HomeMy WebLinkAboutS200.0EXISTING 2X4 FRAMING
DEMOLITION & FRAMING KEY
NO DEMO IN THIS ROOM
EXISTING 2X6 FRAMING
WALL SECTION TO BE REMOVED
NEW 2x4 FRAMING
NEW 2X6 FRAMING
BULK HEAD / LOWERED CEILING
NDEMO & PREP PLAN NOTES
NOTE QTY DESCRIPTION
2
INSTALL RAILING OR STAIR PROTECTION AS NECESSARY
DURING INSTALLATION OF HARDWOODS. SPECIFY USE OF
HARDBOARD IN ANY LOCATIONS NECESSARY, RETURN OR
SUPPLY VENTS TO BE COVERED, ETC.)
1 DEMO DECORATIVE EXTERIOR WOOD BALUSTERS (TRASH).
3 DEMO DECORATIVE METAL BALLISTERS (TRASH).
D1D1
D2D2
D3D3
D1D1
D2D2
D3D3
DN
UP
UP
OPEN BELOW
OPEN BELOW
HALL
C.H.: VARIES
HARDWOOD
330 SQ. FT.
MASTER BEDROOM
HARDWOOD
328 SQ. FT.
MASTER SITTING
WOOD PLANK
191 SQ. FT.
STAIRWELL
D3D3
D3D3
D2D2
STEP
EXTERIOR TERRACE
WOOD DECKING
D1D1
DOWN
DOWN
LANDING
WOOD PLANK
115 SQ. FT.
D3D3
D1D1
PORTER RESIDENCEFLOORING, MUDROOM, PANTRY12257 MontcalmCarmel, IN 46032Date:Revision:
A3
SHEET OF 11
SIGNATURE / SEAL
Client Initials:
Date:
The plans, including all text, drawings, concepts, and ideas
forming a part of the plans and the selection and arrangement
thereof are Copyright 2018 of Custom Living, Inc., Indianapolis,
IN. ALL RIGHTS RESERVED. The plans shall remain the
property of Custom Living Inc. Any use of the plans or their
content without the prior written permission of Custom Living Inc.
is strictly prohibited. CUSTOM LIVING5335 Winthrop AveIndianapolis IN 462208/19/2022
DATE:
[PRINTS TO SCALE IF PRINTED ON 24" X 36" ]
GENERAL SITE PREP & DEMO NOTES
Install plastic to seal off areas being remodeled
from rest of home as necessary.
Install floor covering for construction path from
door designated as the construction entrance to
locations of remodeling as necessary.
Install additional floor covering or wall protection
as needed over areas close to the areas of
construction activity.
Install dust control measures on HVAC cold air
returns located within the locations of
remodeling.
Custom Living can provide a HEPA Air Scrubber
to aid in airborne dust control from the start of
demolition up to priming of new drywall
depending on site conditions. Homeowner
understands that this will help to reduce airborne
dust; however, it will not mitigate it in its entirety.
Demolition Contractor(s) are responsible for all
labor, for the scope of work specified in the
drawings provided by Custom Living.
Homeowner understands that Custom Living has
only provided a labor and material allowance for
the scope of demolition denoted on the
drawings. Any additional scope added or
uncovered during demolition result in filing a
Change Order during construction.
Homeowners understand that demolition work
will generate dust and noise throughout the
house. Custom Living will provide site protection
measures to reduce where possible, but
Homeowners should not expect 100%
containment.
SECOND FLOOR EXISTING / DEMO PLAN
SCALE: 1/4" = 1'
08/23/22