Loading...
HomeMy WebLinkAboutFindings of Fact FINDINGS OF FACT SHEET - DEVELOPMENT STANDARDS VARIANCE CARMEL ADVISORY BOARD OF ZONING APPEALS (Petitioner fills out 1-3, and first 2 blanks) Docket No.: ( Z &Z Z ©/43 D V Petitioner: Ti./ 'f / .5 T J< i/ /2,0 ) t) L 1. The approval of this variance will not be injurious to the public health, safety, morals and general welfare of the community because: See Yte).+ Pkle, 2. The use and value of the area adjacent to the property included in the variance will not be affected in a substantially adverse manner because: Sbe vlQiA— 3. The strict application of the terms of the Unified Development Ordinance to the property will result in practical difficulties in the use of the property because: DECISION It is therefore the decision of the Carmel Board of Zoning Appeals that Development Standards Variance Docket No. 'PZ-1 a yam- '0 a 1 2g V is granted, subject to any conditions stated in the minutes of this Board, which are incorporated herein by reference and made a part hereof. Adopted this �� day of ill%IS"C , 20 .2:2- „Carmel Board of Zoning Appeals Heorvtrg 0 �ccw SECRETARY, Carmel Board of Zd Ing Appeals Conditions of approval of the Board, if any, are listed on the Letter of Grant. Page 7 of 11 File.development standards variance handout 2022 Revised 01/03/2022 FINDINGS OF FACT SHEET Docket No.: PZ -2022-00128 V Petitoner: Thomas and Sharon Wood 1. This structure is in very close proximity to the primary residence and is encompassed in a screened, fenced in and buffered back yard. 2. The implementation of the project uses design elements and features that can be found quit frankly in numerous applications commercial and residential around Carmel. 3. Due to the sites topography and drainage set up, building the pergola on the opposite side of the pool will result in retention requirements and sight line interference to neighbors.