Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
A-302
GROUND FLOOR (T/SLAB) 100' -0" 2ND FLOOR (T/SLAB) 119' -8 1/4" 3RD FLOOR (T/GYP) 130' -5 5/8" 4TH FLOOR (T/GYP) 141' -1 1/2" 5TH FLOOR (T/GYP) 153' -4 3/8" B/LOWEST BOTTOM CHORD OF ROOF TRUSS 163' -4" RISER ROOMS LEVEL 100' -9" GROUND FLOOR (T/SLAB) 100' -0" GROUND FLOOR (T/SLAB) 100' -0" 2ND FLOOR (T/SLAB) 119' -8 1/4" 2ND FLOOR (T/SLAB) 119' -8 1/4" 3RD FLOOR (T/GYP) 130' -5 5/8" 3RD FLOOR (T/GYP) 130' -5 5/8" 4TH FLOOR (T/GYP) 141' -1 1/2" 4TH FLOOR (T/GYP) 141' -1 1/2" 5TH FLOOR (T/GYP) 153' -4 3/8" 5TH FLOOR (T/GYP) 153' -4 3/8"(APPROX CLEAR)8' - 10 1/2"(APPROX CLEAR)9' - 0"10 1/2"(LOWER CLG)9' - 0"LEVEL 2 (PARKING) 111' -0" A-315 E3 B/LOWEST BOTTOM CHORD OF ROOF TRUSS 163' -4" T/BACK SIDE PARAPET(S) 169' -0" A-313 C3 71' - 5"3' - 0"(APPROX CLEAR)9' - 10 1/2"(APPROX GROUND FLOOR TO B/DECK)19' - 2 1/4"A-311 A2 SIM OPP ARCHITECTURE ENGINEERING GEOSPATIAL│ │ 333 NORTH ALABAMA STREET SUITE 200 INDIANAPOLIS, IN 46204 317.299.7500 ISSUANCE SCHEDULE SHEET NAME: PROJECT NO: DATE ISSUED: NOT FOR CONSTRUCTION NUMBER DATE DESCRIPTION SHEET NO: DRAWN BY: CHECKED BY: PRELIMINARY SUBMITTAL BIM 360://NOVO Development_1215 Rangeline-Indy/A_1215 Rangline_R20.rvt6/24/2022 11:14:58 AMBUILDING SECTIONS A-302 RH RH 081948 06/24/22PROSCENIUM PHASE II (1215)NOVO DEVELOPMENT GROUP1215 RANGELINE RDCARMEL, IN 46032NEW MIXED USE MULTI-FAMILY PROJECT1/8" = 1'-0" BUILDING SECTIONB1 1/8" = 1'-0" BUILDING SECTIONB2 24'16'8'4'0 1/8"=1'-0" GRAPHIC SCALE