HomeMy WebLinkAboutC201 SWPPP IISANNER COU
R
T
MILLRIDGE DRIVE
LOT 72
LOT 67
LOT 66
LOT 63
LOT 62
LOT 61
LOT 60 LOT 59
LOT 58
LOT 57
LOT 56
LOT 55
LOT 54
W
W
W
W
W
W W W
W
W
W
80
79
78
7776
75
71
68
SANNER COURT
(PRIVATE STREET)SANSANSANSANSANSANSANDDDDDDDDDDDDDDDDD
D
D DDDDDD D D D D D D DD DDDDD DDD
D
DDDDDDD D D D D D
DDDDDDDDDDDDDDDDDDDDIP
IP
SF
SF
SF
SFSFSFSF
SFSF SF
SFSFSFSF SF SF SF SF SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFS
F SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFIP
IP
IP
SF
SF
SF
SF
SF
SF SF SF
SF
SF
SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFKnow what's below.
before you dig.Call
R
W
S
N
E
PHASE II EROSION CONTROL
(AFTER MAJOR EARTHWORK)
LEGEND
*
SF
D
-INLET PROTECTION (DANDY SACKS AND WIRE
SILT FENCES) FOR PROPOSED STRUCTURES
(SEE TOWN OF CICERO STANDARD DETAILS)
-PROPOSED INLET PROTECTION (DANDY SACKS
AND WIRE SILT FENCES) FOR EXISTING
STRUCTURES REQUIRED. (SEE TOWN OF
CICERO STANDARD DETAILS)
-PERMANENT SEEDING (USE PLANTING CHART)
AT A MINIMUM, MULCH IS REQUIRED.
-EROSION CONTROL BLANKET (USE STAPLE
PATTERN N.A.G. S150.)
-TEMPORARY SEEDING
-SHEET FLOW PROTECTION
-SWALE
-CONSTRUCTION LIMITS
-LOCATION WHERE STORMWATER LEAVES SITE
-TREE PROTECTION FENCE
-STORMWATER QUALITY FEATURE
IP
IP
DISTURBED ACREAGE =
2.48 ± AC.
POST CONSTRUCTION
SEQUENCING
THE PURPOSE OF THE POST CONSTRUCTION PHASE IS TO IDENTIFY
AND MAINTAIN ALL POST CONSTRUCTION BEST MANAGEMENT
PRACTICE (BMP) STRUCTURES THUS REDUCING RUNOFF AND
CONTROLLING POLLUTANTS. THE FOLLOWING SEQUENCING SHOULD
BE FOLLOWED AS MUCH AS POSSIBLE.
1.DISTRIBUTE POST CONSTRUCTION BMP OPERATIONS AND
MAINTENANCE MANUAL (O&M MANUAL) TO OWNER AND HOME
OWNERS ASSOCIATION.THE O&M MANUAL IDENTIFIES AND LOCATES
THE BMP STRUCTURE FOR THE OWNER.
2.STORMWATER BMP OWNERS MUST ROUTINELY INSPECT BMP TO
VERIFY THAT ALL BMP COMPONENTS ARE FUNCTIONING AS
DESIGNED AND ARE NOT IN DANGER OF FAILING. ALL BMP NEED
MAINTENANCE TO FUNCTION AS WATER QUALITY ENHANCEMENTS.
MAINTENANCE CAN RANGE FROM DREDGING SEDIMENT OUT OF
THE TREATMENT AREA TO MOWING GRASS.
3.BMP OWNER IS RESPONSIBLE FOR THE MAINTENANCE OF THE BMP
AND ANY COSTS ASSOCIATED WITH MAINTAINING THE BMP.
4.BMP OWNER SHALL KEEP THE BMP FREE FROM LITTER AND WOODY
GROWTH. REFER TO THE INSPECTION AND MAINTENANCE
GUIDELINES FOR FURTHER CLARIFICATION.
5.SEDIMENT THAT COLLECTS IN THE BMP SHALL BE REMOVED WHEN
IT ADVERSELY AFFECTS THE ABILITY OF THE BMP TO PERFORM AS
A WATER QUALITY CONTROL DEVICE.C201 SWPPP IIC201SWPPP PHASE IIW210497BCHW210497 01-13-2022DASJRV10 9abcd 8 7 6efgh109876 REVISIONS AND ISSUES5 4 3 2 1
PROJECT NO.
SHEET NO.abcd5 4 3 2
CHECKED BY:DRAWN BY:DESIGNED BY:DWG NAME:PROJECT NO.:DATEBYeDATE:1
LOCATION: H:\2021\W210497\Engineering\design\conset\C201 SWPPP II.dwgLAYOUT: C201DATE/TIME: August 11, 2022 - 7:32amPLOTTED BY: HansenbfhgENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.SMPart of Section 11, Township 17 North, Range 3 East, Clay Township, Hamilton County, IndianaREVISED PER TAC COMMENTS05-13-2022TPG/BCHREVISED PER TRICO COMMENTS05-19-2022BCHREVISED PER TAC COMMENTS06-28-2022TPG/BCHREVISED PER TAC COMMENTS08-10-2022TPG/BCHSITE TBM
TBM#1
SET ON THE EAST BOLT ON A FIRE HYDRANT AT THE
BEGINNING OF THE CUL-DA-SAC ON THE NORTH SIDE OF
SANNER COURT.
ELEV. 841.80 (NAVD 88)
TBM#2
SET ON THE RIM OF A SANITARY MANHOLE AT THE END OF
THE CUL-DA-SAC OF SANNER COURT.
ELEV. 842.89 (NAVD 88)
*340 SANNER COURT, INDIANAPOLIS, IN 46290THE RESERVE AT SPRINGMILL, SECTION 2,REPLAT OF LOTS 68, 69C, 70C, & 71BMP
BMP