HomeMy WebLinkAboutC200 SWPPP ISANNER COU
R
T
MILLRIDGE DRIVELOT 72
LOT 67
LOT 66
LOT 57
LOT 56
LOT 55
LOT 54
DDDDDDDDDDDDDDDDD
D
D DDDDDD D D D D D D DD DDD DDDD DDDDDDDDDDDDDD
D
DDDDDDD D D D D D
DDDDDDDDDDDDDDDDDDDDSF
SF
SF SFSFSFSFSFSFSFSFSFIP
IP
SF
SF
SF
SFSFSFSF
SFSF SF
SFSFSFSF SF SF SF SF SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFS
F SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFKnow what's below.
before you dig.Call
R
W
S
N
E
DISTURBED ACREAGE =
2.48 ± AC.
NOTES:
1.THIS PLAN INDICATES EROSION CONTROL MEASURES REQUIRED
BEFORE SOIL STRIPPING AND PAD CONSTRUCTION IS TAKING
PLACE. COORDINATE WITH SOIL CONSERVATION DISTRICT
REPRESENTATIVE FOR ANY OTHER MEASURES REQUIRED DUE TO
SITE CONDITIONS.
2.THIS PLAN IS TO BE USED FOR STORMWATER POLLUTION
PREVENTION PURPOSES ONLY. FOR ANY OTHER INFORMATION
SEE SITE CONSTRUCTION PLANS AND DETAILS.
3.ALL DISTURBED AREAS THAT WILL BE POTENTIALLY IDLE FOR 15
DAYS OR MORE TO BE STABILIZED (SEEDED, MULCHED, ETC)
IMMEDIATELY.
4.NO EARTHMOVING MAY TAKE PLACE WITHOUT AN APPROVED
STORMWATER POLLUTION PREVENTION PLAN.
5.ADDITIONAL STORMWATER POLLUTION PREVENTION MEASURES
MAY BE REQUIRED IN THE FIELD BY THE MS4 REPRESENTATIVE.
6.THERE SHALL BE NO DIRT, DEBRIS OR STORAGE OF MATERIALS IN
THE STREETS.
7.SILT FENCE SHALL BE PLACED AS SHOWN ON THE PLANS PRIOR
TO ANY EARTHWORK.
8.ALL WORK WITHIN THE RIGHT-OF-WAY SHALL MEET CURRENT
LOCAL CONSTRUCTION STANDARDS.
9.THE CONTRACTOR SHALL PROTECT EXISTING RIGHT-OF-WAY
INFRASTRUCTURE AND BE RESPONSIBLE FOR RESTORATION AS
NECESSARY.
10.THE HAMILTON COUNTY SURVEYOR'S OFFICE IS THE REVIEW
AUTHORITY FOR THE EROSION CONTROL ACTIVITIES REQUIRING
CONTACT, PRE-CONSTRUCTION MEETING INVITATION,
SELF-MONITORING REPORT DELIVERY TO THEIR MS4
REPRESENTATIVE.
11.NOTICE OF THE SCHEDULED DATE FOR COMPLETION OF
CONSTRUCTION SHALL BE PROVIDED TO THE MS4
REPRESENTATIVE AT LEAST SEVENTY TWO (72) HOURS PRIOR TO
COMPLETION. THE CONTRACTOR OR OWNER WILL SCHEDULE THE
FINAL INSPECTION; THE STORM DRAIN AND SITE GRADING
PERFORMANCE SURETIES WILL BE RELEASED AFTER SUBMITTAL
AND APPROVAL
12.APPROXIMATE CONSTRUCTION SCHEDULE:
START DATE: April , 2022
COMPLETION DATE: April , 2027
RECEIVING WATERS = Williams Creek
13.LATITUDE = 39° 56' 21" N, LONGITUDE = 86° 09' 45" W
14.HYDROLOGIC UNIT CODE: 05120201090060
15.PERSON IN CHARGE OF SWPPP IMPLEMENTATION:
PITTMAN PARTNERS
P.O. BOX 554
CARMEL, INDIANA 46082
TELEPHONE: (317) 590-5074
CONTACT PERSON: STEVE PITTMAN
STEVE@PITTMANPARTNERS.COM
LEGEND
PHASE I EROSION CONTROL
(BEFORE MAJOR EARTHWORK)
PRE CONSTRUCTION ACTIVITIES
1.CALL THE INDIANA UNDERGROUND PLANT PROTECTION SYSTEMS,
INC. (“HOLEY MOLEY”) AT 811 TWO WORKING DAYS BEFORE
CONSTRUCTION BEGINS TO CHECK THE LOCATIONS OF ANY
EXISTING UTILITIES.
2.CONTACT THE MS4 STORMWATER DEPARTMENT INSPECTOR TO
SCHEDULE A PRE-CONSTRUCTION MEETING AT LEAST 3 WORKING
DAYS PRIOR TO THE START OF CONSTRUCTION.
3.CONTACT IDEM AT LEAST 48 HOURS PRIOR TO CONSTRUCTION.
4.INSTALL SILT FENCE AT THE EDGES OF THE PROJECT SITE WHERE
THERE IS POTENTIAL FOR ANY STORMWATER RUNOFF AS DENOTED
ON THE STORMWATER POLLUTION PREVENTION PLAN. POTENTIAL
AREAS ARE IDENTIFIED BASED ON EXISTING TOPOGRAPHY AROUND
THE PERIMETER OF THE SITE.
5.INSTALL INLET PROTECTION ON ALL EXISTING STORM SEWER
STRUCTURES WITHIN THE CONSTRUCTION LIMITS OF THE PROJECT
AS INDICATED ON THE PLANS.
6.EVALUATE, MARK AND PROTECT IMPORTANT TREES AND
ASSOCIATED ROOT ZONES. EVALUATE EXISTING VEGETATION
SUITABLE FOR USE AS FILTER STRIPS ALONG THE PERIMETER OF
THE SITE.
7.INSTALL CONSTRUCTION ENTRANCE IN THE LOCATION SHOWN ON
THE PLANS AND PER SPECIFICATIONS.
8.ESTABLISH CONSTRUCTION STAGING AREA FOR EQUIPMENT AND
VEHICLES AS FAR FROM DETENTION PONDS AND SWALES AS
POSSIBLE.
9.INSTALL TRASH DUMPSTER, CONCRETE WASHOUT AREA AND PLACE
PORT-O-LET AS INDICATED ON THE PLANS.
10.ESTABLISH ONSITE LOCATION FOR OWNER/CONTRACTOR
PLACEMENT OF APPROVED PLANS, RULE 5 NOI AND RULE 5
INSPECTION DOCUMENTS.
11.CONTACT THE MS4 REPRESENTATIVE TO CONDUCT INITIAL
EROSION INSPECTION BEFORE MASS EARTHWORK.
CONSTRUCTION SEQUENCING
THE PURPOSE OF STAGING CONSTRUCTION DURING THE PROJECT IS
TO LIMIT THE AMOUNT OF GROUND DISTURBED AT ANY GIVEN TIME
AND TO PREVENT SEDIMENT FROM LEAVING THE SITE. THE
FOLLOWING SEQUENCE OF CONSTRUCTION SHOULD BE FOLLOWED AS
MUCH AS POSSIBLE. ANY DEWATERING REQUIRED DURING
CONSTRUCTION OF THIS PROJECT SHALL BE DONE THROUGH A
“DANDY” DEWATERING BAG OR APPROVED EQUAL. DO NOT PLACE
DEWATERING BAG WITHIN 50 FEET OF A SWALE, DITCH OR CREEK.
1.CLEAR SITE.
2.STRIP TOPSOIL OR SOIL CONTAINING VEGETATION AND ROOT
FIBERS FROM STREET AND BUILDING PAD AREAS AND PLACE IN
TOPSOIL STOCKPILE AREA AS NOTED ON THE PLANS.
3.COMPLETE ALL MASS GRADING REQUIRED TO PREPARE ROADS,
BUILDING SUBGRADES AND PADS. IF LIME OR OTHER SOLID
ADDITIVES WILL BE USED TO STABILIZE THE STREET SUBGRADE,
APPLY BEFORE ANY STORM SEWER INSTALLATION.
4.INSTALL ALL STORM SEWER SYSTEMS, SANITARY SEWER SYSTEMS,
WATER DISTRIBUTION SYSTEMS AND OTHER UTILITIES. INSTALL ALL
INLET PROTECTION AS EACH INLET IS COMPLETED AS SHOWN ON
THE PLANS AND THE DETAIL SHEETS.
5.COMPLETE GRADING FOR ALL BUILDING AREAS AND ROAD
SUBGRADES AS SHOWN ON THE PLANS.
6. INSTALL CURBING, AND PAVE ALL ROADS
7.INSTALL TEMPORARY SEEDING IN ALL GRADED AREAS THAT WILL
NOT BE DISTURBED FOR 14 DAYS OR MORE. POND BANKS SHALL
RECEIVE PERMANENT SEED AND EROSION CONTROL BLANKET AS
SHOWN ON THE PLANS.
8.FINISH GRADE ALL SWALES. APPLY PERMANENT SEED AND
EROSION CONTROL BLANKETS AS SHOWN ON THE PLANS.
9.PREPARE SEED BED AND APPLY PERMANENT SEED IN ALL COMMON
AREAS AND EASEMENT AREAS AS DENOTED ON THE PLANS.
10.CLEAN AND MAINTAIN ALL INLET PROTECTION, SILT FENCE,
EROSION CONTROL BLANKETS, TEMPORARY SILTATION BASINS AND
TEMPORARY SEEDING AREAS UNTIL THE PROJECT IS COMPLETELY
BUILT OUT.
11.IF SEEDED AREAS DO NOT PRODUCE A MINIMUM OF 70 PERCENT
VEGETATIVE COVER, CONTRACTOR SHALL RE-SEED TO OBTAIN
ADEQUATE VEGETATIVE COVER FOR STABILIZATION OF THE SITE.
12.REMOVE ALL TEMPORARY EROSION CONTROL PRACTICES
INCLUDING SILT FENCE WHEN ENTIRE SITE HAS REACHED 70
PERCENT VEGETATIVE COVER.
-CONSTRUCTION ENTRANCE
(8" OF #2 STONE ON NON-WOVEN GEOTEXTILE
FABRIC)
-STAGING AREA
(8" OF #2 STONE ON NON-WOVEN GEOTEXTILE
FABRIC)
-POSTING AREA - 4" PVC TUBE WITH END CAPS
ATTACHED TO PROJECT CONSTRUCTION SIGN TO
CONTAIN APPROVED CONSTRUCTION DRAWINGS
AND PERMITS FOR INSPECTORS.
-SHEET FLOW PROTECTION / SILT FENCE
-CONCRETE WASHOUT
- LIMITS OF CONSTRUCTION
-PROPOSED INLET PROTECTION (DANDY SACKS
AND WIRE SILT FENCES) FOR EXISTING
STRUCTURES REQUIRED. (SEE DETAILS ON SHEET
C203)
-TREE PROTECTION FENCE (SEE DETAIL ON SHEET
L101)
IP
SF
D
C200 SWPPP IC200SWPPP PHASE IW210497BCHW210497 01-13-2022DASJRV10 9abcd 8 7 6efgh109876 REVISIONS AND ISSUES5 4 3 2 1
PROJECT NO.
SHEET NO.abcd5 4 3 2
CHECKED BY:DRAWN BY:DESIGNED BY:DWG NAME:PROJECT NO.:DATEBYeDATE:1
LOCATION: H:\2021\W210497\Engineering\design\conset\C200 SWPPP I.dwgLAYOUT: C200DATE/TIME: August 11, 2022 - 7:31amPLOTTED BY: HansenbfhgENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.SMPart of Section 11, Township 17 North, Range 3 East, Clay Township, Hamilton County, IndianaREVISED PER TAC COMMENTS05-13-2022TPG/BCHREVISED PER TRICO COMMENTS05-19-2022BCHREVISED PER TAC COMMENTS06-28-2022TPG/BCHREVISED PER TAC COMMENTS08-10-2022TPG/BCHSITE TBM
TBM#1
SET ON THE EAST BOLT ON A FIRE HYDRANT AT THE
BEGINNING OF THE CUL-DA-SAC ON THE NORTH SIDE OF
SANNER COURT.
ELEV. 841.80 (NAVD 88)
TBM#2
SET ON THE RIM OF A SANITARY MANHOLE AT THE END OF
THE CUL-DA-SAC OF SANNER COURT.
ELEV. 842.89 (NAVD 88)340 SANNER COURT, INDIANAPOLIS, IN 46290THE RESERVE AT SPRINGMILL, SECTION 2,REPLAT OF LOTS 68, 69C, 70C, & 71