HomeMy WebLinkAbout06040052 Sewer
J~
CLAY TOWNSHIP REGIONAL WASTE DISTRICT
SANITARY SEWER PERMIT
~
U Conditional Permit [x ] Final Permit
INDIVIDUAL LOTS/EXISTING BUILDINGS
,
Project Title:
Michigan Raod
Heather Knoll sec 2
Location:
Owner/Builder:
M I Homes
Lot# 76
Street address: 2658 Paramount Cir
City: Westfield
Zip: 46032
County: Hamilton
Interceptor Charges Paid:
PRI:
EDU Fee:1650.00
Application fee: -100.00
1-'
PLEASE NOTE: Installation of building sewer shall be per the specifications of the Clay Township
Regional Waste District (see reverse) and any conditions noted below. All installations shall be inspected by District
personnel during "open trench" phase and befare backfilling with sand or stone to six inches above the pipe. NO
footing or foundation drains, or other sources of ground or stormwater, shall be permitted to enter the District's
sanitary sewer system. The District will assume no liability for drains which are below the arade level of the
nearest downstream manhole nor for laterals which are extended beneath drivewavs or sidewalks. The
permit holder (property owner, developer or builder) will be responsible for damages to the District's sewer system.
This includes damages to manholes, castings, manhole lids and the like; caused by construction activity on the
building site which is the subject of this permit.
Inspections by the District are MANDATORY and shall be arranged by contacting the District's office at 844-9200
24 hours in advance. All new construction will be placed on billing six months after connection has been made or
w~'/rater is connected, whichever comes first.
~ The District reserves the right to inspect all sump pump ~onnections to ensure no illegal .
Jjctions have been made.' !
IV' i
. ~have received a copy of Ordinance No. 9-13-99 and agree to follow all District standards. Building
has a [ ] crawl space [ ] slab or [ x] basement that [ ]will be finished with grinder pump installed to
comply with elevation requirements [ x ]rough-in plumbing with arinder DumD installed during
construction, [ ] rough-in plumbing only and !Irinder DumD will not be installed during construction, [ ]
no plumbing in the basement. (Please check appropriate box.) .
_Conditional Permit Terms:
[ ] NO CONNECTION to the sewer until further notification.
[ ] Certificate of Insurance must Qe on file with CTRWD listed as certificate holder.
[ ] 48 hours notice before work starts on manhole core drilling or cuts of active lines
and District inspector must inspect all work before covered.
[ ] All District fees will be paid in full.
[ ] Approval pending Districts review of plans.
[ ] Copies of approved permits from appropriate county or city agencies for work in
the right-of-way road cuts or are required.
No occupancy until further notification
I
All Conditions have been met and final permit issued 2005. I
By signing below, I attest that I am familiar with the District's specifications and agree to accept responsibility for all
work done under t! permit. I
[ ]
[ ]
255-9900
Phone
Permit issued this 10th day. of April, 2006,
ves 2 site plans submitted
Permit is valid for ONE- YEAR from the date issued.
0UW/difU(fyvI///"
~lndY J. F\'ritner
Director of Administration & Customer Service
sv
Permit-rev.01-13~06cf