HomeMy WebLinkAboutElevations12
121
0
10/12
12
0 12 � 0 2
14 21 3/12 12/12 12/12\12N/12
ILE
,]I III on NINON
REAR ELEVATION .�
SCALE: 1/�" 1' 011
16'
I I\ `/ I Y I "�--"— Y /\ I I `./ I Y U I
SCALE: 1/� /1 1' 0" 0 1' 2' 8' 16'
9'-0" 2ND FLOOR PLATE HEIGHT
8'-0" WINDOW HEADER HEIGHT
SECOND FLOOR HEIGHT
II 1/8" TJI JOISTS
10'-0" IST FLOOR PLATE HEIGHT
8'-0" WINDOW HEADER HEIGHT
I1
0'-0" FIRST FLOOR HEIGHT
II 1/8" TJI JOISTS
TOP OF FOUNDATION WALL
9'-0" 2ND FLOOR PLATE HEIGHT
8'-0" WINDOW HEADER HEIGHT
SECOND FLOOR HEIGHT
II 1/8" TJI JOISTS
10'-0" IST FLOOR PLATE HEIGHT
8'-0" WINDOW HEADER HEIGHT
0'-0" FIRST FLOOR HEIGHT
II 1/8" TJI JOISTS
TOP OF FOUNDATION WALL
ELEVATION KEY
I.
SHINGLE ROOF
2.
CONTINUOUS ROOF VENT (TYP., ALL RIDGES)
3.
1 X 6 RAKE BOARD
4.
FRIEZE TRIM, (SEE 5-1, A-6)
S.
HARDI-BOARD HORIZONAL LAP SIDING
6.
MASONRY BRICK
I.
1"X6" SURROUND
8.
BUILDING PROFILE BEYOND
9.
GAS FIREPLACE FLUE
10.
BRICK SOLDIER
11.
IX6 TRIM OVER 2X6 BAND BOARD
12.
ROOM PROFILE BEYOND
13.
WOOD TRIM I"X6"
14.
SHED ROOF
15.
CANTED BRICK SILL ROWLOCK
16.
SCREEN
11.
CONCRETE STEPS TO GRADE
18.
SLAB EDGE
19.
SOLDIER HEADER OR SILL
20.
RAILING ASSEMBLY. SEE BLDR. SPECS.
21.
ICE AND WATERSHIELD AS REQ'D
22.
1/2 BRICK VENEER ON FAUX CHIMNEY. VERIFY FINAL
CHIMNEY LOCATION PER HOA REQUIREMENTS.
SQUARE FOOTAGE TABLE
FOUNDATION
CRAWL SPACE
FIRST FLOOR
FINISHED SQUARE FOOTAGE
GARAGE SQUARE FOOTAGE
SCREEN PORCH SQUARE FOOTAGE
FRONT PORCH SQUARE FOOTAGE
SECOND FLOOR
1541 SF
1624 SF
582 SF
212 SF
52 SF
FINISHED SQUARE FOOTAGE 1573 SF
UNFINISHED SQUARE FOOTAGE 0 SF
TOTAL FINISH SQ. FT. 3197 SF
TOTAL SQUARE FOOTAGE 3197 SF
U
c:
Q
�
®
®�
O
z
®I=
0
Lo
®._
z
Q
U
},
z
N
E
E
U
n rr�
L
VJ
Q
o
Z
J
w
m
cc
wcc
Q
0
Z
N
o
r
w
Of
U
z
Q
El
0
SHEET
A-1
DQ
D
W
C-)
cv
o �!
O
0
o
0
u
P-1
RIGHT ELEVATION 4 a LEFT
,5i-ALl 114 11I1 011
ELEVATIUN .
9'-0" 2ND FLOOR PLATE HEIGHT
8'-0" WINDOW HEADER HEIGHT
SECOND FLOOR HEIGHT
II 1/8" TJI JOISTS
10'-0" IST FLOOR PLATE HEIGHT
8'-0" WINDOW HEADER HEIGHT
0'-0" FIRST FLOOR HEIGHT
11 1/8" TJI JOISTS
TOP OF FOUNDATION WALL
9'-0" 2ND FLOOR PLATE HEIGHT
8'-0" WINDOW HEADER HEIGHT
SECOND FLOOR HEIGHT
II 1/8" TJI JOISTS
10 —0 IST FLOOR PLATE HEIGHT
8'-0" WINDOW HEADER HEIGHT
0'-0" FIRST FLOOR HEIGHT
II 1/8" TJI JOISTS
TOP OF FOUNDATION WALL
ELEVATION KEY
I.
SHINGLE ROOF
2.
CONTINUOUS ROOF VENT (TYP., ALL RIDGES)
3.
1 X 6 RAKE BOARD
4.
FRIEZE TRIM, (SEE 5-1, A-6)
S.
HARDI—BOARD HORIZONAL LAP SIDING
6.
MASONRY BRICK
I.
1"X6" SURROUND
8.
BUILDING PROFILE BEYOND
9.
GAS FIREPLACE FLUE
10.
BRICK SOLDIER
11.
IX6 TRIM OVER 2X6 BAND BOARD
12.
ROOM PROFILE BEYOND
13.
WOOD TRIM I"X6"
14.
SHED ROOF
15.
CANTED BRICK SILL ROWLOCK
16.
SCREEN
11.
CONCRETE STEPS TO GRADE
18.
SLAB EDGE
19.
SOLDIER HEADER OR SILL
20.
RAILING ASSEMBLY. SEE BLDR. SPECS.
21.
ICE AND WATERSHIELD AS REQ'D
22.
1/2 BRICK VENEER ON FAUX CHIMNEY. VERIFY FINAL
CHIMNEY LOCATION PER HOA REQUIREMENTS.
SQUARE FOOTAGE TABLE
FOUNDATION
CRAWL SPACE
1541
SF
FIRST FLOOR
FINISHED SQUARE FOOTAGE
1624
SF
GARAGE SQUARE FOOTAGE
582
SF
SCREEN PORCH SQUARE FOOTAGE
212
SF
FRONT PORCH SQUARE FOOTAGE
52
SF
SECOND FLOOR
FINISHED SQUARE FOOTAGE
1573
SF
UNFINISHED SQUARE FOOTAGE
0
SF
TOTAL FINISH SQ. FT. 3197 SF
TOTAL SQUARE FOOTAGE 3197 SF
U
c:
Q �
O z
®I=
z
Q U
}, z N
E
E L
VJcc
o
a�
oaf
moo 0
O�
� o cc
DQ
0
�Oo� DQ
—�
o�. �c
o'o Z
75
0 m
oo=
�cv
co
0
a � )
64.
75 75
o 0 �
lC� 0
SHEET
ICJ
A 2
w N
Q
o
Z
J
w
m
w�
Q
0
Z
N
o
r
w
U
z
�
Q
o
z
0
SCALE: 1/�" 1' 011