Loading...
HomeMy WebLinkAboutElevations12 121 0 10/12 12 0 12 � 0 2 14 21 3/12 12/12 12/12\12N/12 ILE ,]I III on NINON REAR ELEVATION .� SCALE: 1/�" 1' 011 16' I I\ `/ I Y I "�--"— Y /\ I I `./ I Y U I SCALE: 1/� /1 1' 0" 0 1' 2' 8' 16' 9'-0" 2ND FLOOR PLATE HEIGHT 8'-0" WINDOW HEADER HEIGHT SECOND FLOOR HEIGHT II 1/8" TJI JOISTS 10'-0" IST FLOOR PLATE HEIGHT 8'-0" WINDOW HEADER HEIGHT I1 0'-0" FIRST FLOOR HEIGHT II 1/8" TJI JOISTS TOP OF FOUNDATION WALL 9'-0" 2ND FLOOR PLATE HEIGHT 8'-0" WINDOW HEADER HEIGHT SECOND FLOOR HEIGHT II 1/8" TJI JOISTS 10'-0" IST FLOOR PLATE HEIGHT 8'-0" WINDOW HEADER HEIGHT 0'-0" FIRST FLOOR HEIGHT II 1/8" TJI JOISTS TOP OF FOUNDATION WALL ELEVATION KEY I. SHINGLE ROOF 2. CONTINUOUS ROOF VENT (TYP., ALL RIDGES) 3. 1 X 6 RAKE BOARD 4. FRIEZE TRIM, (SEE 5-1, A-6) S. HARDI-BOARD HORIZONAL LAP SIDING 6. MASONRY BRICK I. 1"X6" SURROUND 8. BUILDING PROFILE BEYOND 9. GAS FIREPLACE FLUE 10. BRICK SOLDIER 11. IX6 TRIM OVER 2X6 BAND BOARD 12. ROOM PROFILE BEYOND 13. WOOD TRIM I"X6" 14. SHED ROOF 15. CANTED BRICK SILL ROWLOCK 16. SCREEN 11. CONCRETE STEPS TO GRADE 18. SLAB EDGE 19. SOLDIER HEADER OR SILL 20. RAILING ASSEMBLY. SEE BLDR. SPECS. 21. ICE AND WATERSHIELD AS REQ'D 22. 1/2 BRICK VENEER ON FAUX CHIMNEY. VERIFY FINAL CHIMNEY LOCATION PER HOA REQUIREMENTS. SQUARE FOOTAGE TABLE FOUNDATION CRAWL SPACE FIRST FLOOR FINISHED SQUARE FOOTAGE GARAGE SQUARE FOOTAGE SCREEN PORCH SQUARE FOOTAGE FRONT PORCH SQUARE FOOTAGE SECOND FLOOR 1541 SF 1624 SF 582 SF 212 SF 52 SF FINISHED SQUARE FOOTAGE 1573 SF UNFINISHED SQUARE FOOTAGE 0 SF TOTAL FINISH SQ. FT. 3197 SF TOTAL SQUARE FOOTAGE 3197 SF U c: Q � ® ®� O z ®I= 0 Lo ®._ z Q U }, z N E E U n rr� L VJ Q o Z J w m cc wcc Q 0 Z N o r w Of U z Q El 0 SHEET A-1 DQ D W C-) cv o �! O 0 o 0 u P-1 RIGHT ELEVATION 4 a LEFT ,5i-ALl 114 11I1 011 ELEVATIUN . 9'-0" 2ND FLOOR PLATE HEIGHT 8'-0" WINDOW HEADER HEIGHT SECOND FLOOR HEIGHT II 1/8" TJI JOISTS 10'-0" IST FLOOR PLATE HEIGHT 8'-0" WINDOW HEADER HEIGHT 0'-0" FIRST FLOOR HEIGHT 11 1/8" TJI JOISTS TOP OF FOUNDATION WALL 9'-0" 2ND FLOOR PLATE HEIGHT 8'-0" WINDOW HEADER HEIGHT SECOND FLOOR HEIGHT II 1/8" TJI JOISTS 10 —0 IST FLOOR PLATE HEIGHT 8'-0" WINDOW HEADER HEIGHT 0'-0" FIRST FLOOR HEIGHT II 1/8" TJI JOISTS TOP OF FOUNDATION WALL ELEVATION KEY I. SHINGLE ROOF 2. CONTINUOUS ROOF VENT (TYP., ALL RIDGES) 3. 1 X 6 RAKE BOARD 4. FRIEZE TRIM, (SEE 5-1, A-6) S. HARDI—BOARD HORIZONAL LAP SIDING 6. MASONRY BRICK I. 1"X6" SURROUND 8. BUILDING PROFILE BEYOND 9. GAS FIREPLACE FLUE 10. BRICK SOLDIER 11. IX6 TRIM OVER 2X6 BAND BOARD 12. ROOM PROFILE BEYOND 13. WOOD TRIM I"X6" 14. SHED ROOF 15. CANTED BRICK SILL ROWLOCK 16. SCREEN 11. CONCRETE STEPS TO GRADE 18. SLAB EDGE 19. SOLDIER HEADER OR SILL 20. RAILING ASSEMBLY. SEE BLDR. SPECS. 21. ICE AND WATERSHIELD AS REQ'D 22. 1/2 BRICK VENEER ON FAUX CHIMNEY. VERIFY FINAL CHIMNEY LOCATION PER HOA REQUIREMENTS. SQUARE FOOTAGE TABLE FOUNDATION CRAWL SPACE 1541 SF FIRST FLOOR FINISHED SQUARE FOOTAGE 1624 SF GARAGE SQUARE FOOTAGE 582 SF SCREEN PORCH SQUARE FOOTAGE 212 SF FRONT PORCH SQUARE FOOTAGE 52 SF SECOND FLOOR FINISHED SQUARE FOOTAGE 1573 SF UNFINISHED SQUARE FOOTAGE 0 SF TOTAL FINISH SQ. FT. 3197 SF TOTAL SQUARE FOOTAGE 3197 SF U c: Q � O z ®I= z Q U }, z N E E L VJcc o a� oaf moo 0 O� � o cc DQ 0 �Oo� DQ —� o�. �c o'o Z 75 0 m oo= �cv co 0 a � ) 64. 75 75 o 0 � lC� 0 SHEET ICJ A 2 w N Q o Z J w m w� Q 0 Z N o r w U z � Q o z 0 SCALE: 1/�" 1' 011