Loading...
HomeMy WebLinkAboutA00636 84 36 84 36 84 32 60 32 60 56 84 36 84 36 84 7 5.1 SIM.8'-0"9'-0"10'-0"32 60 32 60 32 60 32 60 32 60 60 60 24 36 28 46 T/JOIST LEDGE = +7 12" (EL.=846.54) T/ FOUNDATION SLAB =-13'-1" (EL. 832.83)13'-812"FIRST FLOOR = +2'-1" (EL.=848) B/ FOOTING MIN. 48" BELOW GRADE OR TO UNDISTURBED SOIL T/GARAGE SLAB= +1'-7" (847.5') SLOPE TO +1'-4"(847.25') @ DOOR 10 5.1 6B 5.1 10 5.1 6A 5.1 6C 5.1 R1 R1 R2 R2 R3 S1 S1 S1 S2 S2 S3 S4 S4 S5S5 S5 S4 123 12 3 OUTLINE OF GAME ROOM RO0F BEYOND OUTLINE OF FAMILY ROOM RO0F BEYOND OUTLINE OF FACE OF GABLE WALL BEYOND OUTLINE OF FACE OF GABLE WALL BEYOND OUTLINE OF STAIR BEYOND 8'-0" HEAD HEIGHT 7'-0" HEAD HEIGHT 8'-8" PLT. HT. 11'-8" CLG. HT. 8'-0"8'-0" HD. HT. 17'-0" HEAD HEIGHT FROM SLAB AT DOOR ±13'-1" PLATE HEIGHT FROM SLAB AT DOOR 10'-3" PLATE HEIGHT FROM SLAB AT DOOR 10"4" 1" 4X6 PURLINS ON 4X8 WOOD RAFTER TAILS S2 15'-1" PLATE HEIGHT 2'-0"9'-0" HEAD HEIGHT 8'-0" HEAD HEIGHT TOP OF FOUNDATION STONE LEDGE 10'-0" PLATE HEIGHT TOP OF FOUNDATION STONE LEDGE 3'-0" 4" A-A A1.2 A-A A1.1 A-A A1.2 A-A A1.1 T T EE T T E E E 6D 5.1 T/ POOL EQUIPMENT ROOM SLAB =-9'-0" (EL. 836.91) TOP OF FOUNDATION STONE LEDGE STONE RAIL WALL FOR STAIRS TO POOL EQUIPMENT ROOM 7'-0" HD. HT. OULTLINE OF STEPS BEYOND TO POOL EQUIPMENT ROOM 32 72 32 72 32 72 32 72 28 46 32 60 32 60 2436 32 60 32 60 9'-0"6'-0"6'-0" 3'-0" 4'-6"3'-0"9'-0"2'-0"3'-0"10'-0"1'-4" 1'-0" 2" 4" 8" 8"5'-0"2'-8" SECOND FLOOR FIRST FLR. CEILING 12'-0"T/STEEL = 0'-0" (EL.=845.92) FIRST FLOOR = +2'-1" (EL.=848) T/ FOUNDATION SLAB =-13'-1" (EL. 832.83)13'-1"8 5.1 12 8 9 5.1 12 8 3'-0" 7'-8"9'-0"6B 5.1 6A 5.1 R1 R2 R3 R3 R3 S1 S1 S2 S2 S3 S4S4 S4S4 S4S5 S5 S5S5 S5 S5S5 8'-6" PLT. HT. @ PWDR TOP OF FOUNDATION REFLECTING POOL DECORATIVE METAL ENTRY CANOPY CUSTOM PAINTED STEEL CHANNEL GUTTER 4'-0"3'-6"6"4"7" 3"4"6" 4X6 PURLINS ON 4X8 WOOD RAFTER TAILS S2 9'-0" HD. HT.1'-0"CUSTOM FRENCH DOORS TO MATCH ADJACENT SIDING 7"7'-0" HEAD HEIGHT 11'-2" CEILING HT.12'-0"OUTLINE OF ROOF AND CEILING @ KITCHEN BEYOND 17'-4" PLATE HEIGHT ABOVE TYPICAL FIRST FLOOR 7'-0" HEAD HEIGHT A.S.F. 12 4 12 3 1'-6"4'-7" CENTER LINE OFGREAT ROOM12'-0" PLT. HT. @ KITCHEN BEYOND3'-6"2'-4"9'-0"4" 1'-6" 4'-7" 1'-4"5'-2" TOP OF FOUNDATION STONE LEDGE OUTLINE OF FAMILY ROOM OVERHANG BEYOND 9'-0" HEAD HT. FROM MASTER SUITE FLOOR A-A A1.2 A-A A1.1 A-A A1.2 A-A A1.1 T T T T T E OUTLINE OF OFFICE WINDOWS BEYOND E OUTLINE OF FACE OF GABLE WALL BEYOND SIM. T/ FOUNDATION SLAB @ MASTER =-12'-7" (EL. 833.33) 15'-1" CEILING HEIGHT 10'-0" HD. HT. 12 8 1'-2" 7"±4'-5" 36 846'-6"CENTER LINE OF FAMILY ROOM10"3'-0"4"7"7"7"15'-1" PLATE HEIGHT 9'-0" HEAD HEIGHT 6" W. CEDAR BRACKETS1'-0"10'-0"W8 PAINTED STEEL BRACKET SECOND FLOOR FIRST FLR. CEILING 12'-0"T/STEEL = 0'-0" (EL.=845.92) FIRST FLOOR = +2'-1" (EL.=848) T/ FOUNDATION SLAB =-13'-1" (EL. 832.83)13'-1"R1 R3 S1 S4 S5 B/ FOOTING MIN. 48" BELOW GRADE OR TO UNDISTURBED SOIL E 6C 5.1 2X10 RAFTER TIES @16"O.C. 2 X 1 0 R A F TE R S @ 1 6 " O . C. EXTERIOR MATERIALS SCHEDULE TAG BASE BID BASE BID NOTES ALTERNATE BID ALTERNATE NOTES ROOFING R1 ASPHALT SHINGLE GAF TIMBERLINE HD ARCHITECTURAL SERIES R2 16" STANDING SEAM METAL REVERE FREEDOM GRAY BERRIDGE ALUMINUM WITH KYNAR FINISH WEATHERED ZINC R3 16" SOLDER SEAM REVERE FREEDOM GRAY BERRIDGE 90° ZEE LOCK PANELS FOR LOW SLOPES ZINC COTE GUTTERS, DOWNSPOUTS, COPINGS & FLASHING (TYPICAL AT ALL LOCATIONS UNLESS NOTED OTHERWISE) G1 FLASHING, COPINGS, ECT. REVERE FREEDOM GRAY BERRIDGE ALUMINUM WITH KYNAR FINISH WEATHERED ZINC G2 6" HALF ROUND GUTTERS & 6" DOWNSPOUTS REVERE FREEDOM GRAY BERRIDGE ALUMINUM WITH KYNAR FINISH WEATHERED ZINC SIDING AND VENEERS S1 STONE VENEER CUSTOM LIMESTONE MIX FROM STONE CENTER S2 VERTICAL CEDAR1X8T&G WITH 14" REVEAL FAH THERMALLY MODIFIED OAK SMOOTH FACE CEDAR - S3 HORIZONTAL CEDAR1X8 T&G WITH 14 " REVEAL FAH THERMALLY MODIFIED OAK SMOOTH FACE CEDAR - S4 CUT STONE SMOOTH FINISHED INDIANA LIMESTONE S5 PAINTED STEEL WINDOWS AND DOORS (TYPICAL AT ALL LOCATIONS UNLESS NOTED OTHERWISE) W1 MHB STEEL REMBRANDT #4 FINISH COLOR TO MATCH MAVIN W2 MARVIN MODERN BRONZE MARVIN ULTIMATE BRONZE MISCELLANEOUS M1 - -- - REFER TO GENERAL PERFORMANCE SPECIFICATIONS FOR PRODUCT AND ASSEMBLY REQUIREMENTS. ANY SUBSTITUTIONS TO BE BROUGHT TO ATTENTION OF ARCHITECT DOCUMENT:DRAWN BY:CHECKED:MA1 4 8 B u r l i n g t o n A v e n u eC l a r e n d o n H i l l s I l l i n o i s 6 0 5 1 4P 6 3 0 . 6 5 5 . 9 4 1 7PROJECT NO:21017MICHAEL ABRAHAMA R C H I T E C T U R Em i c h a e l - a b r a h a m . c o mSycamore Creek Residence10404 Ditch RoadCarmel, INIssued For Permit 06.08.22BBa1.3West ElevationEast Building SectionsELEVATION NOTES: HEAD HEIGHTS NOTED ARE FROM TOP OF UNIT TO TOP OF FINISH FLOOR. COORDINATE ROUGH OPENING RECOMMENDED BY MANUFACTURER WITH TOP OF UNIT HEAD HEIGHT. WINDOW SHOP DRAWINGS TO BE SUBMITTED TO ARCHITECT FOR DESIGN REVIEW. ANY OPERABLE WINDOWS LOCATED 6'-0" ABOVE FINISHED GRADE AND LESS THAN 24" INCHES ABOVE ADJACENT INTERIOR FLOOR MUST BE EQUIPPED WITH A WINDOW OPENING CONTROL DEVICE THAT LIMITS THE INITIAL WINDOW OPENING TO NO MORE THAN 4 INCHES. PROVIDE TEMPERED GLAZING WHEN WITHING 24” OF DOORS, ADJACENT TO TUBS AND STAIRS, SHOWER ENCLOSURES, GLAZING WITHIN 18" OF THE FINISHED FLOOR AND OTHER REQUIRED AREAS AS PER THE IRC. ALL SAFETY GLASS SHALL BE PERMANENTLY LABELED. DOOR AND WINDOW SIZES AS FOLLOWS: CASEMENT WINDOWS LISTED AS FRAME SIZE IN INCHES DOUBLE HUNG WINDOWS LISTED AS GLASS SIZE IN INCHES. TIE DOWNSPOUTS INTO DRAINAGE SYSTEM WEST ELEVATION SCALE: 1/4" = 1'-0" EAST BUILDING SECTION A-A SCALE: 1/4" = 1'-0" EAST BUILDING SECTION B-B SCALE: 1/4" = 1'-0" 08/09/22