Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
CPC-Pavilion_Permit Set_20220620_Sheet-A.400
A.4001234A.4008567MEN'SA04WOMEN'SA0312' - 0 1/4"11' - 10 1/2"14' - 3"3' - 0"3' - 0"3' - 0"5' - 0"5' - 0"3' - 0"14' - 3"7"5' - 0"5' - 0"2 ' - 6 "2' - 6"SE8SE9SE9SE9SE2SE1SE3SE4SE5SE7SE1SE8SE7SE1SE9SE4SE5SE3SE6SE1SE222.0122.0222.0222.0222.021' - 6"22.0222.0222.0322.0422.0409.0009.00A03A041' - 6"1' - 6"1' - 6"1' - 6"SE611 3/4"11 3/4"SE1SE1SE2SE21' - 6"6"1' - 6"2' - 0"2' - 0"22.0122.03SE10SE11SE11SE6ASE6AMEN'SA0422.0122.02SE3SE5SE4SE83' - 0"3' - 2"9' - 0"8 1/2"1' - 6"5' - 0"2' - 10"09.021' - 6"2' - 3"SE11WP-13' - 0"3' - 3"MEN'SA0422.0222.0222.031' - 6"6"3' - 0"SE1SE8SE9SE1SE75' - 0"3' - 0"9' - 0"09.0222.021' - 6"2' - 9"1' - 6"1' - 6"SE6WP-122.03MEN'SA049' - 0"09.0222.021' - 6"A04WP-1MEN'SA042' - 10"SE3SE422.01SE59' - 0"09.02WP-126.01WOMEN'SA0322.0122.02SE3SE4SE5SE82' - 10"3' - 0"3' - 2"1' - 6"3' - 0"9' - 0"09.021' - 6"SE72' - 9"2' - 3"SE11WP-13' - 3"WOMEN'SA03SE3SE4SE522.012' - 10"9' - 0"09.02WP-122.02SE2SE1SE9WOMEN'SA035' - 0"9' - 0"09.021' - 6"A03WP-126.0122.0222.0222.0222.02SE1SE6SE7SE1SE1SE1SE9SE9SE8WOMEN'SA035' - 0"3' - 0"3' - 0"3' - 0"6"2' - 9"9' - 0"09.021' - 6"3' - 0"1' - 6"1' - 6"1' - 6"1' - 6"WP-1ASPEN PROJECT #:SEAL:9645 Lincoln-Way Lane Suite 201 Frankfort, IL. 60423PRE-GP/PERMIT SETCOPYRIGHT ASPEN GROUP INC. USE OF THESE DOCUMENTS SHALL BE RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE PREPARED, PUBLICATION THEREOF IS EXPRESSLY LIMITED TO SUCH USE. RE-USE, REPRODUCTION, OR PUBLICATION IN WHOLE OR IN PART IS PROHIBITED. READ DIMENSIONS. DO NOT SCALE DRAWINGS. REPORT ANY INCONSISTENCIES TO THE ARCHITECT IMMEDIATELY. EXPIRES:6/22/2022 3:50:32 PMCollege Park Church -Outdoor Pavilion07-00552606 West 96th Street, Indianapolis, INA.400ENLARGED RESTROOMSPLANS & INTERIORELEVATIONS3/8" = 1'-0"AENLARGED PLAN - RESTROOMS3/8" = 1'-0"1MEN'S RR WEST ELEVATION3/8" = 1'-0"2MEN'S RR NORTH ELEVATION3/8" = 1'-0"3MEN'S RR EAST ELEVATION3/8" = 1'-0"4MEN'S RR SOUTH ELEVATION3/8" = 1'-0"5WOMEN'S RR WEST ELEVATION3/8" = 1'-0"6WOMEN'S RR NORTH ELEVATION3/8" = 1'-0"7WOMEN'S RR EAST ELEVATION3/8" = 1'-0"8WOMEN'S RR SOUTH ELEVATIONSPECIALTY ACCESSORY SCHEDULEMARK COUNT DESCRIPTION MANUFACTURER/MODELSE1 6 Toilet Paper Dispenser Bradley Corporation, 5402SE2 4 Sanitary Napkin Trash Bradley Corporation, 4A10SE3 2 Hand Dryer Excel DryerSE4 2 Manual Soap Dispenser Bradley Corporation, 6572SE5 2 Channel Frame Mirror Bradley Corporation, 18" x 36"SE6 2 Stainless Steel Grab Bars, 42" Bradley CorporationSE6A 2 Stainless Steel Grab Bars, 18" Bradley CorporationSE7 2 Stainless Steel Grab Bars, 36" Bradley CorporationSE8 2 Toilet Partitions, ADA ASI, HDPE, Floor Mounted Partitions, Charcoal, OR EQUAL.SE9 4 Toilet Partitions ASI, HDPE, Floor Mounted Partitions, Charcoal, OR EQUAL.SE10 1 Urinal Partition ASI, HDPE, 58", Charcoal, OR EQUAL.SE11 2 Baby Changing Station Koala Kare, KB300-SS Horizontal Surface-Mounted With StainlessSteel VeneerRESTROOM NOTESDIVISION 09 - FINISHES09.00 UNFINISHED CONCRETE FLOOR09.02 PROVIDE AND INSTALL L-SHAPED FINISHINGPROFILE BASE, WIDE.DIVISION 22 - PLUMBING22.01 ADA COMPLIANT PEDESTAL SINK WITH HOLDDOWN FAUCET SUCH AS: ZURN Z86100-XL DECKMOUNT SINGLE BASIN METERING FAUCET, ADACOMPLIANT.22.02 FLOOR MOUNTED TOILET FIXTURE.22.03 WALL MOUNTED URINAL.22.04 FLOOR DRAIN BY PLUMBING.DIVISION 26 - ELECTRICAL26.01 CEILING MOUNTED SPACE HEATER.WALL FINISH SCHEDULEMARK MANUFACTURER STYLE COLOR DESCRIPTION FLAMMABILITYST-1 BEUCHEL STONE CASTLE ROCK FOND DU LACWP-1 FIBO SYSTEMS CRESCENDO WALL PANEL BLANCO GRANDE WALL SYSTEM WITH 24 X 12 TILE LOOK. FLOORTO CEILING INSTALLATION. PROVIDE "L" BASEWHERE PANEL MEETS CONCRETE FLOOR.PROVIDE ALL NECESSARY CORNER TRIM PIECES.CLASS 1WP-2 TBD HORIZONTAL LAP SIDINGTO MATCH EXTERIORLIGHT FINISH TBD,PAINTED.12" H PLANKSCLASS 1WP-3 TBD HORIZONTAL LAP SIDING WOOD FINISH, TBD 12" H PLANKSCLASS 1REVISIONSNo. Date By DescriptionA 06/ 20/ 2022 Pre-GP / Permit Set