Loading...
HomeMy WebLinkAboutCPC-Pavilion_Permit Set_20220620_Sheet-A.6002"1' - 6 1/4"1' - 9 1/4"1' - 9 1/4"1' - 9 1/4"1' - 7 3/4"1' - 7 3/4"1' - 8 1/2"2"1' - 0"2"3' - 0"2"1' - 0"2"5' - 8"12' - 0"7' - 0"12' - 0"7' - 0"2"1' - 6 1/4"1' - 9 3/4"1' - 9"1' - 9"1' - 9"1' - 9"1' - 4"2"3' - 4"2"3' - 5"2"3' - 5"2"3' - 0"2"14' - 0"SEE SCHEDULESEE SCHEDULESEE SCHEDULE2" 2"2"SEE SCHD.D1F1 F2SEE SCHEDULE2" 2"2"SEE SCHD.SEE SCHEDULESEE SCHEDULE2"1' - 6 3/4"1' - 7 3/4"1' - 7 3/4"1' - 9 1/4"1' - 9 1/4"1' - 9 1/4"1' - 6 1/4"2"12' - 0"2"1' - 8"2"3' - 0"2"1' - 8"2"7' - 0"7' - 0"1.CONTRACTOR TO COORDINATE SIZE OF DOOR FRAMES UNCLUDING HEIGHT, WIDTH AND JAMB WIDTH WITH WALL TYPE AND FIRE RATING.2.CONTRACTOR TO COORDINATE DOOR HAND (SWING) WITH FLOOR PLAN.3.ALL THRESHOLDS TO BE ADA COMPLIANT.4.SUBMIT TRANSITITION STRIPS TO ARCHITECT FOR APPROVAL.5.ALL HOLLOW METAL DOORS AND FRAMES TO BE PAINTED BENJAMIN MOORE, BLACK. DOOR SCHEDULE NOTES:AL=ALUMINUMAL/GL=ALUMINUM AND GLASSHM=HOLLOW METALWD=SOLID CORE WOODWD/GL=SOLID CORE WOOD AND GLASSABBREVIATIONS:ASPEN PROJECT #:SEAL:9645 Lincoln-Way Lane Suite 201 Frankfort, IL. 60423PRE-GP/PERMIT SETCOPYRIGHT ASPEN GROUP INC. USE OF THESE DOCUMENTS SHALL BE RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE PREPARED, PUBLICATION THEREOF IS EXPRESSLY LIMITED TO SUCH USE. RE-USE, REPRODUCTION, OR PUBLICATION IN WHOLE OR IN PART IS PROHIBITED. READ DIMENSIONS. DO NOT SCALE DRAWINGS. REPORT ANY INCONSISTENCIES TO THE ARCHITECT IMMEDIATELY. EXPIRES:6/22/2022 3:51:09 PMCollege Park Church -Outdoor Pavilion07-00552606 West 96th Street, Indianapolis, INA.600SCHEDULESDOOR SCHEDULEDOORFIRERATINGFRAMEHardwareGroupCOMMENTSMARK WIDTH HEIGHT MATERIAL ELEVATIONDOORFINISHMATERIAL ELEVATION FINISH102 3' - 0" 7' - 0" HM D1 FACTORY HM F1 PAINTED 2103 3' - 0" 7' - 0" HM D1 FACTORY HM F1 PAINTED 2104 6' - 0" 7' - 0" HM D1 FACTORY HM F2 FACTORY 2105 3' - 0" 7' - 0" AL/GL A1 FACTORY AL AL FACTORY 4106 3' - 0" 7' - 0" AL/GL A2 FACTORY AL AL FACTORY 4107 3' - 0" 7' - 0" AL/GL A2 FACTORY AL AL FACTORY 4108 3' - 0" 7' - 0" AL/GL A1 FACTORY AL AL FACTORY 4109 3' - 0" 7' - 0" AL/GL A3 FACTORY AL AL FACTORY 4A03 3' - 0" 7' - 0" HM D1 FACTORY HM F1 FACTORY 3A04 3' - 0" 7' - 0" HM D1 FACTORY HM F1 FACTORY 3G100 14' - 0" 12' - 0" AL/GL G1 FACTORY AL G1 FACTORY -G101 14' - 0" 12' - 0" AL/GL G1 FACTORY AL G1 FACTORY -G102 14' - 0" 12' - 0" AL/GL G1 FACTORY AL G1 FACTORY -G103 14' - 0" 12' - 0" AL/GL G1 FACTORY AL G1 FACTORY -G104 14' - 0" 12' - 0" AL/GL G1 FACTORY AL G1 FACTORY -G105 9' - 0" 12' - 0" AL/GL G1 FACTORY AL G1 FACTORY -G106 9' - 0" 12' - 0" AL/GL G1 FACTORY AL G1 FACTORY -G107 9' - 0" 12' - 0" AL/GL G1 FACTORY AL G1 FACTORY -G108 9' - 0" 12' - 0" AL/GL G1 FACTORY AL G1 FACTORY -G109 14' - 0" 12' - 0" AL/GL G1 FACTORY AL G1 FACTORY -G110 14' - 0" 12' - 0" AL/GL G1 FACTORY AL G1 FACTORY -G111 12' - 6" 5' - 0" AL/GL G1 FACTORY AL G1 FACTORY -A1A3G1A2HARDWAREKeyNameLock FunctionHardware Hinge SetEgressHardwareCloser Stop Kickplates Hold Open-1 CLASSROOM LEVER/LEVERYes Yes Yes2 STOREROOM LEVER/LEVERYes3 PRIVACY LEVER/LEVERYes Yes4 EGRESS-PASSAGE LEVER/LEVERYes5 EGRESS-PASSAGE RATED PANIC/PUSH-PULLYes Yes Yes YesREVISIONSNo. Date By DescriptionA 06/ 20/ 2022 Pre-GP / Permit Set