Loading...
HomeMy WebLinkAboutIND Central Zone - Master Foundation Details-SD.06PLAN NAME SHEET COMMUNITY NAME PRODUCTION MANAGER LAWSON COMMUNITY ID RELEASE DATE:DATE / DESCRIPTION NPC PLAN NUMBERLAWSON PLAN IDLEGACY PLAN NUMBER / NAME SPECIFICATION LEVEL GARAGE HANDING REV # PROJECT TYPENOTE: SCALES NOTED ON DRAWINGS RELATE TO FULL SIZE PLOTS ON 22x34 SHEETS - 11x17 SHEETS REPRESENT 1/2 SCALE PLOTS CURRENT ARCHITECT OF RECORD:ENGINEER OF RECORD: 4/25/13JGF (c) Copyright PulteGroup, Inc. - 2011 Pulte Central Zone1901 North Roselle Road, Suite 1000Schaumburg, Indiana 60195SINGLE FAMILY ---- ---- ---- ---- ---- ---- ---- ---- ---- PULTE GROUPMULHERN & KULP SD.06 \A1;08/05/2013\A1;03/14/2014Indiana DivisionOverhanging Sheathing DetailsSlab on Grade - No Ledge at Porch\A1;04/28/2014 1RECESSED SHOWER @ SLAB ON GRADESCALE: 3/4"=1'-0" \A1;SEE PLANS \A1;3 1/2" \A1;DEPRESS SLAB 3{\H0.7x;\S1#2;}" IN AREA OF SHOWER FOR MUD SET TILE. \A1;THIN SET CERAMIC TILE AT BATHROOM FLOOR. MUD SET TILE AT SHOWER. NO CURB. 2RECESSED SHOWER @ OPTIONAL BASEMENTSCALE: 3/4"=1'-0" \A1;SEE PLANS \A1;3 1/2" \A1;DEPRESS FLOOR 3{\H0.7x;\S1#2;}" IN AREA OF SHOWER FOR MUD SET TILE. \A1;THIN SET CERAMIC TILE AT BATHROOM FLOOR. MUD SET TILE AT SHOWER. NO CURB. FLOOR JOISTS -SEE PLAN \A1;FRAME-OUT SHOWER AREA ABOVE WITH LSL BEAMS TO MATCH FLOOR SYSTEM DEPTH (SEE PLANS)\A1;2x8 FLOOR JOISTS @ 16" O.C. SET LOW UNDER OPT. SHOWER ABOVE & HANGER TO BEAM AS REQUIRED. (SEE PLANS FOR DIRECTION) SLOPESLOPE\A1;3 1/2"SLOPESLOPE\A1;3 1/2" \A1;2x4 LEDGER TO SUPPORT SUBFLOOR @ PARALLEL CONDITION \A1;2x10 RIM \A1;2x10 CANT'D. JOIST\A1;X FASTEN BOTTOM PLATE TO DBL RIM w/ 12d NAILS @ 6" o.c.FLOOR SHEATHING -SEE PLANS \A1;(2)2x10 RIM. EXTEND EXTERIOR WALL SHEATHING TO BOTTOM OF RIM. \A1;X\A1;X\A1;X\A1;X\A1;X \A1;LAP 2x10 JOIST w/\PPOST & FASTEN w/\P(6) {\H0.7x;\S1#4;}" x 4" LONG SDS SCREWS\P(TYP. EA. END) EXTERIOR WALL BEYOND. SEE PLAN 3SCALE: 3/4"=1'-0"BUMPOUT DETAIL XX EXTERIOR WALL STUDS. SEE PLAN POST\P-SEE PLAN\A1;2x10 JOIST. LAP w/ POST & FASTEN w/(6) {\H0.7x;\S1#4;}"x4" LONG SDS SCREWS \P(TYP. EA END) (2)2x10 P.T. RIM.SIMPSON HUC210-2\PCONCEALED FLANGE HANGER (TYP.) SCALE: 3/4"=1'-0"PLAN X-X SHEARWALL EDGE NAILING PER SPECS\A1;FOUNDATION OR FLOOR SYSTEM BELOW\P-SEE PLANS YY \A1;1'-6"\P(MAX.) SIMPSON H2.5A CLIP \A1;SIMPSON A34 CLIP FASTENING 2x10 CANT'D TO DOUBLE STUD THIS DETAIL IS LIMITED TO A 9'-0" WIDE BAY WINDOW SEAT EXTERIOR WALL STUDS. SEE PLAN \A1;2x6 FLAT STUD FASTENED TO POST w/ {\H0.7x;\S1#4;}"x4" LONG SDS SCREWS @ 12" O.C. (2)2x10 P.T. RIM.SIMPSON HUC210-2\PCONCEALED FLANGE HANGER (TYP.) SCALE: 3/4"=1'-0"PLAN Y-Y POST\P-SEE PLAN SHEARWALL EDGE NAILING PER SPECS \A1;CRIPPLE WALL BEYOND RECESSED SHOWER DETAILS \A1;02/07/2018 \A1;2'-0" \P3'-0" @ 9' BSMT \A1;2'-0" \A1;2'-0" \A1;2'-0" \A1;4'-0" MAX.\A1;4'-0" MAX.\A1;VARIES\A1;VARIES\A1;8'-0" MIN. HORIZ REBAR RUNBACK #4 HORIZONTAL REBAR \P(8'-0" LONG AS SHOWN) #4 HORIZONTAL REBAR \P(12'-0" LONG AS SHOWN) #4 HORIZONTAL REBAR \P(16'-0" LONG AS SHOWN) #4 HORIZONTAL REBAR \P(20'-0" LONG AS SHOWN)(3)#4 VERTICAL REBAR \P(@12"o.c. AS SHOWN) (4)#4 VERTICAL REBAR DOWELED INTO FOOTING w/ 4" HOOK MIN. \P(@12"o.c. AS SHOWN)(4)#4 VERTICAL REBAR DOWELED INTO FOOTING w/ 4" HOOK MIN. \P(@12"o.c. AS SHOWN) \A1;3" \A1;12" \PMAX \A1;3" \A1;12" \PMAX TYPICAL FOUNDATION WALL FOOTING\P-SEE 1/SD-1.0TYPICAL FOOTING\P@ WALK-OUT\P-SEE 11/SD.02 21TYPICAL STEPPED BASEMENT FOUNDATION FOLLOWING GRADESCALE: 1/2"=1'-0" NOTE:\P2'-0" RETURN WALL AT REAR WALKOUT OR GARDEN BASEMENT IS NOT REQUIRED IF WALL IS EQUAL TO OR LESS THAN THIS STEP HEIGHT PLOTTED: July 15, 2019 / Coop04 / IND CENTRAL ZONE - MASTER FOUNDATION DETAILS.DWG 10/10/22