Loading...
HomeMy WebLinkAboutDept Report 5-16-06 u u CARMEL PLAN COMMISSION DEPARTMENT REPORT May 16, 2006 6H.. Docket No. 06030024 DP AmendlADLS: Carmel Family Physicians The applicant seeks approval for the construction of a medical office building. The site is located at 310 Medical Drive and is zoned B-8. Filed by Mike Armstrong of Shamrock Builders for Carmel Family Physicians. The applicant is requesting approval of the request to build a two-story, 1l,618-square foot medical office building on the site of a previously-existing medical office building Please see the informational packet prepared by the applicant for an overview of this project. The proposed structure will replace an existing medical office building that was demolished after a fIre in late 2005. The proposed structure is larger than the previous, thus it must return for DP and ADLS approval. The design of the proposed building is similar to other structures in the area. A total of 53 parking spaces would be provided (47 spaces are required). The proposed building would sit in approximately the same location on the lot as the previous building. This item was discussed at the April 19, 2006 Technical Advisory Committee meeting. Issues discussed at that meeting included landscaping and building design. The roofline in the submitted elevations needs to be broken up considerably. In the packet, the elevations look drastically different than "illustrative building rendering" (dormer size is different, number of windows is different, and the building length is different). The petitioner should be prepared to present true scaled elevations for review. Petitioner should bring the following to the Committee meeting: 1. Scaled elevations, building material samples. 2. Update on landscape plan and engineering approvals. The Department recommends that this item be forwarded to the Special Studies Committee on June 6, 2006, for further discussion. Page 1 of 1 .... ;::" ... u u DeVore, Laura B Sent: To: Cc: From: Griffin, Matt L Friday, May 12, 200610:07 PM DeVore, Laura B Brad Schneider; Charlie Frankenberger (E-mail); Dave Barnes (E-mail); Jim Shinaver (E-mail); John Pearson; John Talbot (E-mail); Jon Isaacs (E-mail); Keeling, Adrienne M; Kevin Roberts PE (E- mail); Larry Kemper (E-mail); Mark Monroe (E-mail); Mary Solada (E-mail); Matthew Skelton (E- mail); Mike Armstrong (E-mail) Subject: Carmel Plan Commission Reports: May 16, 2006 Please see the attached. Matthew L. Griffin, AICP Planning Administrator Department of Community Services City of Carmel One Civic Square Carmel, IN 46032 phone: 317.571.2417 fax: 317.663.3208 email: mgriffin@carmel.in.gov 5/16/2006 _________________ -------_-----1-