Loading...
HomeMy WebLinkAboutChange_Order__2;_Morphey_Construction,_Inc.;_($62,863.08);_18-ENG-21_-_1st_Street_NW_and_17-SW-09_2nd Street SW and Crooked Stick; CO #2, Final; Engineering DocuSign Envelope ID:6A9F830C-961 C-41 CA-88AD-8D607A5F8670 City of Carmel Project 18-21 & 17-SW-09 [APPROVED By Sergey Gre2imkhin 2f 5:22 pm,Aug 09,2022 1 St Street NW; 2nd Street SW and Crooked Stick CHANGE ORDER #2, FINAL Balancing/Reconciliation for 1st Street Pay Items 1 through 71,2nd Street 1 through 15,Crooked Stick 1 through 39. Contract Price prior to this Change Order $841,586.60 Contract Price will be increased/decreased by this Change Order $62,863.08 New Contract Price including this Change Order $904,449.68 Amount Adjusted Contract Cumulative Price Change from Original Contract Original Contract $770,800.00 $770,800.00 N/A CO1 $70,786.60 $841,586.60 9.2% CO2, Final $62,863.08 $904,449.68 14.8% DocuSign Envelope ID:6A9F830C-961C-41CA-88AD-8D607A5F8670 CITY OF CARMEL TO Morphey Construction,Inc. CONTRACT CHANGE ORDER NO. 02,FINAL 1499 N Sherman Dr DATE:08/0312022 Indianapolis,IN 46201 PROJECT NAME:18-21&17-SW-09 1st Street NW;2nd Street SW and Crooked Stick CITY REQ.NO.-N/A CITY PO NO.:104491 CITY PO DATE 11/17/2020 I. You are directed to make the following changes in this Contract: Items with' *'are added items Item Original Original Final Description Unit Unit Price Final Amount Over/Under No. Quantity Amount t Quantity 1ST STREET NW l Construction Engineering LS $7,000.00 1 $ 7,000.00 1 $ 7,000.00 $ - 2 Mobilization/Demobilization LS $19,900.00 1 $ 19,900.00 1 $ 19,900.00 $ - 3 Clearing of Right of Way LS $8,500.00 1 $ 8,500.00 1 $ 8,500.00 $ - 4 Pavement Removal SYS $20.00 20 $ 400.00 64.67 $ 1,293.40 $ 893.40 5 Common Excavation CYS $60.00 353 $ 21,180.00 353 $ 21,180.00 $ - 6 Temporary Inlet Protection EA $150.00_ 12 $ 1,800.00 12 $ 1,800.00 $ - 7 Temporary Silt Fence LFT $3.00 200 $ 600.00 0 $ - $ (600.00) 8 Subgrade Treatment,Type II SYS $20.00 16 $ 320.00 0 $ - $ (320.00) 9 Subgrade Treatment,Type IC SYS $36.00 850 $ 30,600.00 915 $ 32,940 00 $ 2,340.00 10 Subgrade Treatment,Type III SYS $10.00 131 $ 1,310.00 133.07 $ 1,330.70 $ 20.70 11 Structure Backfill,Type 1 CYS $50.00 87 $ 4,350.00 43.43 $ 2,171.50 $ (2,178.50) 12 Compacted Aggregate No.53 TON $30.00 392 $ 11,760.00 362.56 $ 10,876.80 $ (883.20) 13 Milling,Asphalt,1 1/2 Inches SYS $40.00 120 $ 4,800.00 114 $ 4,560.00 $ (240.00) 14 QC/QA HMA,2,64,Surface,9.5mm TON, $200.00 80 $ 16,000.00 101.4 $ 20,280.00 $ 4,280.00 15 QC/QA HMA,2,64,Intermediate,19.0mm TON $120.00 94 $ 11,280.00 83.46 $ 10,015.20 $ (1,264.80) 16 QC/QA HMA,2,64,Base,25.0mm TON $90.00 159 $ 14,310.00 129.4 $ 11,646.00 $ (2,664.00) 17 Joint Adhesive,Surface LFT $0.10 521 $ 52.10 0 $ - $ (52.10) 18 Joint Adhesive,Intermediate LFT $0.10 433 $ 43.30 0 $ - _$ (43.30) 19 Liquid Asphalt Sealant LFT $0.10 433 $ 43.30 0 $ - $ (43.30) 20 I-IlMA for Temporary Pavement,Type B TON $200.00 25 $ 5,000.00 20.5 $ 4,100.00 $ (900.00) 21 Asphalt for Tack Coat SYS $0.25 903 $ 225.75 943,6 $ 235.90 $ 10.15 22 Sidewalk,Concrete,4 Inch SYS $80.00 199 $ 15,920.00 200.01 $ 16,000.80 $ 80.80 23 Curb Ramp,Concrete SYS $180.00 44 $ 7,920.00 18.76 $ 3,376.80 $ (4,543.20) 24 Detectable Warning Surfaces SFT $53.00 69 $ 3,657.00 94.6 $ 5,013.80 $ 1,356.80 25 Curb,Concrete LFT $70.00 83 $ 5,810.00 107.5 $ 7,525.00 $ 1,715.00 26 Curb and Gutter,Roll Curb LFT $45.00 696 $ 31,320.00 697 $ 31,365.00 $ 45.00 27 HMA for Approaches,Type B TON $200.00 34 $ 6,800.00 35.52 $ 7,104.00 $ 304.00 28 PCCP for Approaches,6 Inch SYS $90.00 283 $ 25,470.00 321.8 $ 28,962.00 $ 3,492.00 29 Monument,Type B EA $770.00 5 $ 3,850.00 5 $ 3,850.00 $ - 30 Sodding Nursery SYS $30.00 451 $ 13,530.00 373.53 $ 11,205.90 $ (2,324.10) 31 Pipe,Type 4,Circular,6 Inch LFT $30.00 643 $ 19,290.00 552 $ 16,560.00 $ (2,730.00) 32 Pipe,Type 2,Circular, 12 Inch LFT $95.00 232 $ 22,040.00 233.4 $ 22,173.00 $ 133.00 33 Video Inspection for Pipe LFT $3.00 232 $ 696.00 233.4 $ 700.20 $ 4.20 34 Pipe,PVC,6 Inch LFT $65.00 44 $ 2,860.00 39,7 $ 2,580.50 $ (279.50) 35 Video Inspection for Underdrains LFT $3.00 643 $ 1,929.00_ 552 $ 1,656.00 $ (273.00) 36 Geotextiles for Underdrains,Type IA SYS $2.00 551 $ 1,102.00 264.3 $ 528.60 $ (573.40) 37 _Aggregate for Underdrains CYS $60.00 60 $ 3,600.00, 19.78 $ 1,186.80 $ (2,413.20) 38 Geogrid,IB(Undistributed) SYS $85.00 I $ 85.00 0 $ - $ (85.00) 39 Casting,Adjusted to Grade EA $600.00 6 $ 3,600.00 5 $ 3,000.00 $ (600.00) 40 Inlet,A2 EA $2,800.00 1 $ 2,800.00 1 $ 2,800.00 $ - _ 41 Inlet,E7 EA $2,600.00 1 $ 2,600.00 1 $ 2,600.00 $ . _ 42 Inlet,F7 EA $2,600.00 1 $ 2,600.00 1 $ 2,600.00 $ - 43 Manhole.C4 EA $4,000.00 2 $ 8,000.00 2 $ 8,000.00 $ - _ 44 Inlet,J EA $3,000.00 3 $ 9,000.00 3 $ 9,000.00 $ - 45 Inlet,M EA $2,600.00 1 $ 2,600.00 1 $ 2,600.00 $ - 46 9 Inch Pipe Catch Basin EA $2,500.00 1 $ 2,500.00 2 $ 5,000.00 $ 2,500,00 47 Construction Sign,A EA $50.00 15 $ 750.00 19 $ 950.00 $ 200.00 48 Construction Sign,B EA $80.00 6 _$ 480.00 10 $ 800.00 $ 320.00 49 Maintaining Traffic LS $12,104.55 1 $ 12,104.55 1 $ 12,104.55 $ - 50 Barricade,III-B LFT $12.00 36 $ 432.00 72 $ 864.00 $ 432.00 DocuSign Envelope ID:6A9F830C-961C-41CA-88AD-8D607A5F8670 Items with'*'are added items Item 'Original Original Final No. Description Unit Unit Price Quantlty Amount Quantity Final Amount Over/Under 5I Sign,Sheet,Remove EA $44.00 15 $ 660.00 15 $ 660.00 $ - 52 Sign,Sheet,Relocate EA� $50.00 15 $ 750.00 15 $ 750.00 $ - 53 Sign Post,Square Type l Reinforced Anchor Base LFT $20.00 96 $ 1,920.00 96 $ 1,920.00 $ - 54 Transverse Marking,Thermoplastic,Stop Line,24 In. LFT $5.00 20 $ 100.00 21 $ 105.00 $ 5.00 55 30'Light Pole EA $10,000.00 1 $ 10,000.00 1 $ 10,000.00 $ - 56 30'Light Pole Foundation EA $1,500.00 I $ 1,500.00 1 $ 1,500.00 $ - 57 Manually Retractable Bollards EA $2,000.00 2 $ 4,000.00 1 $ 2,000.00 $ (2,000.00) 58 Sanitary Sewer Service Adjustment(Undistributed) LFT $75.00 50 $ 3,750.00 0 $ - $ (3,750.00) 59 Long&Short Side Services(Undistributed) EA $1,500.00 l $ 1,500.00 0 $ - $ (1,500.00) 60 Monon Concrete Headers and Crossing CO* LS $7,033.41 0 $ - 1 $ 7,033.41 $ 7,033.41 61 Topsoil CO* LS $5,460.00 0 $ - 1 $ 5,460.00 $ 5,460.00 62 Landscape Rock CO* LS $1,662.62 0 $ - 1 $ 1,662.62 $ 1,662.62 63 Monon Fence Removal CO* LS $1,584.53 0 $ - 1 $ 1,584.53 $ 1,584.53 64 Unforeseen Manhole Obstruction CO* LS $1,319.63 0 $ -. 1 $ 1,319.63 $ 1,319.63 65 Fire Hydrant RPM CO* LS $590.76 0 $ - 1 $ 590.76 $ 590.76 66 Unforeseen UG Obstruction* LS $1,056.07 0 $ - 1 $ 1,056.07 $ 1,056.07 67 Unforeseen Underground Obstruction CO* LS $643.80 0 $ 1 $ 643.80 $ 643.80 68 Bubs Added Stone* LS $2,128.16 0 $ - 1 $ 2,128.16 $ 2,128.16 69 Added Drainage Basin* LS $5,491.82 0 $ - 1 $ 5,491.82 $ 5,491.82 70 Added Clearing* LS $716.17 0 $ 1 $ 716.17 $ 716.17 71 Sanitary Lateral Cap* LS $1,108.09 0 $ - 1 $ 1,108.09 $ 1,108.09 2ND STREET SW I Mobilization/Demobiliration LS $4,900_.00 I $ 4,900.00 1 $ 4,900.00 $ - 2 Construction Engineering LS $1,500,00 I $ 1,500.00 1 $ 1,500.00 $ - 3 Common Excavation CYS $150,00 50 $ 7,500.00 50 $ 7,500.00 $ - 4 Borrow CYS $100.00 120 $ 12,000.00 120 $ 12,000.00 $ - 5 Sidewalk,4" SYS $68.00 225 $ 15,300.00 174.97 $ 11,897.96 $ (3,402.04) 6 PCCP Driveway Approach,6" SYS $200,00 66 $ 13,200.00 108.68 $ 21,736.00 $ 8,536.00 7 6"Concrete Curb LFT $46,00 430 $ 19,780.00 284.08 $ 13,067.68 $ (6,712.32) 8 Compacted Aggregate,No.53 TON $68.00 65 $ 4,420,00 30.96 $ 2,105.28 $ (2,314.72) 9 Curb Ramp SYS $200,00 7 $ 1,400,00 11.74 $ 2,348.00 $ 948.00 10 ADA Detectable Warning Paver SFT $53.00 18 $ 954.00 19.73 $ 1,045.69 $ 91.69 11 Sodding SYS $37,00 190 $ 7,030.00 74.71 $ 2,764.27 $ (4,265,73) 12 Water Meter Relocation EA $1,300.00 3 $ 3,900.00 2 $ 2,600.00 $ (1,300.00) 13 Structure Relocate EA $3,000.00 1 $ 3,000.00 1 $ 3,000,00 $ - 14 Maintenance of Traffic LS $4,916.00 1 $ 4,916.00 1 $ 4,916,00 $ - 15 New Hydrant Per Request ofCWU* LS $6,225 64 0 $ - I $ 6,225,64 $ 6,225.64 CROOKED STICK LANE 1 Mobilization/Demobilization LS $13,000.00 1 $ 13,000.00 1 $ 13,000.00 $ - 2 Construction Engineering LS $2,500.00 1 $ 2,500.00 1 $ 2,500.00 $ - 3 Maintenance of Traffic LS $5,934.97 1 $ 5,934.97 1 $ 5,934.97 $ - 4 Curb and Gutter,Remove LFT $13.00 497 $ 6,461.00 685 $ 8,905.00 $ 2,444.00 5 Common Excavation CYS $30.00 717 $ 21,510.00 717 $ 21,510.00 $ - 6 Inlet,J EA $2,400.00 4 $ 9,600.00 4 $ 9,600.00 $ - 7 Manhole,C Modified EA $3,500.00 4 $ 14,000.00 4 $ 14,000.00 $ - 8 Pipe,Type 2,Circular,12"RCP LFT S120.00 96 $ 11,520.00 96 $ 11,520.00 $ - 9 Pipe,Type 2,Circular,24"RCP LFT $110.00 757 $ 83,270.00 757 $ 83,270.00 $ - 10 Flowable Backfill,Removable CYS $115.00 280 $ 32,200.00 292 $ 33,580.00 $ 1,380.00 II Curb and Gutter,Roll,Concrete LFT $42.00 497 $ 20,874.00 650 $ 27,300.00 $ 6,426.00 12 1.5"HMA Surface,9.5 mm TON $200.00 30 $ 6,000.00 0 $ - $ (6,000.00) 13 PCCP,12 in. SYS $66.00 362 $ 23,892.00 362 $ 23,892.00 $ - 14 B-Borrow CYS $40.00 105 $ 4,200.00_ 105 $ 4,200.00 $ - 15 Temporary Inlet Protection EA $150.00 10 $ 1,500.00 10 $ 1,500.00 $ - 16 Temporary Silt Fence LFT $3.00 476 $ 1,428.00 0 $ - $ (1,428.00) 17 Sodding SYS $60.00 77 $ 4,620.00 371 $ 22,260.00 $ 17,640.00 v 18 Temporary Seeding LBS $0.01 3 $ 0.03 0 $ - $ (0.03) 19 Concrete Washout EA $1,200.00 l $ 1,200.00 1 $ 1,200.00 $ - 20 Orifice Plate EA $1,200.00 l $ 1,200.00 1 $ 1,200.00 $ - 21 Sanitary Sewer Service Adjustment(Undistributed) LFT $3,000.00 l $ 3,000.00 1 $ 3,000.00 $ - 22 Long&Short Side Services(Undistributed) EA $2,500.00 l $ 2,500.00 3 $ 7,500.00 $ 5,000.00 DocuSign Envelope ID:6A9F830C-961C-41CA-88AD-8D607A5F8670 Items with'•'are added items Item Description Unit Unit Price Original Original Final Final Amount Over/Under No. Quantity Amount Quantity 23 Construction Signs,A EA $100.00 10 $ 1,000.00 10 $ 1,000.00 $ - 24 Construction Signs,C EA $125.00 2 $ 250.00 2 $ 250.00 $ - 25 Road Closure Sign Assembly EA $200.00 2 $ 400.00 2 $ 400.00 $ - 26 Detour Route Marker Assembly EA $55.00 8 $ 440.00 8 $ 440.00 $ - 27 Barricade 1II-B FLT $10.00 150 $ 1,500.00 168 $ 1,680.00 $ 180.00 28 Mob Add.Paving/Milling LS $4,161.00 0 $ - I $ 4,161.00 $ 4,161.00 29 Tack TON $1,608.00 0 $ - 1.32 $ 2,122.56 $ 2,122.56 30 9.5mm Surface TON $100.00 0 $ - 420.15 $ 42,015.00 $ 42,015.00 31 Milling 3" SYS $4.52 0 $ - 4800 $ 21,696.00 $ 21,696.00 32 Add MOT* LS $3,000.00 0 $ - 1 $ 3,000.00 $ 3,000.00 34 Irrigation and Mulch* LS $2,798.85 0 $ - 1 $ 2,798.85 $ 2,798.85 35 Add Driveway Prep and Pout* LS _ $4,440.15 0 $ - 1 $ 4,440.15 $ 4,440.15 36 Sump Pump Tie in* LS $534.40 0 $ - 1 $ 534.40 $ 534.40 37 Exploratory Water Line Work* LS $4,168.34 0 $ - 1 $ 4,168.34 $ 4,168.34 38 Utility Relocation Work* _ LS $5,346.08 0 $ - 1 $ 5,346.08 $ 5,346.08 39 Add.Drop Manhole Work* LS $3,252.30 0 $ - 1 $ 3,252.30 $ 3,252.30 TOTAL OF CHANGE ORDER ITEMS S 133,649.68 II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order:R.F.P _n/a W D.C.NO.: n/a Other:_By Request from the City of Carmel per proposals included herein The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $ 841,58660 Contract Price will be increased by this Change Order $ 62 863 08 New Contract Price including this Change Order $ 904,449.68 Contract Time prior to this Change Order 144 Days August 27 2021 Completion Date Net increased resulting from this Change Order 31 Days Current Contract Time including this Change Order September 27 2021 Completion Date This Change Order is for full and final settlement of all direct,indirect,impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are Recommended The Above Changes Are Accepted Approved Imo( o°asig°ea br: l 13 CROSSROAD ENGINEERS Momhey Construction l Limes mood,Mayor ENGINEER CONTRACTOR 115 N 17th Ave _ 1499 N Sherman Dr !er ,City Engineer Address Address Beech Grove,[N 46107 Indianapolis,IN 46201 c_D°`°ssWI a 4.4Aumb,r City/State/Zip City/Stale/Zip LOVI (N4&ln, {- �Bg'nfil parson,Member By:DGldeotGv Clark By_ StgVex P.Aiilbot .. ATT S-[.D°`usignea by: Phone'. 317-780-1555 Phone- 317-716-6719 Sue o r�r�j Date: 8/5/2022 Date. r/r/LL Date L