These drawings have been
prepared by Case Design &
Remodeling solely for its use andshould not be reproduced or relied
upon by any other parties.
Dimensions shown or scaled are
subject to change per actual job
condition and must be verified.
Materials are to be supplied as
specified as equal or standard
when not uniquely specified.Installed materials may vary in
appearance from drawings.
Reference manufacturer's product
data for actual appearance and
specifications.Young ResidenceJohn and Melissa1076 Saratoga CircleCarmel, Indiana 46280Approved By:
Date:
G003
PERMIT
Maggie Smith
Senior Designer
msmith@caseindy.com
Craig Dice
Architectural Designer
cdice@caseindy.com
3.24.22
Dawn Ashburn
Project Developer
dashburn@caseindy.com
PPLLUUMMBBIINNGG NNOOTTEESS
GENERAL:GENERAL:
RELOCATE WATER LINES FOR NEW REFRIGERATOR LOCATION
RELOCATE WATER LINES FOR NEW DISHWASHER LOCATION LEFT OF SINK
FURNISH AND INSTALL NEW APRON FRONT SINK AND INSTALL SALVAGED KITCHEN FAUCET AND RO FAUCET
WITH EXISTING SYSTEM
FURNISH AND INSTALL NEW GARBAGE DISPOSAL WITH SWITCH
FURNISH & INSTALL NEW INLINE BOOSTER HEATER FOR MAIN KITCHEN SINK
FIREPLACE:FIREPLACE:
RUN NEW GAS LINE FROM UTILITY/LAUNDRY ROOM TO NEW FIREPLACE LOCATION
EELLEECCTTRRIICC NNOOTTEESS
GENERAL:GENERAL:
FURNISH AND INSTALL (6) NEW LED RECESSED CAN LIGHTS IN VAULTED CEILING IN KITCHEN ON NEW 3 WAY
DIMMER SWITCHES
FURNISH AND INSTALL (3) NEW WALL SCONCES AT KITCHEN WINDOWS ON 1 NEW DIMMER SWITCH
FURNISH AND INSTALL (8) GFCI OUTLETS THROUGHOUT KITCHEN BACKSPLASH
FURNISH AND INSTALL (2) NEW OUTLETS ON ISLAND
FURNISH AND INSTALL LED TAPE LIGHT THROUGHOUT KITCHEN ON 1 NEW DIMMER SWITCH
FURNISH AND INSTALL NEW GARBAGE DISPOSAL ON NEW SWITCH
FURNISH AND INSTALL 1 NEW SWITCH FOR EXISTING DINING TABLE
RELOCATE POWER FOR NEW REFRIGERATOR LOCATION
RELOCATE POWER FOR NEW DISHWASHER LOCATION
RELOCATE POWER FOR NEW SLIDE IN RANGE
RELOCATE POWER FOR NEW MW/EXHAUST OVER OVEN
FURNISH AND INSTALL 4 NEW LED RECESSED CAN LIGHTS IN NEW LIVING SPACE ARE ON 1 NEW DIMMER
SWITCH
FURNISH AND INSTALL 4 NEW LED RECESSED CAN LIGHTS IN EXISTING LIVING PACE ON 1 NEW DIMMER
SWITCH
FURNISH AND INSTALL 3 NEW OUTLETS THROUGHOUT NEW LIVING SPACE; SEE PLANS FOR LOCATIONS
FURNISH AND INSTALL 2 NEW EXTERIOR LIGHTS ON 1 NEW SWITCH
FURNISH AND INSTALL 1 GFCI OUTLET IN WEATHERPROOF ENCLOSURE ON REAR EXTERIOR WALL
MAKE OUTLET IN GARAGE INTO QUAD OUTLET
FIREPLACE:FIREPLACE:
INSTALL NEW OUTLET FOR FIREPLACE
INSTALL 2 NEW OUTLETS FOR TV AREA; FIELD VERIFY HEIGHTS
FIELD VERIFY RELOCATION OF THERMOSTAT AWAY FROM FIREPLACE INSTALL
GENERAL / CONSTRUCTION NOTES
PPAAIINNTT NNOOTTEESS
WALLS: ALL WALLS IN KITCHEN/LIVING ROOM/DINING ROOM AND DOWN HALLWAY
BEDROOM WALLS: PAINT WALL ADJACENT TO LIVING ROOM; INCLUDES NEW CLOSET DOOR/CASING
JAMB BOTH SIDES
FIREPLACE: PAINT NEW FIREPLACE SHIP LAP FLOOR TO CEILING AND RECESSED NICHE FOR TV
CEILINGS: ALL CEILING IN MAIN LIVING/DINING/KITCHEN
TRIMS: PAINT NEW BASE AS NEEDED THROUGHOUT WORK SPACE TO TIE INTO EXISTING, PAINT NEW
SHOE FOR NEW FLOORING, AND PAINT CASINGS FOR ALL NEW AND REPLACEMENT WINDOWS
EXTERIOR WORK: PAINT ENTIRE BACK SIDE OF HOUSE
FIREPLACE:FIREPLACE:
FRAME NEW WALLS FOR FIREPLACE PER PLANS
PATCH DRYWALL WALLS AND CEILING AT FIREPLACE
INSTALL NEW SHIPLAP AROUND FACE OF FIREPLACE AND FOR RETURN WALLS
INSTALL NEW BASE CABINETS WITH WOOD TOP AND FLOATING SHELVES; FIELD VERIFY SHELVING HEIGHTS WITH
H.O.
INSTALL CABINET HARDWARE
WINDOWS:WINDOWS:
INSTALL NEW WINDOWS IN EXISTING LOCATION FOR THE FOLLOWING: MAIN KITCHEN SINK, MASTER BEDROOM,
DINING ROOM WINDOWS (2) AND DINING ROOM TRANSOM (1), OFFICE WINDOW, AND FRONT BEDROOM WINDOW
INSTALL NEW CASING TO MATCH EXISTING FOR ALL NEW WINDOWS
PPRROOPPOOSSEEDD NNOOTTEESS
4.01.22#1
8.02.22#2
08/11/22