HomeMy WebLinkAboutIN-Ambleside-4-Unit Bldg-Slab-CP 3.0\A1;{\W1;End Unit - Front Door Left\PElevation 4}}PRODUCTION MANAGER
DATE / DESCRIPTIONREV #
NOTE: SCALES NOTED ON DRAWINGS RELATE TO FULL SIZE PLOTS ON 22x34 SHEETS - 11x17 SHEETS REPRESENT 1/2 SCALE PLOTS
INITIAL RELEASE DATE:CURRENT RELEASE DATE:
PLAN NAME
SHEETNPC PLAN NUMBER
STAMP
(c) Copyright Pulte Home Corporation - 2022
JL09-02-202209-02-2022
20' Unit
2463 Indiana Division11590 North Meridian Street, Suite 530Carmel, Indiana 46032PLOTTED: September 1, 2022 / Jeffrey Moskovciak / IN-AMBLESIDE-4-UNIT BLDG-SLAB.DWG
CP
3.0IN - AMBLESIDE CommunityREAR & SIDE ELEVATIONS4-Unit Building REAR ELEVATION - 4-UNIT BUILDING 1/8"=1'-0"
LP LP LP Unit #2101
-
Unit #2102
-
Unit #2103
-
Unit #2104
-
LEFT SIDE ELEVATION - 4-Unit Building 1/8"=1'-0"RIGHT SIDE ELEVATION - 4-Unit Building 1/8"=1'-0"
Frankton
Slab Foundation - Elevation 4
LEFT END UNIT ELEVATION
Frankton
Slab Foundation - Elevation 4
RIGHT END UNIT ELEVATION
Unit #2101
-
Unit #2104
-
Frankton End Unit
Front Door LEFT
Elevation 4
Fairwood Int. Unit
Front Door LEFT
Elevation 5
Frankton End Unit
Front Door RIGHT
Elevation 4
Frankton Int. Unit
Front Door LEFT
Elevation 3
14530 Brecon Lane14524 Brecon Lane14518 Brecon Lane14512 Brecon Lane
14530 Brecon Lane 14512 Brecon Lane
10/10/22