661 Fax: 765.448.6665 Carmel Office 12821 E New Market Street Suite 100 Carmel, IN 46032 Phone: 317.569.8112 Fax: 317.826.6410 Avon Office Building 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Phone: 317.745.9926 Fax: 317.745.9973 Merrillville Office 9800 Connecticut Drive Suite Bl-508 Merrillville, IN 46307 Phone: 219.644.3692 Fax: 219.644.3682 NORTH CAROLINA Charlotte Office 2151 Hawkins Street Suite 201 Charlotte, NC 28203 Phone: 704.333.8360 Fax: 704.333.8362 IOWA ProMap Office 1531 Airport Road Suite 2 Ames, IA 50010 Phone: 515.233.3311 Fax: 515.233.4575 U 0 The Schneider Corporation Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 Phone: 317.826.7100 Fax: 317.826.7200 September 14, 2005 Paul Arnone Carmel Utilities 130 1st Avenue SW Carmel, IN 46032 RE: Grandin Hall, Section 1 Secondary Plat and Construction Plans TSC Job # 5075.001 Dear Paul, The secondary plat and construction plans have been revised according to the T AC comments. The revision corresponding to your comments are as follows: 1. Asbuilts will be submitted. 2. The developer will pay for the testing as required. 3. The laterals are located as indicated unless conflicts with other utilities exist. 4. The sand bedding has been added to the detail on C703. 5. The exterior Seal coat is noted on the manholes. 6. "Muller only" note has been added to the general notes. 7. Posicaps are noted. 8. Tracer wire is noted. 9 . Warning tape is noted. 10. The 8" valve is shown for the temporary hydrant. Please approve these plans or call me if you have any questions. Sincerely, J'~SbYP.E. Project Engineer R\5k\5076\OO I \docs\CannUtilArnone091405.doc ; .,~;:{~;~ ""r';-";,~- www.schneidercorp:c6m~iji .' ~~ Schneider INDIANA Corporate Headquarters Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216 Phone: 317.826.7100 Toll-Free: 866.973.7100 Fax: 317.826.7200 Lafayette Office 3725 Rome Drive Park 26 Lafayette, IN 47905 Phone: 765.448.6661 Fax: 765.448.6665 Carmel Office 12821 E New Market Street Suite 100 Carmel, IN 46032 Phone: 317.569.8112 Fax: 317.826.6410 Avon Office Building 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Phone: 317.745.9926 Fax: 317.745.9973 Merrillville Office 9800 Connecticut Drive Suite Bl-508 Merrillville, IN 46307 Phone: 219.644.3692 Fax: 219.644.3682 NORTH CAROLINA Charlotte Office 2151 Hawkins Street Suite 201 Charlotte, NC 28203 Phone: 704.333.8360 Fax: 704.333.8362 IOWA ProMap Office 1531 Airport Road Suite 2 Ames, IA 50010 Phone: 515.233.3311 Fax: 515.233.4575 u o The Schneider Corporation Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 Phone: 317.826.7100 Fax: 317.826:7200 September 14, 2005 Sheri L. Jordan IDEM, Facility Construction Section 100 North Senate Ave. Indianapolis, IN 46204 RE: Grandin Hall, Section 1 Secondary Plat and Construction Plans TSC Job # 5075.001 Dear Sheri, The Secondary Plat and Construction Plans have been revised according to the T AC review comments. The revisions corresponding to your comments are as follows: 1. The air pressure test, Section 3 I has been corrected. 2. The testing requirements in Section 3 I have been updated. 3. The waterlines are now shown in the sewer profiles. Please approve these revise plans or call me if you have any questions. Sincerely, J. Cort Crosby P .E. Project Engineer R:\5k\5075\OO 1 \docs\IDEMjordan091405.doc J1- :J~;~".tt',,:t:...;:-0!t ~www..schneidercorp:corri~~ > ~~;.~:.t..... u u HAMILTON COUNTY HIGHWAY DEPARTMENT August 17,2005 Mr. J. Cort Crosby The Schneider Corporation 8901 Otis Avenue Indianapolis, Indiana 46216-1037 RE: Grandin Hall Hall Secondary Plat S of 146th Street / W of Hazeldell Road Clay Township :' Dear Mr. Crosby: This letter is regarding a transmittal received August 2, 2005 containing the plans for the above-mentioned project. After reviewing the plans the Highway Department has the following comments: 1. It appears that these plans satisfy our previous concerns. I am enclosing a permit application for working in' our right-of-way. If you have any questions or comments concerning this letter, please feel free to contact me at anytime. G:\USERS\SB\05 tac\grandinhaIl081705.doc 1700 South 10th Street Noblesville, In. 46060 www.co.hamilton.in.us Office (317) 773-7770 Fax (317) 776-9814 l ..' ;r- u Q I , CI EL ~ , ,f>><tCt0 ,OCt.. / ':I1-/J /)/1 <'OOs c.lCs October 5, 2005 JAMES BRAINARD, MAYOR Mr. J. Cort Crosby, PE The Schneider Corporation Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 RE: Grandin Hall, Section l(formerly Runyon Hall) Construction Plans-Project Review #2 Dear Mr. Crosby: The City has received your comment letter and drawings dated September 19, 2005 based upon the City review of August 15,2005, The comments from the City review have been satisfactorily addressed with the following exceptions: PROJECT COMMENTS-CONSTRUCTION PLANS 12, ADA ramps are required at all locations where the sidewalks or asphalt paths cross the streets. Still did not find anything indicating ADA ramps. Please explain how these are designated and on which sheets they are shown. 14, Please remove Sheets 1101-1104 and Sheets L20l-L203 from the sets submitted to the Department of Engineering for approval, The Department of Engineering does not approve these sheets. Please be sure to also remove these items from the index on the title sheet Repeat this comment. The Department of Engineering does not approve the landscape plan and if they are attached to what is approved by this office, approval of the plan will be inferred. 16, On street plan-profile sheets, please delete any backfill general notes. The details should be revised to incorporate the City's backfill specification. Also, please add City of Carmel standard minimum cover note to each sheet Please add current City of Carmel standard minimum cover requirements - see attached copy. ' . .. 21. Please add the City of Carmel standard backfill requirement and standard minimum cover requirements for the installation of these utilities under City streets to the water and sanitary plan sheets, or to the appropriate details on the Detail sheets and delete all generic granular backfill references on these sheets. Please add current City of Carmel standard minimum cover requirements. 22, Please add the City of Carmel standard backfill requirement and minimum cover requirements for the installation of storm sewers under City streets to the storm sewer plan-profile sheets, or to the appropriate details on the Detail sheets and delete all generic granular backfill references on these sheets, Please revise to include the current minimum cover requirements. Based upon additional review, the City provides additional comment: 1, Please add the following note to the subsurface drain detail "THE PIPE FOR ALL SUBSURFACE DRAIN IS TO BE DOUBLE WALL HANCOR HI-Q OR EQUIVALENT" These comments represent the Department of Engineering's second review of the construction plans for this project We request that all responses to our conunents be provided in writing, Failure to provide written responses may result in the delay of the review process, DEPARTM,ENT OF ENGINEERING ONE CIVIC SQUARE, CAfu\lEL, IN 46032 OFFICE 317571.2441 FAX 317571.2439 El'vlAIL engineering@cLcarmeLin,us -/ I,. ,... u o It is critical that our office be made aware of all modifications made on the plans being resubmitted, particularly if any such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans including all revisions. Please notify us of any changes and specifically state any changes, including changes resulting from Plan Commission, BZA or other committee meetings. All bonds and performance guarantees must be posted prior to Engineering Department approval of construction plans. Also, Board of Public Works and Safety approvals and any other governing agency approvals (if required) must be obtained prior to Engineering Department approval. The Department reserves the right to provide additional comments based on subsequent reviews. If you have questions, please call me at 571-2441. cc: Matt Griffin, Department of Community Services John Duffy, Carmel Utilities Paul Pace, Carmel Utilities Paul Arnone, Carmel Utilities Craig Kunkle, Estridge Development Company, Inc. Greg Hoyes, Hamilton County Surveyor's Office John South, Hamilton County Soil & Water Mike McBride, Hamilton County Highway Department Project File Engineering Department Review S :\DHILL\PROJREV05\GRANDINHALLJ #2 ~ r }" .-r,~.. ,t \. .~ n Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 TO: MATT GRIFFIN CARMEL DOCS ONE CIVIC SQUARE CARMEL, IN 46032 DATE: 8/2/05 JOB # 5075.001 PROJECT: GRANDIN' HALL, SECTION 1 RE: FAX#: FROM: CORT CROSBY FAX: 317.826.7300 DIRECT DIAL: 317.826.7306 NUMBER OF PAGES: TELEPHONE #: WE ARE SENDING YOU: ~Attached Via: D Mail D Fed Ex D UPS ~ Courier D Pick Up D Other D Fax _Sheets # Copies Date Description 2 SECONDARY PLAT AND CONSTRUCTION PLANS 1 SECONDARY PLAT APPLICATION AND CHECKLIST 1 DEVELOPMENT REPORT 1 COPY OF LETTER TO TAC AGENCIES 1 COVENANTS AND RESTRICTIONS THE ABOVE ARE TRANSMITTED as checked below: ~ For approval D As requested D FOR BIDS DUE ~ For your use D For review and comment D Other REMARKS: If enclosures are not as noted, kindly notify us at once. '....'...ly..."'f:lliiTlml'iUi.I:N.l...II.lll_ r:\5k1507510011docsldocsgriflin080205,doc . a~/16/2aa5 16:21 3177769628 W HAMILTON CO SURVEYOR U . Xm(ml C 'Ward, Sunury'or 'Pfionr (J rr' 776.845'5 'Fax (j l7] 771i=.-~62.$ .)'r/ilt rSS Onr :}{omi(C(J/1 ("111m,)' Sqrltlrl.' ."N(IM',w;{fr, Tndinnrl 4~('Go-22 ',0 August 16, 2005 Re: Grandin Hall /,(~~J~I=~~':.~ .. ..,,'. "'- ~ / / ", . .~ ( .1 ",-,,/ r-,". . ~ $ \\ ('..1.... 4~ ~ \.' \ .. I '. /" ~<? \\ ~-~ ) " ,/\.</ ""- ' ,'" . . \. / ..............- / The Schneider Corporation ATTN: Cort Crosby 8901 Otis Avenue Indianapolis, IN 46216-1037 VIA F ACSlMILE: 826-7200 Dear Mr. Crosby: We have reviewed the construction plans submitted to the Hamilton County Surveyor's Office on August 3, 2005 for this project and have the following comments: 1. This proposed project falls within the incorporated area of the City of Cannel. 2. This proposed project DOES fall within a Carmel Wellhead Protection Zone. 3. This proposed project fall in the Freemont Randall Regulated Drain Watershed. 4. An off-site easement or acknowledgment letter wilt be required for the site outlet that runs south. It appears this common area is still owned by Langston Development. 5. It appears the landscaping block access for maintenance work on the site outlet pipe for this site. I would guess that Carmel Engineering Department will comment on this. The Hamilton County Surveyor's Office would ask that a maintenance path will be thought about for the City of Cannel and us to access the Freemont Randall Drain. 6. Further discussion will need to take place that might help provide an emergency overflow for the Woodfield Lake south ofthi& property. I will contact you at a later date about this issue. .0~/16/2005 16:21 3177769628 W HAMILTON CO SURVEYOR U . 7. All other stonn sewer issue will be reviewed by Carmel Engineering and Crossroad Engineering. 8. Please note the additional comments may be warranted at a later date. Should you have any questions, I can be reached at 317-776-8495. ~~ Greg Hayes Plan Reviewer cc: Matt Griffin - Cannel DOCD John South - HCSWCD Dick Hill- Cannel Engineering Mike McBride - HCRD Crossroads Engineering Estridge Development PAGE 02/02 ,;. w o cOfl5~60l~Sfi EL August 15, 2005 JAMES BRAINARD, J\1AYOR Mr. J. Cort Crosby, PE The Schneider Corporation Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 RE: Grandin Hall, Section l(formerly Runyon Hall) Construction Plans-Project Review #1 Dear Mr. Crosby: We have reviewed the construction plans submitted for this project for review for the August 17, 2005 Technical Advisory Committee. We offer the following comments: GENERALINFO~ATION 1. The project site is located within current City of Carmel Corporate Lirnits. 2. Jurisdictions: . Streets and Right of Way (Interior Streets) - City of Carmel I (146tb Street) -Hamilton County Highway Department . Water - City of Carmel Utilities . Sanitary Sewers - City of Carmel Utilities . Storm SewerslDrainage - City of Carmel . Regulated! Legal Drains - Hamilton County Surveyor's Office. 3. Board of Public Works and Safety Requirements: . Water Availability and Sanitary Sewer approval from the Board is based upon the total number of single-family residences @ 1.0 EDU/single family residence. If a community swimming pool or bathhouse is planned, additional Water and Sanitary Sewer Availability approval from the Board will be required and additional Water and Sanitary Sewer Connection Fees will be assessed. If entryway or other community irrigation systems are planned, these will also require additional Water Availability approval from the Board and additional Water Connection Fees will be assessed. . Commercial Curb Cut approval will be required for the Community Amenity Area (Common Area E). . Any permanent improvement (including irrigation systems) to be installed within dedicated right of way or dedicated easements within the subdivision. This approval would require a Consent to Encroach Agreement between the Owner and the City of Carmel. Irrigation systems or other improvements installed in the right of way of l46th Street will require approval of the Hamilton County Highway Department. . Secondary Plat approval. . Right of Way Dedication (if applicable) A schedule for Board of Public Works and Safety meeting dates and agenda deadlines was previously sent for your use. Please use the Engineering Department deadlines for submissions to the Board. Any submission to the Board requires prior approval by the Carmel Clay Plan Commission and/or the Board o/Zoning Appeals (ifapplicable) and completion o/review by the Technical Advisory Committee. All written requests to be placed on the Board's agenda must include the DEPARTMENT OF ENGINEERING ONE CMe SQUARE, CARMEL, IN 46032 OFFICE 317.571.2441 FAX 317.571.2439 EMAIL engineering@ci.carmel.in.us ... u u appropriate Docket Number and the date (or dates) of approval by the Plan Commission and/or the Board of Zoning Appeals (if applicable). 4. T.A.C. Review/Drawings submitted for approval: We request that all comments and comment letters generated by this office be answered in writing and be accompanied by a drawing reflecting requested revisions. Final drawings will not be approved for construction until all Engineering Department and Carmel Utilities issues have been resolved. The design engineer must certify all drawings submitted for fInal approval. We will require a minimum of fIve-sets of drawings for approval after all issues have been resolved. The drawings will be stamped as approved and will be signed by the City Engineer and by Carmel Utilities. One set will be distributed to the Owner/Developer to be maintained on the construction site. Two sets will be distributed to Carmel Utilities and two sets to the Engineering Department. If the Owner/Developer wishes to have additional signed and approved sets, we will approve an additional two sets or a total of seven sets. The additional sets must be submitted with the required fIve sets. 5. Please be advised that any installation of signs, walls, irrigation systems, etc. within dedicated right of way (excepting l46th Street) or dedicated easements will require a Consent to Encroach Agreement with the City of Carmel's Board of Public Works and Safety. 6. Carmel Utilities should be provided copies of all drawings and revisions for review of water and sanitary sewer issues. They will provide a separate review regarding these issues. 7. Carmel Utilities does not subscribe to "Holey Moley" and should be contacted directly for all water main and sanitary sewer locations. 8. I have sent copies of the following previously and will not send additional copies unless requested to do so: . Subdivision Project Approval Procedures . Performance Release Procedure . Subdivision Building Permits . Permit Data, Contacts, etc. . Street Sign requirements BONDING REQUIREMENTS 9. Upon initial review, it appears the following bonding requirements may apply to this project: Performance GuaranteeslEngineer's Estimates Individual Performance Guarantees will be required for the following subdivision improvements: . Interior Streets (base, binder and surface). . Curbs (interior streets) . Water Mains . Sanitary Sewers . Storm Sewers . Street Signs . Monuments & Markers . Sidewalks may be bonded separately as follows: Interior - Builders Lots Exterior - All other including sidewalks/paths in dedicated right of way adjacent to common areas. Sidewalks and/or Asphalt Paths in the right of way of l46th Street are not bonded with the City of Carmel. The amount of the Performance Guarantee is based upon a certifIed Engineer's Estimate for 100% of the cost oflabor and materials to construct the individual improvements, to be provided by the design engineer. Please provide detailed Engineers Estimates for each improvement including unit costs, quantities, materials and types of materials, etc. Upon completion and release of individual Performance Guarantees, a three-year Maintenance Guarantee will be required. The Maintenance Guarantee amount is based upon 15% of the Performance amount for Streets and Curbs and 10% of the Performance amount for all other improvements. Performance Guarantees . Q o may be Performance or Subdivision Bonds or Irrevocable Letters of Credit. Please reference the enclosures for more detailed explanation of our procedures. Right of Way Permit and Bonding Any work in the dedicated right of way of 146th Street is under the jurisdiction of the Hamilton County Highway Department 10. We have engaged Crossroad Engineers, PC to review all drainage plans and drainage calculations submitted to this office for review. We will share Crossroad's comments as they are received. When construction plans are submitted for review for this development, please provide 2-sets of plans and calculations to allow us to send the extra set to Crossroad to save some time in the review process. AVAILABILITY AND CONNECTION FEES 11. Availability (acreage) Fees must be paid after all other Engineering Department requirements have been satisfied and prior to the start of construction activities. Availability Fees are based upon total platted acreage for the development at the current rate of$I,01O.00 per acre, Water Availability Fee and $1,365.00 per acre, Sanitary Sewer Availability Fee. Based upon the primary plats indicated acreage, the following Availability Fees would apply: Water- 39.08 Acres @ $1,OlO.OO/Acre = $39,471.00 Sanitary Sewer- 39.08 Acres@$1,365.00/Acre= $53.344.00 Total Availability (acreage) Fees $92,815.00 Connection Fees are currently $1,310.00 for water and $795.00 for sanitary sewers (total $2,105.00) per single-family residence. Connection Fees are paid when the infrastructure has been complete, satisfactory test results obtained and the subdivision has been released for permits. Water and Sanitary Sewer Connection Fees are paid on a per-lot basis. . If an irrigation system, swimming pool or clubhouse is planned for this, or any future . section of the development, additional Water and Sanitary Sewer Connection Fees will be assessed based upon the recommendation of the Director of Carmel Utilities. PROJECT COMMENTS-CONSTRUCTION PLANS 12. ADA ramps are required at all locations where the sidewalks or asphalt paths cross the streets. 13. Please provide horizontal curve data on street plan-profile sheets. 14. Please remove Sheets Ll01-Ll04 and Sheets L201-L203 from the sets submitted to the Department of Engineering for approval. The Department of Engineering does not approve these sheets. Please be sure to also remove these items from the index on the title sheet. 15. As stated at the primary plat review, all lots adjacent to side yard easements should be wide enough to accommodate the anticipated house model and any planned driveways such that there is no encroachment in the easements. 16. On street plan-profile sheets, please delete any backfill general notes. The details should be revised to incorporate the City's backfill specification. Also, please add City of Carmel standard minimum cover note to each sheet. 17. At the entrance, please indicate and label the width of the entrance and exit lanes and the median island. The City will defer to the Hamilton County Highway Department for any comments they may have related to the entrance configuration and median island width and need for auxiliary lanes. 18. Please provide a maintenan~e of traffic plan for any work at the 146th Street entrance. 19. Please add the following note to Sheet C303: "ALL SIGNS ARE INSTALLED BY THE CITY AND REQUIRE AN ORDINANCE." 20. Please add the following note to the water, sanitary, and storm plan sheets: "THERE ARE TO BE NO WATER VAL YES OR MANHOLES WITHIN THE PA YEMENT, CURBS, OR SIDEWALKS" except curb inlets. 21. Please add the City of Carmel standard backfill requirement and standard rnillimum cover requirements for the installation of these utilities under City streets to the water and sanitary plan sheets, or to the appropriate details on the Detail sheets and delete all generic granular backfill references on these sheets. .. u u 22. Please add the City of Carmel standard backfill requirement and minimum cover requirements for the installation of storm sewers under City streets to the storm sewer plan-profile sheets, or to the appropriate details on the Detail sheets and delete all generic granular backfill references on these sheets. 23. Please revise the 5 inches HMA #5D base noted on Details 1,2, and 3 and Sheet C801 to be 2 inches HMA #8 binder on 3 inches HMA #5D base. 24. Please replace the sidewalk details with the City of Carmel standard sidewalk details. 25. Please confirm that storm sewer from structure 104 to structure 103 is within an existing easement. 26. The Department would expect that the storm water collection, conveyance, and detention system has been designed in accordance with the letter from the Department of Engineering dated May 11,2005 and previous discussions related to upstream and off-site drainage areas, and the restrictions and concerns of the downstream receiving system. 27. Details 8/C802, 5/C802, and "Typical Water Main Detail" on C703 shall be revised to conform to City backfill requirements under City streets. These comments represent the Department of Engineering's initial review of the construction plans for this project. We request that all responses to our comments be provided in writing. Failure to provide written responses may result in the delay of the review process. It is critical that our office be made aware of all modifications made on the plans being resubmitted, particularly if any such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans including all revisions. Please notify us of any changes and specifically state any changes, including changes resulting from Plan Commission, BZA or other committee meetings. All bonds and performance guarantees must be posted prior to Engineering Department approval of construction plans. Also, Board of Public Works and Safety approvals and any other governing agency approvals (if required) must be obtained prior to Engineering Department approval. The Department reserves the right to provide additional comments based on subsequent reviews. If you have questions, please call me at 571-2441. cc: Matt Griffin, Department of Community Services John Duffy, Carmel Utilities Paul Pace, Carmel Utilities Paul Arnone, Carmel Utilities Greg Hoyes, Hamilton County Surveyor's Office John South, Hamilton County Soil & Water Mike McBride, Hamilton County Highway Department Project File Engineering Department Review S:\DHILL\PROJREVOS\RUNYONHALLPRIMARYPLA T - . 7 riJ<:;p 'L.~-d~ u u C<l!tJr:mel / /-=-~"0~ /~ ,', ~~. ~C""""" ,> , /'. ~ ". ;" ~I RECEIVED '\~ > (.-: AUG - 9 2005 ; ) \\.\ , DOCS ,Z '\ ~ / ~'/ ~, 7~~~_ _'_-W' \ ;' '- ' ' \ "-~i--0-- ~6032 August 8, 2005 J. Cort Crosby, PE The Schneider Corporation 8901 Otis Avenue Indianapolis, IN 46216-1037 RE: Grandin Hall, Section 1 Secondary Plat & Construction Plans TSC Job No.: 5075.001 Dear J. Cort Crosby: The information for the above-referenced project has been reviewed. At the present time, I see nothing in the plans that would hamper law enforce- ment efforts. If we can be of any further assistance to you, please contact us. Respectfully, ~b..((4 Michael D. Fogarty Chief of Police MDF:vb cc: Dept. of Community Services (317) 571-2500 A Nationally Accredit rcement Agency Fax (317) 571-2512 ....-... (:; u u City of Carmel VIA FAX: 826-7340 Original by mail August 11,2005 J. Cort Crosby The Schneider Corporation 8901 Otis Avenue Indianapolis, IN 46216 COPy RE: Grandin Hall, Sec 1 (#05080014 SP) - Secondary Plat Application Dear Mr. Crosby: This letter is in response to your Secondary Plat Application for Grandin Hall, Sec 1. It is anticipated that you will be heard at the August 17 T AC meeting, where additional comments may be voiced. Please complete the following: ~ 1. Please add docket no. 05080014 SP on plat. 2. Place the flood statement on the plat. 3. Fill in all instrument nos. referred to on the plat. 4. Place the zoning, S-J/Residence, on the plat. 5. Show/label the 75-ft half road right of way of 146th Street. 6. Please provide a copy of the covenants, ifany. 7. Subdivision entry signage will require a sign permit Condrllction Plans: No comments. Please submit a revised Secondary Plat after the T AC meeting with the above-mentioned changes. Once these changes have been made and comments addressed, please produce a Mylar copy for signature by this Department. Two paper copies of the plat must be filed with the Mylar prior to recording, and three paper copies and a Mylar of the recorded plat must be submitted following recording. Our approval of the secondary plat (signature) will be forthcoming upon revision of the plans according to the items listed above. Also, the staff has been advised that we cannot present a Secondary Plat to the Director for signature from this point forward until Terry Krueskamp (tkrueskamp@carmel.in.gov) in Information Systems has received an e-mail with an electronic file attached (MicroStation .dgn is preferred, or AutoCad .dwg of the subdivision) and it (the e-mail) has been copied to Matt Griffin (mgriffin@carmel.in.gov) and myself (aconn@carmel.in.gov). (Also, Matt Griffin would also like a .pdf file, as we move toward a paperless office.) If you have any questions or if! may be of assistance, please feel free to call. Sincerely, Angelina Conn Planning Administrator File: 05080014 SP-Grandin Hall, See I Page 1 ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417 ":- To: ;f Coyl Cros~ Fax: 82JLo - 7sLJo .. Fax Phone: u u CITY OF CARMEL Department of Community Services One CMc Square Carmel, IN 4Sl32 (317) 571-2417 Fax: (317) 571-2426 From: ~n 'f1'e ~ 2J 8-)0-05 Pages: Date: Re: If e V ,,~ / e l.f-ev -4:;.,- cc: qrar1cU;' J-/.C( II o Urgent 0 ~r Review 0 Please Comment 0 Please Reply o Please Recycle -4 ...- ~~ Schneider INDIANA Corporate Headquarters Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216 Phone: 317 .826. 7100 Toll-Free: 866.973.7100 Fax: 317.826.7200 Lafayette Office 3725 Rome Drive Park 26 Lafayette, IN 47905 Phone: 765.448.6661 Fax: 765.448.6665 Carmel Office 12821 E New Market Street Suite 100 Carmel, IN 46032 Phone: 317.569.8112 Fax: 317.826.6410 Avon Office Building 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Phone: 317.745.9926 Fax: 317.745.9973 Merrlllvllle Office 9800 Connecticut Drive Suite 81-508 Merrillville, IN 46307 Phone: 219.644.3692 Fax: 219.644.3682 NORTH CAROLINA Charlotte Office 2151 Hawkins Street Suite 201 Charlotte, NC 28203 Phone: 704.333.8360 Fax: 704.333.8362 IOWA ProMap Office 1531 Airport Road Suite 2 Ames, IA 50010 Phone: 515.233.3311 Fax: 515.233.4575 u U The Schneider Corporation Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 Phone: 317.826.7100 Fax: 317.826.7200 August 2, 2005 Mike McBride Hamilton County Highway Department 1700 S. 10th Street Noblesville, IN 46060 RE: Grandin Hall, Section 1 Secondary Plat & Construction Plans TSC Job #5075.001 Dear Mike: One copy of the Secondary Plat & Construction Plans for Grandin Hall, Section 1 are enclosed. These plans will be reviewed at the August 17, 2005, Carmel TAC meeting. Please forward your review comments to me or call if you have any questions. Sincerely, a<J~( ~ J.~Cr6SbY. P.V Project Engineer JCC/cct Enclosures ~'j'j'.I'..l'.I'II-.'"1:"'I,[;.JI'I:.Jtll,).,J(I{.ilii.:m r:\5k\50 75\001 \docs \tac080205.doc -I ~~ Schneider INDIANA Corporate Headquarters Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216 Phone: 317 .826. 7100 Toll-Free: 866.973.7100 Fax: 317.826.7200 Lafayette Office 3725 Rome Drive Park 26 Lafayette, IN 47905 Phone: 765.448.6661 Fax: 765.448.6665 Carmel Office 12821 E New Market Street Suite 100 Carmel. IN 46032 Phone: 317.569.8112 Fax: 317.826.6410 Avon Office Building 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Phone: 317.745.9926 Fax: 317.745.9973 Merrillville Office 9800 Connecticut Drive Suite Bl-508 Merrillville, IN 46307 Phone: 219.644.3692 Fax: 219.644.3682 NORTH CAROLINA Charlotte Office 2151 Hawkins Street Suite 201 Charlotte, NC 28203 Phone: 704.333.8360 Fax: 704.333.8362 IOWA Pro Map Office 1531 Airport Road Suite 2 Ames, IA 50010 Phone: 515.233.3311 Fax: 515.233.4575 u u The Schneider Corporation Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 Phone: 317.826.7100 Fax: 317.826.7200 August 2, 2005 John Duffy Carmel Clay Utilities 130 First Avenue SW Carmel, IN 46032 RE: Grandin Hall, Section 1 Secondary Plat & Construction Plans TSC Job #5075.001 Dear John: One copy of the Secondary Plat & Construction Plans for Grandin Hall, Section 1 are enclosed. These plans will be reviewed at the August 17, 2005, Carmel TAC meeting. Please forward your review comments to me or call if you have any questions. Sincerely, J.~~ Project Engineer JCC/cct Enclosures ~:t~';.,-i L-:;;fl-~'~.; ,'~ www.schneider.corp.cfi(iiJm r:\5k\5075\OOl \docs\tac080205.doc ~~ Schneider INDIANA Corporate Headquarters Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216 Phone: 317.826.7100 Toll-Free: 866.973.7100 Fax: 317.826.7200 Lafayette Office 3725 Rome Drive Park 26 Lafayette, IN 47905 Phone: 765.448.6661 Fax: 765.448.6665 Carmel Office 12821 E New Market Street Suite 100 Carmel, IN 46032 Phone: 317.569.8112 Fax: 317.826.6410 Avon Office Building 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Phone: 317.745.9926 Fax: 317.745.9973 Merrillville Office 9800 Connecticut Drive Suite Bl-508 Merrillville, IN 46307 Phone: 219.644.3692 Fax: 219.644.3682 NORTH CAROLINA Charlotte Office 2151 Hawkins Street Suite 201 Charlotte, NC 28203 Phone: 704.333.8360 Fax: 704.333.8362 IOWA ProMap Office 1531 Airport Road Suite 2 Ames, IA 50010 Phone: 515.233.3311 Fax: 515.233.4575 u w The Schneider Corporation Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 Phone: 317.826.7100 Fax: 317.826.7200 August2,2005 Dick Hill Dept. of Engineering One Civic Square Carmel, IN 46032 RE: Grandin Hall, Section 1 Secondary Plat & Construction Plans TSC Job #5075.001 Dear Dick: One copy of the Secondary Plat & Construction Plans for Grandin Hall, Section 1 are enclosed. These plans will be reviewed at the August 17, 2005, Carmel TAC meeting. Please forward your review. comments to me or call if you have any questions. Sincerely, r4~1 A? J.~ Crosby, P.V Project Engineer JCC/cct Enclosures ,f.t ; o';fO".'::t;,'15, www.5chn_eidercorp'.c6~! r:\5k\5075\OOl \docs\tac080205.doc ~~ Schneider u u The Schneider Corporation INDIANA Corporate Headquarters Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216 Phone: 317.826.7100 Toll-Free: 866.973.7100 Fax: 317.826.7200 Lafayette Office 3725 Rome Drive Park 26 Lafayette, IN 47905 Phone: 765.448.6661 Fax: 765.448.6665 Carmel Office 12821 E New Market Street Suite 100 Carmel, IN 46032 Phone: 317.569.8112 Fax: 317.826.6410 Avon Office Building 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Phone: 317.745.9926 Fax: 317.745.9973 Merrillvllle Office 9800 Connecticut Drive Suite Bl-508 Merrillville, IN 46307 Phone: 219.644.3692 Fax: 219.644.3682 NORTH CAROLINA Charlotte Office 2151 Hawkins Street Suite 201 Charlotte, NC 28203 Phone: 704.333.8360 Fax: 704.333.8362 IOWA ProMap Office 1531 Airport Road Suite 2 Ames, IA 50010 Phone: 515.233.3311 Fax: 515.233.4575 Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 Phone: 317.826.7100 Fax: 317.826.7200 August 2, 2005 John South Hamilton County Soil & Water 1108 South 9th Street Noblesville, IN 46060 RE: Grandin Hall, Section 1 Secondary Plat & Construction Plans TSC Job #5075.001 Dear John: One copy of the Secondary Plat & Construction Plans for Grandin Hall, Section 1 are enclosed. These plans will be reviewed at the August 17, 2005, Carmel TAC meeting. Please forward your review comments to me or call if you have any questions. Sincerely, r4~( A? J.~Cto$l>Y. P.V Project Engineer JCC/cct Enclosures ix?f~}}J~S;.~,1':'1~,);'~ w~w~scti heider_CO!R.CO~~ r:\5k\5075\OOl \docs\tac080205.doc ~~ Schneider INDIANA . Corporate Headquarters Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216 Phone: 317.826.7100 Toll-Free: 866.973.7100 Fax: 317.826.7200 Lafayette Office 3725 Rome Drive Park 26 Lafayette, IN 47905 Phone: 765.448.6661 Fax: 765.448.6665 Carmel Office 12821 E New Market Street Suite 100 Carmel, IN 46032 Phone: 317.569.8112 Fax: 317.826.6410 Avon Office Building 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Phone: 317.745.9926 Fax: 317.745.9973 Merrillville Office 9800 Connecticut Drive Suite Bl-508 Merrillville, IN 46307 Phone: 219.644.3692 Fax: 219.644.3682 NORTH CAROLINA Charlotte Office 2151 Hawkins Street Suite 201 Charlotte, NC 28203 Phone: 704.333.8360 Fax: 704.333.8362 IOWA ProMap Office 1531 Airport Road Suite 2 Ames, IA 50010 Phone: 515.233.3311 Fax: 515.233.4575 u u The Schneider Corporation Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 Phone: 317.826.7100 Fax: 317.826.7200 August 2, 2005 Greg Hoyes Hamilton County Surveyor's Office One Hamilton County Square, Suite 188 Hamilton County Judicial Center Noblesville IN 46060 RE: Grandin Hall, Section 1 Secondary Plat & Construction Plans TSC Job #5075.001 Dear Greg: One copy of the Secondary Plat & Construction Plans for Grandin Hall, Section 1 are enclosed. These plans will be reviewed at the August 17, 2005, Carmel TAC meeting. Please forward your review comments to me or call if you have any questions. Sincerely, JCC/cct Enclosures 'o;~':'J"".L!;r<'1" f. XW\'\lw.sctineidercorp.com:l~ r:\5k\5075\OOl \docs\tac080205.doc ~~ Schneider INDIANA Corporate Headquarters Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216 Phone: 317.826.7100 Toll-Free: 866.973.7100 Fax: 317.826.7200 Lafayette Office 3725 Rome Drive Park 26 Lafayette, IN 47905 Phone: 765.448.6661 Fax: 765.448.6665 Carmel Office 12821 E New Market Street Suite 100 Carmel, IN 46032 Phone: 317.569.8112 Fax: 317.826.6410 Avon Office Building 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Phone: 317.745.9926 Fax: 317.745.9973 Merrillville Office 9800 Connecticut Drive Suite 81-508 Merrillville, IN 46307 Phone: 219.644.3692 Fax: 219.644.3682 NORTH CAROLINA Charlotte Office 2151 Hawkins Street Suite 201 Charlotte, NC 28203 Phone: 704.333.8360 Fax: 704.333.8362 IOWA ProMap Office 1531 Airport Road Suite 2 Ames, IA 50010 Phone: 515.233.3311 Fax: 515.233.4575 u U The Schneider Corporation Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 Phone: 317 .826.7100 Fax: 317.826.7200 August 2, 2005 Karen Pitts Carmel Postmaster/United States Postal Service 275 Medical Drive Carmel, IN 46032-9998 RE: Grandin Hall, Section 1 Secondary Plat & Construction Plans TSC Job #5075.001 Dear Karen: One copy of the Secondary Plat & Construction Plans for Grandin Hall, Section 1 are enclosed. These plans will be reviewed at the August 17, 2005, Carmel TAC meeting. Please forward your review comments to me or call if you have any questions. Sincerely, r4~{'.~ J. ~croSbY, P.V. Project Engineer JCC/cct Enclosures '., '.:';S._ :1:.' ;,:~..;; .www.schneJdercQrp:'cojrlJl1? r:\5k\5075\OOl \docs\tac080205.doc ~~ Schneider INDIANA Corporate Headquarters Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216 Phone: 317.826.7100 Toll-Free: 866.973.7100 Fax: 317.826.7200 Lafayette Office 3725 Rome Drive Park 26 Lafayette, IN 47905 Phone: 765.448.6661 Fax: 765.448.6665 Carmel Office 12821 E New Market Street Suite 100 Carmel, IN 46032 Phone: 317.569.8112 Fax: 317.826.6410 Avon Office Building 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Phone: 317.745.9926 Fax: 317.745.9973 Merrillville Office 9800 Connecticut Drive Suite 81-508 Merrillville, IN 46307 Phone: 219.644.3692 Fax: 219.644.3682 NORTH CAROLINA Charlotte Office 2151 Hawkins Street Suite 201 Charlotte, NC 28203 Phone: 704.333.8360 Fax: 704.333.8362 IOWA ProMap Office 1531 Airport Road Suite 2 Ames, IA 50010 Phone: 515.233.3311 Fax: 515.233.4575 u W The Schneider Corporation Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 Phone: 317.826.7100 Fax: 317.826.7200 August 2, 2005 Jeff Farmer Brighthouse Networks 516 E. Carmel Drive Carmel, IN 46032 RE: Grandin Hall, Section 1 Secondary Plat & Construction Plans TSC Job #5075.001 Dear Jeff: One copy of the Secondary Plat & Construction Plans for Grandin Hall, Section 1 are enclosed. These plans will be reviewed at the August 17, 2005, Carmel TAC meeting. Please forward your review comments to me or call if you have any questions. Sincerely, J.~~ Project Engineer JCC/cct Enclosures ~./}:_ :" i:j_~www.schneidercQrp:coml:;fl r:\5k\5075\OOl \docs\tac080205.doc ~~ Schneider INDIANA Corporate Headquarters Historic Fort Harrison 8901 otis Avenue Indianapolis, IN 46216 Phone: 317.826.7100 TolI.Free: 866.973.7100 Fax: 317.826.7200 Lafayette Office 3725 Rome Drive Park 26 Lafayette, IN 47905 Phone: 765.448.6661 Fax: 765.448.6665 Carmel Office 12821 E New Market Street Suite 100 Carmel, IN 46032 Phone: 317.569.8112 Fax: 317.826.6410 Avon Office Building 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Phone: 317.745.9926 Fax: 317.745.9973 Merrillville Office 9800 Connecticut Drive Suite Bl-508 Merrillville, IN 46307 Phone: 219.644.3692 Fax: 219.644.3682 NORTH CAROLINA Charlotte Office 2151 Hawkins Street Suite 201 Charlotte, NC 28203 Phone: 704.333.8360 Fax: 704.333.8362 IOWA ProMap Office 1531 Airport Road Suite 2 Ames, IA 50010 Phone: 515.233.3311 Fax: 515.233.4575 v u The Schneider Corporation Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 Phone: 317.826.7100 Fax: 317.826.7200 August 2, 2005 Jim Blanchard Assistant Building Commissioner One Civic Square Carmel, IN 46032 RE: Grandin Hall, Section 1 Secondary Plat & Construction Plans TSC Job #5075.001 Dear Jim: One copy of the Secondary Plat & Construction Plans for Grandin Hall, Section 1 are enclosed. These plans will be reviewed at the August 17, 2005, Carmel TAC meeting. Please forward your review comments to me or call if you have any questions. Sincerely, a<J~~( ~ J,~crosbY,P.y Project Engineer JCC/cct Enclosures 1,- y; Y' '; .".::':" ~.. www.schneidercorp:co!y\~ r:\5k\5075\OOl \docs\tac080205.doc ~~ Schneider INDIANA Corporate Headquarters Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216 Phone; 317.826.7100 Toll-Free: 866.973.7100 Fax: 317.826.7200 Lafayette Office 3725 Rome Drive Park 26 Lafayette, IN 47905 Phone: 765.448.6661 Fax: 765.448.6665 Carmel Office 12821 E New Market Street Suite 100 Carmel, IN 46032 Phone; 317.569.8112 Fax: 317.826.6410 Avon Office Building 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Phone: 317.745.9926 Fax: 317.745.9973 Merrillville Office 9800 Connecticut Drive Suite Bl-508 Merrillville, IN 46307 Phone; 219.644.3692 Fax: 219.644.3682 NORTH CAROLINA Charlotte Office 2151 Hawkins Street Suite 201 Charlotte, NC 28203 Phone: 704.333.8360 Fax: 704.333.8362 IOWA ProMap Office 1531 Airport Road Suite 2 Ames, IA 50010 Phone: 515.233.3311 Fax: 515.233.4575 u ~ The Schneider Corporation Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 Phone: 317.826.7100 Fax: 317.826.7200 August 2, 2005 Chuck Shupperd Vectren Energy PO Box 1700 Noblesville IN 46061-1700 RE: Grandin Hall, Section 1 Secondary Plat & Construction Plans TSC Job #5075.001 Dear Chuck: One copy of the Secondary Plat & Construction Plans for Grandin Hall, Section 1 are enclosed. These plans will be reviewed at the August 17, 2005, Carmel TAC meeting. Please forward your review comments to me or call if you have any questions. Sincerely, r4~~( A' J.~crosPY.P.V Project Engineer JCC/cct Enclosures .;,;, ;\'~:':";::';,l' ';'. ww,w.schneidercorp.cqm~ r:\5k\5075\OOl \docs\tac080205.doc ~~ Schneider v u The Schneider Corporation INDIANA Corporate Headquarters Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216 Phone: 317.826.7100 Toll-Free: 866.973.7100 Fax: 317.826.7200 Lafayette Office 3725 Rome Drive Park 26 Lafayette, IN 47905 Phone: 765.448.6661 Fax: 765.448.6665 Carmel Office 12821 E New Market Street Suite 100 Carmel, IN 46032 Phone: 317.569.8112 Fax: 317.826.6410 Avon Office Building 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Phone: 317.745.9926 Fax: 317.745.9973 Merrillville Office 9800 Connecticut Drive Suite 81-508 Merrillville, IN 46307 Phone: 219.644.3692 Fax: 219.644.3682 NORTH CAROLINA Charlotte Office 2151 Hawkins Street Suite 201 Charlotte, NC 28203 Phone: 704.333.8360 Fax: 704.333.8362 IOWA ProMap Office 1531 Airport Road Suite 2 Ames, IA 50010 Phone: 515.233.3311 Fax: 515.233.4575 Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 Phone: 317.826.7100 Fax: 317.826.7200 August 2, 2005 Ron Booher Cinergy PSI Customer Project Coordinator 1441 South Guilford Rd Carmel, IN 46032 RE: Grandih Hall, Section 1 Secondary Plat & Construction Plans TSC Job #5075.001 Dear Ron: One copy of the Secondary Plat & Construction Plans for Grandin Hall, Section 1 are enclosed. These plans will be reviewed at the August 17, 2005, Carmel TAC meeting. Please forward your review comments to me or call if you have any questions. Sincerely, J.~~ Project Engineer JCC/cct Enclosures :,: .;" \,'>.,o;:~':'www.sch!l~ider_corp.corfiil! r:\5k\5075\OOl \docs\tac080205.doc ~~ Schneider INDIANA Corporate Headquarters Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216 Phone: 317.826.7100 Toll-Free: 866.973.7100 Fax: 317.826.7200 Lafayette Office 3725 Rome Drive Park 26 Lafayette, IN 47905 Phone: 765.448.6661 Fax: 765.448.6665 Carmel Office 12821 E New Market Street Suite 100 Carmel, IN 46032 Phone: 317.569.8112 Fax: 317.826.6410 Avon Office Building 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Phone: 317.745.9926 Fax: 317.745.9973 Merrillville Office 9800 Connecticut Drive Suite Bl-508 Merrillville, IN 46307 Phone: 219.644.3692 Fax: 219.644.3682 NORTH CAROLINA Charlotte Office 2151 Hawkins Street Suite 201 Charlotte, NC 28203 Phone: 704.333.8360 Fax: 704.333.8362 IOWA ProMap Office 1531 Airport Road Suite 2 Ames, IA 50010 Phone: 515.233.3311 Fax: 515.233.4575 u u The Schneider Corporation Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 Phone: 317.826.7100 Fax: 317.826.7200 August2,2005 Mark Westmeir Carmel/Clay Parks Department 1055 Third Avenue SW Carmel IN 46032 RE: Grandin Hall, Section 1 Secondary Plat & Construction Plans TSC Job #5075.001 Dear Mark: One copy of the Secondary Plat & Construction Plans for Grandin Hall, Section 1 are enclosed. These plans will be reviewed at the August 17, 2005, Carmel TAC meeting. Please forward your review comments to me or call if you have any questions. Sincerely, ~~~( ~ J.~CrOSbY.P.~ Project Engineer JCC/cct Enclosures ~..-1 j' ';' ~f.?;:~..www.scl:iheidercorp.co1i1l!\if r:\5k\5075\OOl \docs\tac080205.doc ~~ Schneider INDIANA Corporate Headquarters Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216 Phone: 317.826.7100 Toll-Free: 866.973.7100 Fax: 317.826.7200 Lafayette Office 3725 Rome Drive Park 26 Lafayette, IN 47905 Phone: 765.448.6661 Fax: 765.448.6665 Carmel Office 12821 E New Market Street Suite 100 Carmel, IN 46032 Phone: 317.569.8112 Fax: 317.826.6410 Avon Office Building 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Phone: 317.745.9926 Fax: 317.745.9973 Merrillville Office 9800 Connecticut Drive Suite Bl-508 Merrillville, IN 46307 Phone: 219.644.3692 Fax: 219.644.3682 NORTH CAROLINA Charlotte Office 2151 Hawkins Street Suite 201 Charlotte, NC 28203 Phone: 704.333.8360 Fax: 704.333.8362 IOWA ProMap Office 1531 Airport Road Suite 2 Ames, IA 50010 Phone: 515.233.3311 Fax: 515.233.4575 w (.,,) The Schneider Corporation Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 Phone: 317.826.7100 Fax: 317.826.7200 August 2, 2005 Bill Akers Carmel/Clay Communications 31 First Avenue NW Carmel, IN 46032 RE: Grandin Hall, Section 1 Secondary Plat & Construction Plans TSC Job #5075.001 Dear Bill: One copy of the Secondary Plat & Construction Plans for Grandin Hall, Section 1 are enclosed. These plans will be reviewed at the August 17, 2005, Carmel TAC meeting. Please forward your review comments to me or call if you have any questions. Sincerely, ~~~(# J.~CroSbY,P.V Project Engineer JCC/cct Enclosures y ;~4;:'~ ti'f"""t!f::-:;';:,,,, ;::-www.scn[1eiaercorp.coi11:-ti r:\5k\5075\OOl \docs\tac080205.doc -. ~~ Schneider ~ W The Schneider Corporation INDIANA Corporate Headquarters Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216 Phone: 317 .826. 7100 Toll-Free: 866.973.7100 Fax: 317.826.7200 Lafayette Office 3725 Rome Drive Park 26 Lafayette, IN 47905 Phone: 765.448.6661 Fax: 765.448.6665 Carmel Office 12821 E New Market Street Suite 100 Carmel, IN 46032 Phone: 317.569.8112 Fax: 317.826.6410 Avon Office Building 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Phone: 317.745.9926 Fax: 317.745.9973 Merrillville Office 9800 Connecticut Drive Suite Bl-508 Merrillville, IN 46307 Phone: 219.644.3692 Fax: 219.644.3682 NORTH CAROLINA Charlotte Office 2151 Hawkins Street Suite 201 Charlotte, NC 28203 Phone: 704.333.8360 Fax: 704.333.8362 IOWA ProMap Office 1531 Airport Road Suite 2 Ames, IA 50010 Phone: 515.233.3311 Fax: 515.233.4575 Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 Phone: 317.826.7100 Fax: 317.826.7200 August 2, 2005 Michael Fogarty Office of Police Chief Three Civic Square Carmel, IN 46032 RE: Grandin Hall, Section 1 Secondary Plat & Construction Plans TSC Job #5075.001 Dear Michael: One copy of the Secondary Plat & Construction Plans for Grandin Hall, Section 1 are enclosed. These plans will be reviewed at the August 17, 2005, Carmel TAC meeting. Please forward your review comments to me or call if you have any questions. Sincerely, J.~~ Project Engineer JCC/cct Enclosures ..,:~'.t ~ ~~;" ~:::~: }""ry,~;: www.schn_eideJcorp~C9m~~ r:\5k\5075\OOl \docs\tac080205.doc ~~ Schneider INDIANA Corporate Headquarters Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216 Phone: 317.826.7100 Toll-Free: 866.973.7100 Fax: 317.826.7200 Lafayette Office 3725 Rome Drive Park 26 Lafayette, IN 47905 Phone: 765.448.6661 Fax: 765.448.6665 Carmel Office 12821 E New Market Street Suite 100 Carmel. IN 46032 Phone: 317.569.8112 Fax: 317.826.6410 Avon Office Building 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Phone: 317.745.9926 Fax: 317.745.9973 Merrillville Office 9800 Connecticut Drive Suite Bl-508 Merrillville, IN 46307 Phone: 219.644.3692 Fax: 219.644.3682 NORTH CAROLINA Charlotte Office 2151 Hawkins Street Suite 201 Charlotte, NC 28203 Phone: 704.333.8360 Fax: 704.333.8362 IOWA ProMap Office 1531 Airport Road Suite 2 Ames, IA 50010 Phone: 515.233.3311 Fax: 515.233.4575 ~ V The Schneider Corporation Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 Phone: 317.826.7100 Fax: 317.826.7200 August 2, 2005 Ron Farrand Carmel/Clay Schools 5201 E. 131 st Street Carmel, IN 46033 RE: Grandin Hall, Section 1 Secondary Plat & Construction Plans TSC Job #5075.001 Dear Ron: One copy of the Secondary Plat & Construction Plans for Grandin Hall, Section 1 are enclosed. These plans will be reviewed at the August 17, 2005, Carmel TAC meeting. Please forward your review comments to me or call if you have any questions. Sincerely, ~~ ~roj~~ i~:i~~:.E . JCC/cct Enclosures , 't ",;::"'1~~~;.,{,~_:: w~w.s!=h-neid_ercorp:coffii'':i. r:\5k\50 7 5 \001 \docs \tac080205.doc ~~ Schneider INDIANA Corporate Headquarters Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216 Phone: 317.826.7100 Toll-Free: 866.973.7100 Fax: 317.826.7200 Lafayette Office 3725 Rome Drive Park 26 Lafayette, IN 47905 Phone: 765.448.6661 Fax: 765.448.6665 Carmel Office 12821 E New Market Street Suite 100 Carmel, IN 46032 Phone: 317.569.8112 Fax: 317.826.6410 Avon Office Building 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Phone: 317.745.9926 Fax: 317.745.9973 Merrillville Office 9800 Connecticut Drive Suite Bl-508 Merrillville, IN 46307 Phone: 219.644.3692 Fax: 219.644.3682 NORTH CAROLINA Charlotte Office 2151 Hawkins Street Suite 201 Charlotte, NC 28203 Phone: 704.333.8360 Fax: 704.333.8362 IOWA ProMap Office 1531 Airport Road Suite 2 Ames, IA 50010 Phone: 515.233.3311 Fax: 515.233.4575 w ~ The Schneider Corporation Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 Phone: 317.826.7100 Fax: 317.826.7200 August 2, 2005 Scott Brewer Carmel Department of Community Services One Civic Square Carmel, IN 46032 RE: Grandin Hall, Section 1 Secondary Plat & Construction Plans TSC Job #5075.001 Dear Scott: One copy of the Secondary Plat & Construction Plans for Grandin Hall, Section 1 are enclosed. These plans will be reviewed at the August 17, 2005, Carmel TAC meeting. Please forward your review comments to me or call if you have any questions. Sincerely, r4~ J.~crosby, p,V Project Engineer . JCC/cct Enclosures > ,_;~' -~. ;)1;:...:....;...www.sch.neidercorp.com.fli? r:\5k\50 7 5 \001 \docs \tac080205.doc ~~ Schneider INDIANA Corporate Headquarters Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216 Phone: 317.826.7100 TolI.Free: 866.973.7100 Fax: 317.826.7200 Lafayette Office 3725 Rome Drive Park 26 Lafayette, IN 47905 Phone: 765.448.6661 Fax: 765.448.6665 . Carmel Office 12821 E New Market Street Suite 100 Carmel, IN 46032 Phone: 317.569.8112 Fax: 317.826.6410 Avon Office Building 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Phone: 317.745.9926 Fax: 317.745.9973 Merrillville Office 9800 Connecticut Drive Suite Bl.508 Merrillville, IN 46307 Phone: 219.644.3692 Fax; 219.644.3682 NORTH CAROLINA Charlotte Office 2151 Hawkins Street Suite 201 Charlotte, NC 28203 Phone: 704.333.8360 Fax; 704.333.8362 IOWA ProMap Office 1531 Airport Road Suite 2 Ames, IA 50010 Phone: 515.233.3311 Fax: 515.233.4575 uW The Schneider Corporation Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216.1037 Phone: 317.826.7100 Fax: 317.826.7200 August 2, 2005 Gary Hoyt Office of Fire Chief, Fire Station #1 Two Civic Square Carmel, IN 46032 RE: Grandin Hall, Section 1 Secondary Plat & Construction Plans TSC Job #5075.001 \. Dear Gary: One copy of the Secondary Plat & Construction Plans for Grandin Hall, Section 1 are enclosed. These plans will be reviewed at the August 17, 2005, Carmel TAC meeting. Please forward your review comments to me or call if you have any questions. Sincerely, r4~~(~ J.~ Crosby, P.y>'" Project Engineer JCC/cct Enclosures ?~:~::~'~T:>;C!~",f ~~ www.schl)eidercorp.c~oml~ r:\5k\5075\OOl \docs\tac080205.doc ~~ Schneider ~ i...) The Schneider Corporation INDIANA Corporate Headquarters Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216 Phone: 317.826.7100 Toll-Free: 866.973.7100 Fax: 317.826.7200 Lafayette Office 3725 Rome Drive Park 26 Lafayette, IN 47905 Phone: 765.448.6661 Fax: 765.448.6665 Carmel Office 12821 E New Market Street Suite 100 Carmel, IN 46032 Phone: 317.569.8112 Fax: 317.826.6410 Avon Office Building 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Phone: 317.745.9926 Fax: 317.745.9973 Merrillville Office 9800 Connecticut Drive Suite 81-508 Merrillville, IN 46307 Phone: 219.644.3692 Fax: 219.644.3682 NORTH CAROLINA Charlotte Office 2151 Hawkins Street Suite 201 Charlotte, NC 28203 Phone: 704.333.8360 Fax: 704.333.8362 IOWA ProMap Office 1531 Airport Road Suite 2 Ames, IA 50010 Phone: 515.233.3311 Fax: 515.233.4575 Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 Phone: 317.826.7100 Fax: 317.826.7200 August 2, 2005 Mike McBride Dept. of Engineering One Civic Square Carmel, IN 46032 RE: Grandin Hall, Section 1 Secondary Plat & Construction Plans TSC Job #5075.001 Dear Mike: One copy of the Secondary Plat & Construction Plans for Grandin Hall, Section 1 are enclosed. These plans will be reviewed at the August 17, 2005, Carmel TAC meeting. Please forward your review comments to me or call if you have any questions. Sincerely, r4~(~ J. ~CroSbY, p,V Project Engineer JCC/cct Enclosures -.~/. '; -:< ~;J J:1www:schneidercorp:com)i r:\5k\5075\OOl \docs\tac080205.doc ~~ Schneider INDIANA Corporate Headquarters Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216 Phone: 317.826.7100 Toll-Free: 866.973.7100 Fax: 317.826.7200 Lafayette Office 3725 Rome Drive Park 26 Lafayette, IN 47905 Phone: 765.448.6661 Fax: 765.448.6665 Carmel Office 12821 E New Market Street Suite 100 Carmel, IN 46032 Phone: 317.569.8112 Fax: 317.826.6410 Avon Office Building 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Phone: 317.745.9926 Fax: 317.745.9973 Merrillville Office 9800 Connecticut Drive Suite Bl-508 Merrillville, IN 46307 Phone: 219.644.3692 Fax: 219.644.3682 NORTH CAROLINA Charlotte Office 2151 Hawkins Street Suite 201 Charlotte, NC 28203 Phone: 704.333.8360 Fax: 704.333.8362 IOWA ProMap Office 1531 Airport Road Suite 2 Ames, IA 50010 Phone: 515.233.3311 Fax: 515.233.4575 u u The Schneider Corporation Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 Phone: 317 .826. 7100 Fax: 317 .826. 7200 August 2, 2005 Brian Houghton Jones & Henry 2420 N. Coliseum Blvd. Ste. 214 Ft. Wayne, IN 46805 RE: Grandin Hall, Section 1 Secondary Plat & Construction Plans TSC Job #5075.001 Dear Brian: One copy of the Secondary Plat & Construction Plans for Grandin Hall, Section 1 are enclosed. These plans will be reviewed at the August 17, 2005, Carmel TAC meeting. Please forward your review comments to me or call if you have any questions. Sincerely, a<J~~( AI J.~Oro~bY,I'.V" Project Engineer JCC/cct Enclosures "-!;\'.,~z; :"'.",~' . www.schneidercorp.com~~ r:\5k\5075\OOl \docs\tac080205.doc ~~ Schneider INDIANA Corporate Headquarters Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216 Phone: 317.826.7100 Toll-Free: 866.973.7100 Fax: 317.826.7200 Lafayette Office 3725 Rome Drive Park 26 Lafayette, IN 47905 Phone: 765.448.6661 Fax: 765.448.6665 Carmel Office 12821 E New Market Street Suite 100 Carmel, IN 46032 Phone: 317.569.8112 Fax: 317.826.6410 Avon Office Building 1000 5250 E US Highway 36 Suite 250 Avon. IN 46123 Phone: 317.745.9926 Fax: 317.745.9973 Merrillville Office 9800 Connecticut Drive Suite Bl-508 Merrillville, IN 46307 Phone: 219.644.3692 Fax: 219.644.3682 NORTH CAROLINA Charlotte Office 2151 Hawkins Street Suite 201 Charlotte, NC 28203 Phone: 704.333.8360 Fax: 704.333.8362 IOWA ProMap Office 1531 Airport Road Suite 2 Ames, IA 50010 Phone: 515.233.3311 Fax: 515.233.4575 U l.) The Schneider Corporation Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 Phone: 317.826.7100 Fax: 317.826.7200 August 2, 2005 Greg Cammack SSC 5858 N. College Ave Indianapolis, IN 46220 RE: Grandin Hall, Section 1 Secondary Plat & Construction Plans TSC Job #5075.001 Dear Greg: One copy of the Secondary Plat & Construction Plans for Grandin Hall, Section 1 are enclosed. These plans will be reviewed at the August 17, 2005, Carmel TAC meeting. Please forward your review comments to me or call if you have any questions. Sincerely, t7<J~( A' J,~CrdSbY. P,y Project Engineer JCC/cct Enclosures ~~~~'-}t:,~r~ci'~J j:~=>",&;~"www.schneidercoip:com~ r: \5k\50 7 5\001 \docs \tac080205.doc ~~ Schneider INDIANA Corporate Headquarters Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216 Phone: 317 .826. 7100 Toll-Free: 866.973.7100 Fax: 317.826.7200 Lafayette Office 3725 Rome Drive Park 26 Lafayette, IN 47905 Phone: 765.448.6661 Fax: 765.448.6665 Carmel Office 12821 E New Market Street Suite 100 Carmel, IN 46032 Phone: 317.569.8112 Fax: 317.826.6410 Avon Office Building 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Phone: 317.745.9926 Fax: 317.745.9973 Merrillville Office 9800 Connecticut Drive Suite Bl-508 Merrillville, IN 46307 Phone: 219.644.3692 Fax: 219.644.3682 NORTH CAROLINA Charlotte Office 2151 Hawkins Street Suite 201 Charlotte, NC 28203 Phone: 704.333.8360 Fax: 704.333.8362 IOWA ProMap Office 1531 Airport Road Suite 2 Ames, IA 50010 Phone: 515.233.3311 Fax: 515.233.4575 v U The Schneider Corporation Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 Phone: 317.826.7100 Fax: 317.826.7200 August 2, 2005 L. Joe Cook Hamilton County Sheriffs Dept. 18100 Cumberland Rd. Noblesville, IN 46060 RE: Grandin Hall, Section 1 Secondary Plat & Construction Plans TSC Job #5075.001 Dear Joe: One copy of the Secondary Plat & Construction Plans for Grandin Hall, Section 1 are enclosed. These plans will be reviewed at the August 17, 2005, Carmel TAC meeting. Please forward your review comments to me or call if you have any questions. Sincerely, r4~~( ~ J.~CroSbY! p.0. Project Engineer JCC/cct Enclosures . :;::"','1 'J;' .,,~,-.,,:wwVll.schneidercorp:com~ r: \5k\50 7 5\00 1 \docs \tac080205.doc , .. ~~ Schneider INDIANA Corporate Headquarters Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216 Phone: 317,826.7100 Toll-Free: 866.973.7100 Fax: 317,826.7200 Lafayette Office 3725 Rome Drive Park 26 Lafayette, IN 47905 Phone: 765.448.6661 Fax: 765.448.6665 Carmel Office 12821 E New Market Street Suite 100 Carmel, IN 46032 Phone: 317.569.8112 Fax: 317.826,6410 Avon Office Building 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Phone: 317.745.9926 Fax: 317.745.9973 Merrillville Office 9800 Connecticut Drive Suite Bl-508 Merrillville, IN 46307 Phone: 219.644.3692 Fax: 219.644.3682 NORTH CAROLINA CharlQtte Office 2151 Hawkins Street Suite 201 Charlotte, NC 28203 Phone: 704.333.8360 Fax: 704.333.8362 IOWA ProMap Office 1531 Airport Road Suite 2 Ames, IA 50010 Phone: 515.233.3311 Fax: 515.233.4575 v I...,) The Schneider Corporation Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 Phone: 317,826,7100 Fax: 317.826.7200 August 2, 2005 Dave Klingensmith Carmel Street Dept. 211 Second Street SW Carmel, IN 46032 RE: Grandin Hall, Section 1 Secondary Plat & Construction Plans TSC Job #5075.001 Dear Dave : One copy of the Secondary Plat & Construction Plans for Grandin Hall, Section 1 are enclosed. These plans will be reviewed at the August 17, 2005, Carmel TAC meeting. Please forward your review comments to me or call if you have any questions. Sincerely, J.~~ Project Engineer JCC/cct Enclosures ~''', . ":1;',uiJ" '37"", www.s.chrieidercorp.com"tjl r:\5k\50 7 5\00 1 \docs \tac080205.doc v. ,~ ~~ Schneider u V The Schneider Corporation INDIANA Corporate Headquarters Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216 Phone: 317.826.7100 Toll-Free: 866.973.7100 Fax: 317.826.7200 Lafayette Office 3725 Rome Drive Park 26 Lafayette, IN 47905 Phone: 765.448.6661 Fax: 765.448.6665 Carmel Office 12821 E New Market Street Suite 100 Carmel, IN 46032 Phone: 317.569.8112 Fax: 317.826.6410 Avon Office 8uilding 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Phone: 317.745.9926 Fax: 317.745.9973 Merrillville Office 9800 Connecticut Drive Suite 81-508 Merri/lvi/le, IN 46307 Phone: 219.644.3692 Fax: 219.644.3682 NORTH CAROLINA Charlotte Office 2151 Hawkins Street Suite 201 Charlotte, NC 28203 Phone: 704.333.8360 Fax: 704.333.8362 IOWA ProMap Office 1531 Airport Road Suite 2 Ames, IA 50010 Phone: 515.233.3311 Fax: 515.233.4575 Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 Phone: 317.826.7100 Fax: 317.826.7200 August 2, 2005 Jason LeMaster Hamilton County Health Dept. One Hamilton Square, Ste. 30 Noblesville, IN 46060 RE: Grandin Hall, Section 1 Secondary Plat & Construction Plans TSC Job #5075.001 Dear Jason: One copy of the Secondary Plat & Construction Plans for Grandin Hall, Section 1 are enclosed. These plans will be reviewed at the August 17, 2005, Carmel TAC meeting. Please forward your review comments to me or call if you have any questions. Sincerely, ~~ ~roj~~~~:'~~e~ .~ JCC/cct Enclosures . "'i-';~\'!;'~'i'" ';:}www.schneidercorp:com;i2 r:\5k\5075\OOl \docs\tac080205.doc