Loading...
HomeMy WebLinkAboutS200.0EXISTING 2X4 FRAMING DEMOLITION & FRAMING KEY NO DEMO IN THIS ROOM EXISTING 2X6 FRAMING WALL SECTION TO BE REMOVED NEW 2x4 FRAMING NEW 2X6 FRAMING BULK HEAD / LOWERED CEILING NDEMO & PREP PLAN NOTES NOTE QTY DESCRIPTION 2 INSTALL RAILING OR STAIR PROTECTION AS NECESSARY DURING INSTALLATION OF HARDWOODS. SPECIFY USE OF HARDBOARD IN ANY LOCATIONS NECESSARY, RETURN OR SUPPLY VENTS TO BE COVERED, ETC.) 1 DEMO DECORATIVE EXTERIOR WOOD BALUSTERS (TRASH). 3 DEMO DECORATIVE METAL BALLISTERS (TRASH). D1D1 D2D2 D3D3 D1D1 D2D2 D3D3 DN UP UP OPEN BELOW OPEN BELOW HALL C.H.: VARIES HARDWOOD 330 SQ. FT. MASTER BEDROOM HARDWOOD 328 SQ. FT. MASTER SITTING WOOD PLANK 191 SQ. FT. STAIRWELL D3D3 D3D3 D2D2 STEP EXTERIOR TERRACE WOOD DECKING D1D1 DOWN DOWN LANDING WOOD PLANK 115 SQ. FT. D3D3 D1D1 PORTER RESIDENCEFLOORING, MUDROOM, PANTRY12257 MontcalmCarmel, IN 46032Date:Revision: A3 SHEET OF 11 SIGNATURE / SEAL Client Initials: Date: The plans, including all text, drawings, concepts, and ideas forming a part of the plans and the selection and arrangement thereof are Copyright 2018 of Custom Living, Inc., Indianapolis, IN. ALL RIGHTS RESERVED. The plans shall remain the property of Custom Living Inc. Any use of the plans or their content without the prior written permission of Custom Living Inc. is strictly prohibited. CUSTOM LIVING5335 Winthrop AveIndianapolis IN 462208/19/2022 DATE: [PRINTS TO SCALE IF PRINTED ON 24" X 36" ] GENERAL SITE PREP & DEMO NOTES Install plastic to seal off areas being remodeled from rest of home as necessary. Install floor covering for construction path from door designated as the construction entrance to locations of remodeling as necessary. Install additional floor covering or wall protection as needed over areas close to the areas of construction activity. Install dust control measures on HVAC cold air returns located within the locations of remodeling. Custom Living can provide a HEPA Air Scrubber to aid in airborne dust control from the start of demolition up to priming of new drywall depending on site conditions. Homeowner understands that this will help to reduce airborne dust; however, it will not mitigate it in its entirety. Demolition Contractor(s) are responsible for all labor, for the scope of work specified in the drawings provided by Custom Living. Homeowner understands that Custom Living has only provided a labor and material allowance for the scope of demolition denoted on the drawings. Any additional scope added or uncovered during demolition result in filing a Change Order during construction. Homeowners understand that demolition work will generate dust and noise throughout the house. Custom Living will provide site protection measures to reduce where possible, but Homeowners should not expect 100% containment. SECOND FLOOR EXISTING / DEMO PLAN SCALE: 1/4" = 1' 08/23/22