Loading...
HomeMy WebLinkAboutCPC-Pavilion_Permit Set_20220817_Sheet-A.100_revisedFDFDFDFDFDFDFD FDWHN92CSAR03.0103.00NEW PAVILION5,000 SF.03.0203.0103.0126.0012.0012.0026.0126.0126.0126.0126.0126.0126.0126.0126.0126.0126.0126.0126.0126.0126.01EXISTING GARBAGEENCLOSUREKEY PLANASPEN PROJECT #:SEAL:9645 Lincoln‐Way Lane Suite 201  Frankfort, IL. 60423PRE‐GP/PERMIT SETCOPYRIGHT ASPEN GROUP INC. USE OF THESE DOCUMENTS SHALL BE RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE PREPARED, PUBLICATION THEREOF IS EXPRESSLY LIMITED TO SUCH USE. RE-USE, REPRODUCTION, OR PUBLICATION IN WHOLE OR IN PART IS PROHIBITED. READ DIMENSIONS. DO NOT SCALE DRAWINGS. REPORT ANY INCONSISTENCIES TO THE ARCHITECT IMMEDIATELY. EXPIRES:8/17/2022 9:51:31 AMCollege Park Church ‐Outdoor Pavilion07‐00552606 West 96th Street, Indianapolis, INA.010ARCHITECTURAL SITE PLAN1" = 40'-0"1ARCHITECTURAL SITE PLANARCHITECTURAL SITE PLAN NOTESDIVISION 03 - CONCRETE03.00 CONCRETE SLAB - SEE STRUCTURAL DWGS.03.01 CONCRETE PATH - SEE CIVIL DWG'S.03.02 EXISTING BITUMINOUS PAVING.DIVISION 12 - FURNISHINGS12.00 REFERENCE SHEET A.121 FOR CORRESPONDINGFURNITURE SCHEDULE.DIVISION 26 - ELECTRICAL26.00 NEW LED BOLLARD LIGHT, SUCH AS: LUCE, PLIN.26.01 ALTERNATE: NEW LED BOLLARD LIGHT, SUCH AS:LANDSCAPE, HAWTHORNE PATHWAY LIGHT.NREVISIONSNo. Date By DescriptionA 06/ 20/ 2022 Pre-GP / Permit Set