Loading...
HomeMy WebLinkAboutA00832 72 32 28 T/JOIST LEDGE = -6 12" (EL.=845.92) MASTER SUITE FLOOR = +1 1 " (EL.=846.83')1 2'-012"9 5.1 MATCH LINE1 2 8 S1 S4 S4 8'-0" HEAD HEIGHT A.F.F. CUSTOM DOOR TO MATCH HOUSE SIDING B/ FOOTING MIN. 48" BELOW GRADE OR TO UNDISTURBED SOIL 9'-0" HEAD HEIGHT 1 2'-4" PLATE HEIGHT TOP OF FOUNDATION STONE LEDGE 4" A-A A1 .3 A-A B1 .2 T/ FOUNDATION SLAB@ MASTER=-1 2'-7" (EL. 833.33)MATCH LINE1 2 8 28 48 7'-0"T/JOIST LEDGE = -6 12" (EL.=845.92) MASTER SUITE FLOOR = +1 1 " (EL.=846.83') T/ FOUNDATION SLAB@ MASTER=-1 2'-7" (EL. 833.33) 1 2 3 STUDY DOG ROOM 1 6'-0" 8'-2" 2'-6" 6C 5.1 4'-2" R1 R3 R3 S1 S4 S5 S5 S5 CUSTOM STEEL AWNING 3'-0" 1 0'-2" HD. HT. 1 5'-8" PLATE HEIGHT SPA 1 1 '-2" CEILING 9'-0" HD. HT.9'-8" PLT. HT. 9'-0" HD. HT.7"7"7'-0" HD. HT. ALIGN 9'-0" HEAD HEIGHT 9'-6" PLATE HEIGHT LIVEROOF DEEP GREEN ROOF SYSTEM METAL STEP FLASHING, TYP. 4X6 PURLINS ON 4X8 WOOD RAFTER TAILS B/ FOOTING MIN. 48" BELOW GRADE OR TO UNDISTURBED SOIL T T 8 5.1 28 46 2'-4" 1 2 8 28 48 32 72 7'-0"8'-2" 2'-6" 42 84 90 84MATCH LINER1 R3 R3 S1 S1 S2 S4 S4 S5 S5 S5 REFLECTING POOL TOP OF FOUNDATION STONE LEDGE 9'-0" CEILING HEIGHT 8'-0" HEAD HEIGHT S41 '-0" S4 4X6 PURLINS ON 4X8 WOOD RAFTER TAILS T/JOIST LEDGE = -6 12" (EL.=845.92) MASTER SUITE FLOOR = +1 1 " (EL.=846.83')1 2'-012"S2 9'-0" HD. HT. 4"4"1 0"1 '-0"4'-1 0"2'-4"1 0'-2" HEAD HEIGHT 1 7'-8" HD. HT. 1 5'-8" PLT. HT. 1 2 3 T T T/ FOUNDATION SLAB@ MASTER=-1 2'-7" (EL. 833.33) 8 5.1 32 72 32 72 42 1 22 T T 42 1 22 28 46 32 72 32 72 28 46 1 1 '-0"1 0'-2" 3 5.1 MATCH LINE5 5.1 2'-4" 4 5.1 1 2 8 T/JOIST LEDGE = -6 12" (EL.=845.92) MASTER SUITE FLOOR = +1 1 " (EL.=846.83') T/ FOUNDATION SLAB @ MASTER =-1 2'-7" (EL. 833.33)1 2'-012"28 60 28 60 6C 5.1 7'-0"8'-2"2'-6" 3'-0"R1 S1 S2 S4S4S4S5 S5 S5 S5 B/ FOOTING MIN. 48" BELOW GRADE OR TO UNDISTURBED SOIL 1 0'-0" HEAD HEIGHT 1 0'-6" PLATE HEIGHT 8'-0" HEAD HEIGHT 8'-0" HD. HT. STEPPED WINDOW WELL BEYOND4"4"1 '-6" 2" 5'-2" 2" THRU WALL METAL FLASHING, TYP. CUSTOM METAL CHIMNEY CAP METAL STEP FLASHING, TYP. LIVEROOF DEEP GREEN ROOF SYSTEM S1 A-A A1 .3 A-A B1 .2 T T T E 1 0'-2" HEAD HEIGHT 1 7'-8" HEAD HEIGHT SIM. EE 1 5'-8" PLATE HEIGHT 32 72 32 72 32 72 32 72 32 72 32 72 32 72 32 72 32 72 32 72 32 72 32 72 32 72 32 72 32 72 32 72 32 72 32 72 BACK PAINT GLASS 9 5.1 1 2 8 S1 S4 S5 8'-0" HEAD HEIGHT A.F.F.1 0" T/JOIST LEDGE = -6 12" (EL.=845.92) MASTER SUITE FLOOR = +1 1 " (EL.=846.83') T/ FOUNDATION SLAB@ MASTER =-1 2'-7" (EL. 833.33)1 2'-012"REFLECTING POOL TOP OF FOUNDATION STONE LEDGE 9'-0" CEILING HEIGHT 1 2'-4" PLATE HEIGHT 1 '-2"1 "5'-5"2"1 '-6"1 '-8" METAL STEP FLASHING, TYP.9'-0"4'-6" 4'-0"1 '-1 0" 2'-8" 4" CUSTOM DOOR TO MATCH HOUSE SIDING 8'-0" HEAD HEIGHT S4 2" A-A A1 .3 A-A B1 .2 T EXTERIOR MATERIALS SCHEDULE TAG BASE BID BASE BID NOTES ALTERNATE BID ALTERNATE NOTES ROOFING R1 ASPHALT SHINGLE GAF TIMBERLINE HD ARCHITECTURAL SERIES R2 1 6" STANDING SEAM METAL REVERE FREEDOM GRAY BERRIDGE ALUMINUM WITH KYNAR FINISH WEATHERED ZINC R3 1 6" SOLDER SEAM REVERE FREEDOM GRAY BERRIDGE 90° ZEE LOCK PANELS FOR LOW SLOPES ZINC COTE GUTTERS, DOWNSPOUTS, COPINGS & FLASHING (TYPICAL AT ALL LOCATIONS UNLESS NOTED OTHERWISE) G1 FLASHING, COPINGS, ECT. REVERE FREEDOM GRAY BERRIDGE ALUMINUM WITH KYNAR FINISH WEATHERED ZINC G2 6" HALF ROUND GUTTERS & 6" DOWNSPOUTS REVERE FREEDOM GRAY BERRIDGE ALUMINUM WITH KYNAR FINISH WEATHERED ZINC SIDING AND VENEERS S1 STONE VENEER CUSTOM LIMESTONE MIX FROM STONE CENTER S2 VERTICAL CEDAR1 X8T&G WITH 14" REVEAL FAH THERMALLY MODIFIED OAK SMOOTH FACE CEDAR - S3 HORIZONTAL CEDAR1 X8 T&G WITH 14 " REVEAL FAH THERMALLY MODIFIED OAK SMOOTH FACE CEDAR - S4 CUT STONE SMOOTH FINISHED INDIANA LIMESTONE S5 PAINTED STEEL WINDOWS AND DOORS (TYPICAL AT ALL LOCATIONS UNLESS NOTED OTHERWISE) W1 MHB STEEL REMBRANDT #4 FINISH COLOR TO MATCH MAVIN W2 MARVIN MODERN BRONZE MARVIN ULTIMATE BRONZE MISCELLANEOUS M1 - -- - REFER TO GENERAL PERFORMANCE SPECIFICATIONS FOR PRODUCT AND ASSEMBLY REQUIREMENTS. ANY SUBSTITUTIONS TO BE BROUGHT TO ATTENTION OF ARCHITECT A-A A1 .3 A-A B1 .2 DOCUMENT:DRAWN BY:CHECKED:MA1 4 8 B u r l i n g t o n A v e n u eC l a r e n d o n H i l l s I l l i n o i s 6 0 5 1 4P 6 3 0 . 6 5 5 . 9 4 1 7PROJECT NO:21017MICHAEL ABRAHAMA R C H I T E C T U R Em i c h a e l - a b r a h a m . c o mSycamore Creek Residence10404 Ditch RoadCarmel, INIssued For Permit 06.08.22BBb1.1Master Suite North and SouthElevations and SectionsELEVATION NOTES: HEAD HEIGHTS NOTED ARE FROM TOP OF UNIT TO TOP OF FINISH FLOOR. COORDINATE ROUGH OPENING RECOMMENDED BY MANUFACTURER WITH TOP OF UNIT HEAD HEIGHT. WINDOW SHOP DRAWINGS TO BE SUBMITTED TO ARCHITECT FOR DESIGN REVIEW. ANY OPERABLE WINDOWS LOCATED 6'-0" ABOVE FINISHED GRADE AND LESS THAN 24" INCHES ABOVE ADJACENT INTERIOR FLOOR MUST BE EQUIPPED WITH A WINDOW OPENING CONTROL DEVICE THAT LIMITS THE INITIAL WINDOW OPENING TO NO MORE THAN 4 INCHES. PROVIDE TEMPERED GLAZING WHEN WITHING 24” OF DOORS, ADJACENT TO TUBS AND STAIRS, SHOWER ENCLOSURES, GLAZING WITHIN 1 8" OF THE FINISHED FLOOR AND OTHER REQUIRED AREAS AS PER THE IRC. ALL SAFETY GLASS SHALL BE PERMANENTLY LABELED. DOOR AND WINDOW SIZES AS FOLLOWS: CASEMENT WINDOWS LISTED AS FRAME SIZE IN INCHES DOUBLE HUNG WINDOWS LISTED AS GLASS SIZE IN INCHES. TIE DOWNSPOUTS INTO DRAINAGE SYSTEM MASTER SUITE SOUTH ELEVATION SCALE: 1 /4" = 1 '-0" MASTER SUITE BUILDING SECTION C-C SCALE: 1 /4" = 1 '-0" MASTER SUITE BUILDING SECTION B-B SCALE: 1 /4" = 1 '-0" MASTER SUITE NORTH ELEVATION SCALE: 1 /4" = 1 '-0" MASTER SUITE NORTH BUIDLING SECTION A-A SCALE: 1 /4" = 1 '-0" 08/09/22