Loading...
HomeMy WebLinkAbout06040090 Site Plan (2) ~~ :hneider The Schneider Corporation 8901 QUa Avenue Historic fort Harrison Indlanapollo, Indlua 46216-1037 317-628-7100 317-628-'/200 FIX EDgiIIeerlII,I 3urnJin.I Wulscape Arcb1led.... GJ3.Ull GeoIoID' 'Ian Prepared for: ge Custom Homes 444, containing 7,560 5.r.:I:, in I of Westclay n I 5001 nent I 200500019934 ! 3, Slide I 606 on County, Clay Twp. Tradd Street (50' R/Yf) I, In 46032 ed Date: 04/05/06 : By. J<I Floor Elevation Information je = 902.0 per plan le + 0.3' = Garage FIT (902,3) IT + 1.0' = Residence FIT (903.3) 01 FFE - 10.0':1: = Basement FIT (893.3) he garage finished floor elevation bove the elevation at center of . plan. to 9rade side yard swale I shawn an this plan. If builder to achieve positive drainage away )osed structure, the engineer shall :ted. builder is not to de~ate from lown on this pIon without the consent he The Schneider Corp. and Brenwick Dev. pion was prepared information token rd plats, subdivision ord drawings and ;ded by client. It ponsibility of the to verify site prior to construction The-Schneider- - - . Brenwick Development crepancies. streets from trucks to be cleoned at each day. i and silt fence to be used ed to keep mud off of lout of storm sewers. laterals curb d: ry Sewer -foce Drain er tap to be with granular within 10. of er top to be restored lal condition prior :ion, :k fill suggested oy at sanitary sewer h, water line trench er excavated areas, occurs) ltilities on plat plan ocotions per plan e verified in the field. dory areas - Westclay) 35' on lots 100' and larger. 30' on less than 100' 0: 50~ y areas - We,tclay) 30' 2 stories ': 50~ shown is per plans !! as-built elevation. In for the elevation rieen the primary finished to the top of basement e basement finished floor ,y the client. =L{CH~RBACK CURB__ ____ ~ f- b~ \\INDDW 140.00 5.6' w "'15 O'll 46.58 ~ 26.75' E ,,,, P W ~ ill ,0 0::::: m~tj , .,. f- d L, o~ '" u"' (f) , ~ 15" WAlK Q:~~ , I:j< g 00 C) g >- ~ ~ ~.,. ~ , "'''' C) Cl .... lB.6T , '"'" ,. Cl 2.1 ~ ~ ~ -~ z , '" <( 22"1 !!l L._________ 6.00 ~41':1 '" ~ ;E 0::::: ~ ,,; ~ < '" f- IS ~ ~ ~:l: 24.00' 38.67' 36.6' 5.0' f- ~ ~16.0' 44.6 136.67 1.1 N - r' ~ Plot Pion Legend []2Q&l Proposed Grode, 000.0 Existing Grades __ 000.0-- Contour Grade * Approx. Lateral Location _ . - Sanitary Sewer Lines -a'- Storm Sewer lines - IJ - Water Service lines - - - - - - - Sub-Surface Drain lines . Manhole (Sanitary or Storm) . Beehive Inlet (Stonn) 11II Curb Inlet (Stonn) D End Section (Storm) ... Fire Hydrant _ 000 _ 000 - Flow Line of swale - Building Line (BL / BSL) - - - - - - - Easement Une Note: Sanitary Sewer Top of Costing Information Upstreom Manhole, TC= 902.26 Downstream Manhole, Te= 901.60 per plan. Nate: Sump pump(s) to be placed by builder as needed. Community Restrictions: Side Yord = 5' min. ane side only Reor Yard = N/A Aggregate = 20~ of lot width at build-to line MH#431 I TC=902.26 PER PLAN ~I . . ....... TC=901.60 PER PlAN MH # 421 I, Dennis L Grumpp, duly licensed Land Surveyor, Indiana 11 50303, do hereby certify that in my opinion. if the finished grades ore constructed os shown, the Surface Drainage on the subject lot. will be satisfactory for Residential Construction. ,,\I\\\I\IIII1IIIIJ/fII/J1. #""'\ L C. r~%; #' ~ ,,,""':"',,.~h.-% ~~~ ,,"G'S H:.,.;:". 0/'","'" :::::: .'~' N ".;"":;:;:::: "'~ ...~v 0 0'.. ~A'" I (.' ~ 50303 'Y" 1 ~ \. STATE OF .:" fjg ~ /.. .' ~ ::;:;; (" ". I p.. .'"a. ~ ~ ~'41"",,'YOI A".....'I\. <'-."""f!? ~ "Y~y/) ."........ ,( .'J ~ ~ V SUO\I \. ~ ~/4/, l\ 't ';.,~~ rllllll/fIIIIIIIII\\\"\I'~ "-"-- l . ~ Note: The basement elevation, depicted hereon, has been determined and based upon the pod grades and/or contours token from the construction plans for this subdivision. Unless stated, no information about fluctuating water tables, soil conditions, or soil types has been provided or stated on said plans. It is recommended that the basement finished floor elevations be at least two feet (2') obove the nonnal pool elevation of any adjoining bodies of water, unless 0 study of facts reveals otherwise. If during the excavation process on y ground water is witnessed, The Schneider Corporation should be notified immediately. The basement elevation should be raised two feet (2') above the ground water. and additional construction techniques should be incorporated to alleviate future problems, ~~1 t'^ LOTH 444 !I. VB06.0050962 ~ o ~ =~= o Detail of Ground Water flow pattern. Assumed North Scale: I" = 30' LQJ -ri- -w- - - - - Note: Builder to ensure positive drainage away from structure(s). ,. PLEASE NOTE THAT THE STRAIGHT UNE SLOPE OF THE DRIVEWAY FROM THE GARAGE fiNISHED flOOR ELEVATION TO THE TOP OF THE CURB AT THE CENTER OF THE DRIVEWAY EXCEEDS 5~ AS PROPOSED. THIS SLOPE IS BASED ON THE REQUIRED ~INIMUM GARAGE fiNISHED flOOR ELEVATION AND THE EXISTING TOP OF CURB ELEVA noN.