Loading...
HomeMy WebLinkAboutL320 Planting DetailsTREESQTYBOTANICAL NAMECOMMON NAMECONT CALREMARKSCer-c2Cercis canadensisEastern RedbudB & B8` ht.multi-trunk, matchedGle-t4Gleditsia triacanthos inermis ``Draves`Street Keeper HoneylocustB & B2.5"Calfull, strong central leader, matched (substitution forNorwegian Sunset MapleNys-s5Nyssa sylvaticaSour GumB & B2.5"Calfull, strong central leader, matchedQue-x26Quercus robur `Fastigiata`Columnar English OakB & B2.5"Calspring dug, full, strong central leader, matchedQue-x6Quercus robur `Long`Regal Prince English OakB & B2.5"Calspring dug, full, strong central leader, matchedSHRUBSQTYBOTANICAL NAMECOMMON NAMESIZEHEIGHTREMARKSHyd-e10Hydrangea macrophylla `Endless Summer Twist-n-Shout`Twist-n-Shout Hydrangeacontainer18" ht. min.space @ 3`-6" o.c.Rho-p6Rhododendron x 'P.J.M.'PJM Rhododendroncontainer18" ht. min.space @ 5'-0" o.c.Vib-x10Viburnum x juddiiJudd Viburnumcontainer18" ht. min.space @ 5`-0" o.c.PLANT SCHEDULEDRAWING TITLE:CERTIFIED BY:DRAWING NUMBERPROJECT NUMBERREVISIONS:SCOPE DRAWINGS: These drawings indicate the general scope of the projectin terms of architectural design concept, the dimensions ofthe building, the major architectural elements and the typeof structural, mechanical and electrical systems. The drawings do not necessarily indicate or describe allwork required for full performance and completion of therequirements of the Contract. On the basis of the general scope indicated or described,the trade contractors shall furnish all items required for theproper execution and completion of the work.ISSUE DATEDRAWN BYCHECKED BY10/05/22MAJSPROJECT: CARMEL MIDTOWN21-1489CARMEL, INNOT FORCONSTRUCTION21-1489L320 PLANTINGDETAILSMAJTS03/23/22456PERENNIAL PLANTINGNot to ScaleNote: All perennial beds shall be plantedusing triangular planting scheme. Refer toPlanting Schedule for On-Center plantingdimension.3" Shredded Hardwood Bark MulchRemove Container12" Prepared Soil; Refer to SpecificationsCompacted SubgradeExisting GradeGROUNDCOVER PLANTINGNot to ScaleNote: All groundcover beds shall be plantedusing triangular planting scheme. Refer toPlanting Schedule for On-Center plantingdimension.Refer to Plans for Finish Grade.3" Shredded Hardwood Bark MulchSplit Peat Pot12" Prepared Soil; Refer to SpecificationsCompacted SubgradeSPADE EDGENot to ScaleExisting GradeArea to Receive Hardwood Bark MulchTopsoil (As Specified)5"3"3"NOTE: Provide Spaced Edge alongall bed edges adjacent to lawn areas.1DECIDUOUS TREE PLANTING DETAILNot to ScaleNot to Scale2SHRUB PLANTING DETAILNot to Scale3CONIFEROUS TREE PLANTING DETAIL