HomeMy WebLinkAbout12955 Old Meridian St - Site Demo Plan C1-1LINE OF SAWCUTLINE OFSAWCUTLINE OF SAWCUTLINE OFSAWCUTINLET PROTECTIONINLET PROTECTIONJPS Consulting Engineers - K:\Civil Projects\19JPSC26 Meridian Design Center\Drawings\C1-1 Demo.dwg August 22, 2019 - 2:37 PM Nvergatos
SITEDEMOLITIONPLAN1" = 20"NBVNBVNBVC1-1CONSTRUCTIONDOCUMENTS19 AUGUST 201919JPSC260 20 40FEETSCALE:1"=20'PLAN NOTES1. REMOVE EXISTING ASPHALT PAVEMENT COMPLETE. MAKE STRAIGHTSAW-CUT AT TERMINATION.2. REMOVE EXISTING CONCRETE CURB COMPLETE. MAKE STRAIGHTSAW-CUT AT TERMINATION.3. REFER TO ARCHITECTURAL DRAWINGS FOR BUILDING DEMOLITIONAND BACKFILLING OF BASEMENT.4. REMOVE BUILDING AIR CONDITIONING UNITS COMPLETE.5. REMOVE EXISTING UTILITY MANHOLE COMPLETE.6. REMOVE EXISTING ELECTRICAL FEED COMPLETE.7. REMOVE EXISTING CONCRETE RETAINING WALL COMPLETE.8. REMOVE EXISTING CONCRETE PAVEMENT COMPLETE.9. REMOVE EXISTING PAINTED PARKING STRIPES AND RELATEDPARKING APPURTENANCES COMPLETE IN THIS AREA.A. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING, ANDVERIFYING, THAT ALL PERMITS AND APPROVALS ARE OBTAINEDFROM THE RESPECTIVE CITY, COUNTY, STATE AND FEDERALAGENCIES PRIOR TO STARTING CONSTRUCTION.B. CONTRACTOR SHALL VERIFY LOCATION AND INVERT ELEVATIONS OFEXISTING SEWERS PRIOR TO START OF CONSTRUCTION.C. CONTRACTOR SHALL MAINTAIN A COMPLETE AND OPERABLE UTILITYSYSTEM AT ALL TIMES.D. CONTRACTOR SHALL INCLUDE COSTS FOR CUTTING AND PATCHINGAS REQUIRED IN THEIR BID PROPOSAL TO COMPLETELY INSTALL THEWORK INDICATED.E. CONTRACTOR SHALL INCLUDE ALL TAP FEES, PERMIT FEES ANDAPPLICATION FEES IN THEIR BID PROPOSAL AS NECESSARY TOCOMPLETELY INSTALL THE WORK INDICATED.F. INFORMATION SHOWN WAS OBTAINED FROM AN OWNERFURNISHED SITE SURVEY OF EXISTING CONDITIONS AND ISUNCONFIRMED. CONTRACTOR IS REQUIRED TO FIELD VERIFY THISINFORMATION AND NOTIFY ARCHITECT OF ANY DISCREPANCIES SOMODIFICATION CAN BE MADE.G. CONTRACTOR SHALL COORDINATE EXACT UTILITY LOCATIONS WITHTHE OWNER AND LOCAL UTILITY COMPANIES PRIOR TOCOMMENCING ANY WORK. UTILIZE THE INDIANA UNDERGROUNDUTILITY LOCATION SERVICE AT 811 OR 800-382-5544 PRIOR TO ANYEXCAVATION ON THE SITE.GENERAL NOTESPLAN SYMBOLSA. TEMPORARILY SEED ALL DISTURBED AREA.B. REFER TO LANDSCAPE SHEETS FOR AREAS OF PERMANENT SEEDINGAND/OR SOD.C. REFER TO STORMWATER POLLUTION PREVENTION NOTES AND DETAILSHEETSGENERAL SWPP NOTESSILT FENCECONSTRUCTION/GRADINGLIMITSCONSTRUCTION ENTRANCEA. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THERESPONSIBILITY OF THE DEVELOPER. UTILITY LINE SHALLRELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN ACONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THEDEVELOPER TO RESOLVE WITH THE UTILITY. EXISTING POLE LINESREQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSEDRIGHT OF WAY LINE.B. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL BERESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THECOMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGEDTO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE STARTOF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OFTHE RIGHT-OF-WAY.C. CONTRACTOR SHALL PROTECT THE EXISTING CITY DUAL DUCT BANKIN THE RIGHT-OF-WAY. IN THE EVENT OF CONFLICT WITH THEPROPOSED IMPROVEMENTS, RELOCATION OF THE DUAL DUCT BANKAND ALL ASSOCIATED/APPURTENANT/ANCILLARY ITEMS SHALL BETHE SOLE RESPONSIBILITY OF THE DEVELOPER SUBJECT TO REVIEWAND APPROVAL BY THE CITY.D. ALL PAVING WITHIN THE EXISTING AND PROPOSED CITYRIGHT-OF-WAY SHALL CONFORM TO THE REQUIREMENTS OF THEDEPARTMENT OF ENGINEERING. THE CONTRACTOR SHALL CONTACTTHE DEPARTMENT OF ENGINEERING TO SCHEDULE APRE-CONSTRUCTION MEETING TO REVIEW THE DEPARTMENT'SCONSTRUCTION REQUIREMENTS, STAFF NOTIFICATIONREQUIREMENTS, REQUIRED INSPECTIONS FOR CERTAIN STAGES OFTHE WORK AND TO REVIEW THE AUTHORITY OF THE DEPARTMENTAS IT RELATES TO WORK WITHIN THE EXISTING AND PROPOSEDRIGHT OF WAY.CARMEL ENGINEERING NOTES