HomeMy WebLinkAboutA00832
72
32
28
T/JOIST LEDGE
= -6 12" (EL.=845.92)
MASTER SUITE FLOOR
= +1 1 " (EL.=846.83')1 2'-012"9
5.1
MATCH LINE1 2
8
S1
S4
S4
8'-0" HEAD
HEIGHT A.F.F.
CUSTOM DOOR TO
MATCH HOUSE SIDING
B/ FOOTING MIN. 48" BELOW
GRADE OR TO
UNDISTURBED SOIL
9'-0" HEAD HEIGHT
1 2'-4" PLATE
HEIGHT
TOP OF FOUNDATION
STONE LEDGE
4"
A-A
A1 .3
A-A
B1 .2
T/ FOUNDATION SLAB@
MASTER=-1 2'-7"
(EL. 833.33)MATCH LINE1 2
8
28
48 7'-0"T/JOIST LEDGE
= -6 12" (EL.=845.92)
MASTER SUITE FLOOR
= +1 1 " (EL.=846.83')
T/ FOUNDATION SLAB@
MASTER=-1 2'-7"
(EL. 833.33)
1 2 3
STUDY DOG ROOM
1 6'-0"
8'-2" 2'-6"
6C
5.1
4'-2"
R1
R3
R3
S1
S4
S5
S5
S5
CUSTOM STEEL
AWNING
3'-0"
1 0'-2" HD. HT.
1 5'-8" PLATE HEIGHT
SPA
1 1 '-2"
CEILING
9'-0" HD. HT.9'-8" PLT. HT.
9'-0" HD. HT.7"7"7'-0" HD. HT.
ALIGN
9'-0" HEAD HEIGHT
9'-6" PLATE HEIGHT
LIVEROOF DEEP GREEN
ROOF SYSTEM
METAL STEP FLASHING, TYP.
4X6 PURLINS ON
4X8 WOOD RAFTER TAILS
B/ FOOTING MIN. 48" BELOW
GRADE OR TO
UNDISTURBED SOIL
T T
8
5.1
28
46
2'-4"
1 2
8
28
48
32
72 7'-0"8'-2" 2'-6"
42
84
90
84MATCH LINER1
R3
R3
S1
S1
S2
S4
S4
S5
S5
S5
REFLECTING POOL
TOP OF FOUNDATION
STONE LEDGE
9'-0" CEILING HEIGHT
8'-0" HEAD HEIGHT
S41 '-0"
S4
4X6 PURLINS ON
4X8 WOOD RAFTER TAILS
T/JOIST LEDGE
= -6 12" (EL.=845.92)
MASTER SUITE FLOOR
= +1 1 " (EL.=846.83')1 2'-012"S2
9'-0" HD. HT.
4"4"1 0"1 '-0"4'-1 0"2'-4"1 0'-2" HEAD HEIGHT
1 7'-8"
HD. HT.
1 5'-8"
PLT. HT.
1 2 3
T T
T/ FOUNDATION SLAB@
MASTER=-1 2'-7"
(EL. 833.33)
8
5.1
32
72
32
72
42
1 22
T T 42
1 22
28
46
32
72
32
72
28
46
1 1 '-0"1 0'-2"
3
5.1 MATCH LINE5
5.1
2'-4"
4
5.1
1 2
8
T/JOIST LEDGE
= -6 12" (EL.=845.92)
MASTER SUITE FLOOR
= +1 1 " (EL.=846.83')
T/ FOUNDATION SLAB @ MASTER
=-1 2'-7" (EL. 833.33)1 2'-012"28
60
28
60
6C
5.1
7'-0"8'-2"2'-6" 3'-0"R1
S1
S2
S4S4S4S5
S5
S5
S5
B/ FOOTING MIN. 48"
BELOW GRADE OR TO
UNDISTURBED SOIL
1 0'-0" HEAD HEIGHT
1 0'-6" PLATE HEIGHT
8'-0" HEAD
HEIGHT
8'-0" HD. HT.
STEPPED
WINDOW WELL
BEYOND4"4"1 '-6"
2" 5'-2" 2"
THRU WALL METAL FLASHING, TYP.
CUSTOM METAL CHIMNEY CAP
METAL STEP FLASHING, TYP.
LIVEROOF DEEP GREEN
ROOF SYSTEM
S1
A-A
A1 .3
A-A
B1 .2
T T
T
E
1 0'-2" HEAD HEIGHT
1 7'-8" HEAD HEIGHT
SIM.
EE
1 5'-8" PLATE HEIGHT
32
72
32
72
32
72
32
72
32
72
32
72
32
72
32
72
32
72
32
72
32
72
32
72
32
72
32
72
32
72
32
72
32
72
32
72
BACK PAINT GLASS
9
5.1
1 2
8
S1
S4
S5
8'-0" HEAD
HEIGHT A.F.F.1 0"
T/JOIST LEDGE
= -6 12" (EL.=845.92)
MASTER SUITE FLOOR
= +1 1 " (EL.=846.83')
T/ FOUNDATION SLAB@ MASTER
=-1 2'-7" (EL. 833.33)1 2'-012"REFLECTING POOL
TOP OF FOUNDATION
STONE LEDGE
9'-0" CEILING HEIGHT
1 2'-4" PLATE HEIGHT
1 '-2"1 "5'-5"2"1 '-6"1 '-8"
METAL STEP FLASHING, TYP.9'-0"4'-6"
4'-0"1 '-1 0" 2'-8" 4"
CUSTOM DOOR TO MATCH
HOUSE SIDING
8'-0" HEAD HEIGHT
S4
2"
A-A
A1 .3
A-A
B1 .2
T
EXTERIOR MATERIALS SCHEDULE
TAG BASE BID BASE BID NOTES ALTERNATE BID ALTERNATE NOTES
ROOFING
R1 ASPHALT SHINGLE GAF TIMBERLINE HD
ARCHITECTURAL SERIES
R2 1 6" STANDING SEAM
METAL REVERE FREEDOM GRAY BERRIDGE ALUMINUM WITH KYNAR
FINISH WEATHERED ZINC
R3 1 6" SOLDER SEAM REVERE FREEDOM GRAY BERRIDGE 90° ZEE LOCK PANELS
FOR LOW SLOPES ZINC COTE
GUTTERS, DOWNSPOUTS, COPINGS & FLASHING (TYPICAL AT ALL LOCATIONS UNLESS NOTED OTHERWISE)
G1 FLASHING, COPINGS, ECT. REVERE FREEDOM GRAY BERRIDGE ALUMINUM WITH KYNAR
FINISH WEATHERED ZINC
G2 6" HALF ROUND GUTTERS &
6" DOWNSPOUTS REVERE FREEDOM GRAY BERRIDGE ALUMINUM WITH KYNAR
FINISH WEATHERED ZINC
SIDING AND VENEERS
S1 STONE VENEER CUSTOM LIMESTONE MIX
FROM STONE CENTER
S2 VERTICAL CEDAR1 X8T&G
WITH 14" REVEAL
FAH THERMALLY MODIFIED
OAK SMOOTH FACE CEDAR -
S3 HORIZONTAL CEDAR1 X8
T&G WITH 14 " REVEAL
FAH THERMALLY MODIFIED
OAK SMOOTH FACE CEDAR -
S4 CUT STONE SMOOTH FINISHED INDIANA
LIMESTONE
S5 PAINTED STEEL
WINDOWS AND DOORS (TYPICAL AT ALL LOCATIONS UNLESS NOTED OTHERWISE)
W1 MHB STEEL REMBRANDT #4 FINISH COLOR TO MATCH MAVIN
W2 MARVIN MODERN BRONZE MARVIN ULTIMATE BRONZE
MISCELLANEOUS
M1 - -- -
REFER TO GENERAL PERFORMANCE SPECIFICATIONS FOR PRODUCT AND ASSEMBLY REQUIREMENTS. ANY SUBSTITUTIONS TO BE
BROUGHT TO ATTENTION OF ARCHITECT
A-A
A1 .3
A-A
B1 .2
DOCUMENT:DRAWN BY:CHECKED:MA1 4 8 B u r l i n g t o n A v e n u eC l a r e n d o n H i l l s I l l i n o i s 6 0 5 1 4P 6 3 0 . 6 5 5 . 9 4 1 7PROJECT NO:21017MICHAEL ABRAHAMA R C H I T E C T U R Em i c h a e l - a b r a h a m . c o mSycamore Creek Residence10404 Ditch RoadCarmel, INIssued For Permit 06.08.22BBb1.1Master Suite North and SouthElevations and SectionsELEVATION NOTES:
HEAD HEIGHTS NOTED ARE FROM TOP OF UNIT TO TOP OF
FINISH FLOOR. COORDINATE ROUGH OPENING RECOMMENDED
BY MANUFACTURER WITH TOP OF UNIT HEAD HEIGHT.
WINDOW SHOP DRAWINGS TO BE SUBMITTED TO ARCHITECT
FOR DESIGN REVIEW.
ANY OPERABLE WINDOWS LOCATED 6'-0" ABOVE FINISHED
GRADE AND LESS THAN 24" INCHES ABOVE ADJACENT
INTERIOR FLOOR MUST BE EQUIPPED WITH A WINDOW OPENING
CONTROL DEVICE THAT LIMITS THE INITIAL WINDOW OPENING
TO NO MORE THAN 4 INCHES.
PROVIDE TEMPERED GLAZING WHEN WITHING 24” OF
DOORS, ADJACENT TO TUBS AND STAIRS, SHOWER
ENCLOSURES, GLAZING WITHIN 1 8" OF THE FINISHED FLOOR
AND OTHER REQUIRED AREAS AS PER THE IRC. ALL SAFETY
GLASS SHALL BE PERMANENTLY LABELED.
DOOR AND WINDOW SIZES AS FOLLOWS: CASEMENT
WINDOWS LISTED AS FRAME SIZE IN INCHES DOUBLE HUNG
WINDOWS LISTED AS GLASS SIZE IN INCHES.
TIE DOWNSPOUTS INTO DRAINAGE SYSTEM
MASTER SUITE SOUTH ELEVATION
SCALE: 1 /4" = 1 '-0"
MASTER SUITE BUILDING SECTION C-C
SCALE: 1 /4" = 1 '-0"
MASTER SUITE BUILDING SECTION B-B
SCALE: 1 /4" = 1 '-0"
MASTER SUITE NORTH ELEVATION
SCALE: 1 /4" = 1 '-0"
MASTER SUITE NORTH BUIDLING SECTION A-A
SCALE: 1 /4" = 1 '-0"
08/09/22