HomeMy WebLinkAboutALTERNATE ELEVATIONS A2-A- L V A T I 1\1 N, NCTES
1. DO NOT SCALE DRAWINGS.
2. REFER TO FLOOR PLANS FOR ALL WALL ASSEMBLY DESIGNATIONS AND LOCATIONS
OF TYPICAL WALL SECTIONS.
3. MEP PENETRATIONS ARE NOT SHOWN. SEE MEP DRAWINGS FOR ACTUAL
LOCATIONS AND TYPES.
4. ALL MASONRY COURSING SHALL BE RUNNING BOND UNLESS NOTED OTHERWISE.
5. SEE KEYNOTES FOR MASONRY TYPES.
6. ALL COLORS TO BE SELECTED AND APPROVED BY ARCHITECT FROM
MANUFACTURER'S STANDARDS.
7. ALL NON-PREFINISHED EXTERIOR ITEMS SHALL BE PAINTED WITH ONE COAT OF
TINTED PRIMER AND ONE COAT OF FINISH PAINT.
8. PAINT ALL MECHANICAL PENETRATIONS TO MATCH ADJACENT SURFACE.
9. INSTALL PREFINISHED METAL DRIP EDGE ABOVE ALL HORIZONTAL TRIM BOARDS,
INCLUDING AT HEADS OF DOORS AND WINDOWS. DO NOT CAULK ABOVE.
ALTERNATE EXTERIOR ELEVATION DIAGRAM REFERS
10. AT PAINTED BRICK, HAND ROLL PRIMER WITH 3/4" NAP ROLLER. SPRAY ON TWO
COATS OF FINISHED PAINT, FLAT FINISH.
TO WINDOW LOCATION AND SIZE CHANGES ONLY.
11. DOWNSPOUTS MAY NOT BE SHOWN. SEE ROOF PLANS FOR LOCATIONS.
EXTERIOR MATERIALS ARE TO REMAIN AS SHOWN
12. CAULK ALL JOINTS. UNPAINTED CAULK SHALL BE PREFINISHED TO MATCH ADJACENT
ON ACTUAL BUILDING ELEVATIONS.
MATERIALS.
13. ALL SIDING AND TRIM SHALL BE SMOOTH. NO TEXTURED SIDING OR TRIM ALLOWED.
INDICATES SAFETY GLAZING.
NO WINDOW
AT CHATHAM-2 3RD FLOOR
3
NO WINDOW
AT CHATHAM-1 3RD FLOOR
ROOF -ACCESS 2-BEDROOM
FO WINDOW
AT RITTENHOUSE-2 3RD FLOOR
ROOF -ACCESS 2-BEDROOM
FO WINDOW
AT RITTENHOUSE-1 3RD FLOOR
ROOF -ACCESS 2-BEDROOM
ROOF -ACCESS BEDROOM
OIL 127'-4"
T.O. WINDOW
OL 127'-4"
T.O. WINDOW
OIL 127'-4"
T.O. WINDOW
127-4" —
T.O. WINDOW
❑
I
0 ❑
(D WINDOW ;
AT RITTENHOUSE-2 I
T T
❑ 0
J�WINDOW
AT RITTENHOUSE-1
T T
CHEF KITCHEN
CHEF KITCHEN
OL 119'-10" I
THIRD FLOOR '
119'-10"
THIRD FLOOR
h 119'-10"
THIRD FLOOR
OL 119'-10"
THIRD FLOOR
�
OL 117'-4 1/4"OIL117'-4
I ❑
T.O. WINDOW ❑ ❑9d
1/4"
I
T.O. WINDOW El
❑ ❑
117'-4 1/4"
T.O. WINDOW I 0 ❑
117'-4 1/4"
T.O. WINDOW ❑
E T
I
I in El
0
T
109'-4 1/4"
109'-4 1/4"
h 109'-4 1/4"
OL 109'-4 1/4"
OL
SECOND FLOOR
SECOND FLOOR
SECOND FLOOR
SECOND FLOOR
I
�
OIL 100'-0" i
FIRST FLOOR
100'-0"
FIRST FLOOR
LAI
100'-0"
FIRST FLOOR
100'-0"
FIRST FLOOR
OL VARIES
GRADE
OILVARIES
GRADE
OIL VARIES
GRADE
OIL VARIES
GRADE
0 4' 8' 16' 24'
= 4' �' 16
4' _' 16' 24'
0 4' 8' 16' 24'
_ I AM— ALT.Fl
AI — I LT.Rx
Ir�l = J E —LAL
I - NH0 lNfE-1 ALT.
--_
I___�_�N
EXT E INN
I=1`�I
EXT.ELEI r�l
1/8
T WINDOW
T WINDOW
� 127'-4"
� 127'-4"
AT RITTENHOUSE-2 3RD FLOOR
ROOF -ACCESS 2-BEDROOM
AT RITTENHOUSE-1 3RD FLOOR
ROOF -ACCESS 2-BEDROOM
T.O. WINDOW
MO WINDOW ❑
AT MADRONA-2
T.O. WINDOW
MO WINDOW
AT MADRONA-1
OIL 127'-4"
T.O. WINDOW ® i i i
�H WINDOW ❑
T.O. WINDOWO
JQWINDOW E:1—
CHEF KITCHEN T I
CHEF KITCHEN El
AT RITTENHOUSE-2 I I I
CHEF KITCHEN FI T
AT RITTENHOUSE-1 I
CHEF KITCHEN ❑ ElI
119'-10"
119'-10"
I I
THIRD FLOOR
THIRD FLOOR �\
h 119-10
119'-10"
117'-4 1/4"
117'-4 1/4' \
THIRD FLOOR
I
THIRD FLOOR
T.O. WINDOW 0 �I
�E:1=171L;�
T.O. WINDOW ®
117'-4 1/4"
T.O. WINDOW O EEMF
117-4 1/4"
T.O. WINDOW ❑ O 0
,
109'-4 1/4"
OL
SECOND FLOOR
OIL 109'-4 1/4"
SECOND FLOOR
h 109'-4 1/4"
109'-4 1/4"
SECOND FLOOR ;
I
SECOND FLOOR
OL 100'-0"
FIRST FLOOR
OIL 100'-0'
FIRST FLOOR
I
I
I
h 100'-0"
h 100'-0"
OgL VARIES
OgL VARIES
FIRST FLOOR I
FIRST FLOOR
GRADE
GRADE
OL VARIES
OL VARIES
GRADE
GRADE
0 4' 8' 16' 24'
= 4' ='
_< 4' 8' a�'4'
0 4' 8' 16' 24'
MADRlu I�I —L A
MADRONA-1T
RITTENH E— A
R I TT E N Fl01--- ALT.
ELEVATION1
_
EXT., ELET N1
_
E
VAT 10 N
E X T E L E V" A T I r1
A"T.
is
1/8n=11
ra
ROTTMRnn l COLLIER
ARCHITECTS
155 EAST MARKET STREET
SECOND FLOOR, SUITE 200
INDIANAPOLIS, INDIANA 46204
T 317.721.2724
ROTTMANNCOLLIER.COM
PRELIMINARY
NOT FOR
CN TRUCTION
SCOPE DOCUMENT"
THESE DOCUMENTS INDICATE THE GENERAL
SCOPE OF THE PROJECT IN TERMS OF
ARCHITECTURAL DESIGN CONCEPT, DIMENSIONS
OF THE BUILDING, MAJOR ARCHITECTURAL
ELEMENTS AND TYPE OF STRUCTURAL,
MECHANICAL AND ELECTRICAL SYSTEMS. THE
DRAWINGS DO NOT NECESSARILY INDICATE OR
DESCRIBE ALL WORK REQUIRED FOR FULL
PERFORMANCE AND COMPLETION OF THE
REQUIREMENTS OF THE CONTRACT, ON THE
BASIS OF THE GENERAL SCOPE INDICATED OR
DESCRIBED, TRADE CONTRACTOR SHALL
FURNISH ALL ITEMS REQUIRED FOR PROPER
EXECUTION AND COMPLETION OF THE WORK
oNyx TM
PinmanPartnel*s 0,
Z
0
0
Q 0 W
Z J N W
Lu H M
J 0Z 60 N
E r N LEI Z � cr
ILL, a ch 0
� J o u) —
0 �w Z0
J � 0 � _ W
®LL
J U LW Lj
Z)0 �2 x
�m �< W
LLI (f) W
Q z
J
J
z
W
REVISIONS
2022-06-15 CARMEL ADLS
2022-09-06 PLAN COMMISSION APPROVAL
ALTERNATE
EXTERIOR
ELEVATIONS
PROJECT NO 21145-001
DATE 2022-08-15
SHEET
A -A