HomeMy WebLinkAboutGN001
CONSTRUCTION GUIDELINE
Foley, John & Melissa
13988 Twin Lakes Circle West, Carmel, IN 46074
Scope of Work:
Install a single pitch pavilion 14’ x 13’ with asphalt shingles. Pitch = 2/12
Structure Height = 10’ 6”
Posts:
6” x 6” Rough Sawn Cedar
Beam:
4” x 10” Rough Sawn Cedar
Ledger Board:
2” x 10” Rough Sawn Cedar
Rafters:
2” x 8” Pressure Treated Lumber
No equipment the size of a bobcat, mini excavator, or larger will be used for this project.