Loading...
HomeMy WebLinkAboutkiefer FINISHED layout (1)ROOF TRUSS PLACEMENT GUIDE NOTE: ALL DIMENSIONS SHOWN 0-0-0 ARE IN FEET-INCHES-SIXTEENTHS CUSTOMER: MICHAELIS CORP.MODEL: KIEFER JOBCOMMUNITY:SCALE:DATE:DESIGNED BY:LOT#:NOT TO SCALE9/12/22ROGER WILLIAMSSHIP DATE:Building CodeROOF LOADING:-IRC2018/TPI2014JOB #: J22206288THIS LAYOUT IS INTENDED FOR THE PURPOSE OF TRUSS LOCATION AND PLACEMENT ONLY. REFER TO THE BUILDING PLANS FOR ACTUAL BUILDING CONSTRUCTION A) DO NOT CUT OR MODIFY TRUSSES. B) TRUSSES ARE SPACED 24" ON CENTER UNLESS NOTED OTHERWISE. C) REFER TO THE INDIVIDUAL TRUSS DESIGN DRAWINGS FOR THE LOCATION OF MEMBER BRACING, UPLIFT, AND TRUSS END REACTIONS. D) PER ANSI TPI 1-2002 THE TRUSS ENGINEER IS RESPONSIBLE FOR DESIGNING THE TRUSS TO TRUSS CONECTIONS AND TRUSS PLY TO PLY CONNECTIONS. THIS PLACEMENT PLAN RECOMMENDS TRUSS TO BEARING CONNECTIONS AND TRUSS TO BEAM CONNECTIONS WHICH SHALL BE REVIEWED BY THE BUILDING DESIGNER TO RESOLVE ALL ROOF FORCES ADEQUATELY TO THE FOUNDATION. E) INSTALLATION OF ALL TEMPORARY AND PERMANENT BRACES ARE ESSENTIAL. SEE TRUSS DRAWINGS, BCSI-B2 SUMMARY SHEET AND BUILDING DESIGNER REQUIREMENTS. NOTES: 3D VIEW 20 TLL 10 TDL 10 BDL9028 Old S.R. 67 SouthMooresville, IN 46158Phone: (317) 834-5380Fax: (317) 834-5390Carter-Lee Building ComponentsCERTIFIED PLANTTMTruss TechnicianTMProBuild North11058ProBuild NorthTTT Level IIIROGER WILLIAMSGE01GE02GE03GE04GE05GE06T01(8) T02(9)T03(4) T04(2) T05(8)22-11-0012-08-002-05-006-00-00 15-11-08 18-10-00 10-09-08 2-05-0025-11-009-08-0027-08-0023-11-00 1-04-0816-03-00 2-00-002-00-002-00-002-00-002-00-002-00-002-00-001-10-00 5-001-04-082-00-002-00-002-00-002-00-002-00-002-00-002-00-002-00-002-00-002-00-002-00-002-00-002-00-001-11-08 2-00-002-00-002-00-002-00-002-00-002-00-002-00-002-00-002-00-002-00-002-00-001-11-00HTU26HTU26HTU26HTU26HTU26HTU26HTU26HTU26HTU26 DROP BEAM FLUSH BEAM STICK FRAME 09/30/22