Loading...
HomeMy WebLinkAboutMinutes TAC 5-16-01 1" Village of West Clay - Sec~ion V02 (Secondary Plat) The site is located southeast of West 131st Street and Towne Road. The site is zoned PUD/Planned Unit Development. Filed by Keith Lash of the Schneider Corporation for Brenwick TND Communities, LLC. Keith Lash and Jose Kreutz presented this secondary plat and the following two cases. All are part of the Village of West Clay. Section VOl contains eight lots on 5.436 acres in the middle of the development. The pond exists; much of the road infrastructure is in place. The exhibit detailed existing infrastructure. The development of this area is minor; there is very little storm sewer system. There is one street extension and one sanitary sewer extension. There is also water. Detention has been accounted for in a previous section. Mr. Lash received a few comment letters. Rick McClain stated the project is running well. He had no other comment. Dick Hill, Chuck Shupperd, and Jeff Kendall had no comments. Scott Brewer talked with Parks Pifer and will meet with him tomorrow. Jose Kreutz gave Mr. Brewer a set of landscape plans. The other plantings are street trees. Steve Cash needs the procedure items. John South believes his letter is incorrect stating the plan does not satisfy 3271AC 15-5 (Rule 5). Mr. South will change this error. A notice of intent is needed for the NOI situation. There will be one erosion control plan. A 2001 construction season plan will be written in the next month. Gary Hoyt sent a letter. He had no comment. Jon Dobosiewicz will write a comment letter. They need to lengthen diameters and change some markers. Another issue is the commitment on road improvements. Laurence Lillig and Jon Dobosiewicz will write a letter regarding this work along with the review of the primary plat. Mr. Dobosiewicz wants to be more timely with plat signatures. Chris Burt asked when construction would begin. Jose Kreutz presented an overview of the project. He distributed maps of West Clay. The custom market has declined. But, there is considerable activity with the townhomes and smaller 50-foot lots. He anticipates continuing in this manner throughout the year. Emphasis is on their Village Product. A total of 68 lots have been developed. Eight lots are left to be sold. Work will start on sections 5006 and V02 some time in June. They will be simple to construct from an infrastructure standpoint. There are buyers for the two lots in the second section to be heard this morning. The third section, 7501-A, involves the addition of an alley. The lots are their middle-ground product. The buying market wants an alley with their lots. The typical buyers are empty nesters and young professional couples. There are 94 lots available in WestClay. The project has proved to be a success, but some areas are not selling. Brenwick recognizes that they keep returning with plats to be reviewed with no immediate action on their part. There is a 60 to 90 delay. Market consumer confidence is low; Brenwick is trying to react. Mr. Kreutz wanted to explain the thinking behind their actions. Next, AG01, AG02, and the s:\TeclmicalAdvisoryCommittee\Minutes\tac200 lmay 5 ;" 6502 will be developed. A home show is being contemplated for the third quarter of 2002. Then, something will be developed along Towne Road and areas north of 131 st Street. s:\TechnicalAdvisoryCommittee\Minutes\tac200 lmay 6 . Carmel/Clay Technical Advisory Committee Minutes May 16,2001 9:00 a.m. Members present: Laurence Lillig - Carmel DOCS Scott Brewer - Carmel Urban Forester Steve Cash - Ham. Co. Surveyor Dick Hill - Carmel Eng. Steve Broermann - Ham. Co. Highway Jeff Kendall- Carmel Permit Services Jon Dobosiewicz - Carmel DOCS Jim Foster - Carmel Fire Dept. s:\TechnicalAdvisoryCommittee\Minutes\tac200 lmay John South - Ham. Co. Soil & Water Chuck Shupperd - Indiana Gas John Lester - Carmel Parks Gary Hoyt - Carmel Fire Dept. Bill Akers - Carmel Communications Rick McClain - Cinergy Sharon Prater -Panhandle E. Pipeline Chris Burt - Ham Co. Highway Dept. 1