Loading...
HomeMy WebLinkAboutG002 - GENERAL-CONSTRUCTION NOTES#1 of 15 Date: 5.17.22 Sheet: Revision: www.caseindy.com 99 E. Carmel Drive, Suite 100 Carmel, Indiana 46032 317.846.2600 317.846.2601(f) These drawings have been prepared by Case Design & Remodeling solely for its use andshould not be reproduced or relied upon by any other parties. Dimensions shown or scaled are subject to change per actual job condition and must be verified. Materials are to be supplied as specified as equal or standard when not uniquely specified.Installed materials may vary in appearance from drawings. Reference manufacturer's product data for actual appearance and specifications.Studer ResidenceMorgan and Chris5643 Blackfoot TrailCarmel, Indiana 46033Approved By: Date: G002 PERMIT Maggie Smith Designer msmith@caseindy.com Amanda Chapman Project Developer achapman@caseindy.com GENERAL / CONSTRUCTION NOTES DDEEMMOOLLIITTIIOONN NNOOTTEESS PPRROOPPOOSSEEDD NNOOTTEESS #2 6.8.22 #3 7.22.22 #4 10.7.22 KITCHEN:KITCHEN: REMOVE AND HAUL KITCHEN TILE BACKSPLASH REMOVE AND HAUL COUNTERTOPS, SINK AND FAUCETS SALVAGE GARBAGE DISPOSAL FOR REINSTALLATION REMOVE AND HAUL CABINETRY AND CABINET HARDWARE DEMO PANTRY WALLS AND REMOVE DOOR, CASINGS, AND HARDWARE REMOVE AND HAUL CAN LIGHTS IN KITCHEN CEILING REMOVE AND SALVAGE REFRIGERATOR REMOVE AND HAUL RANGE, MW, DISHWASHER; VERIFY IF TEMPORARY SALVAGING NEEDED EXISTING FLOORINGS TO REMAIN MASTER BATH:MASTER BATH: REMOVE AND HAUL SHOWER ENCLOSURE, SHOWER PAN, AND SHOWER PLUMBING FIXTURES REMOVE AND SALVAGE TOILET FOR REINSTALLATION REMOVE AND HAUL TUB DECK, TUB, AND TUB FAUCET REMOVE AND HAUL VANITY TOPS, SINKS AND FAUCET REMOVE AND HAUL MIRRORS AND ACCESSORIES REMOVE AND HAUL VANITY CABINETS AND HARDWARE REMOVE AND HAUL TILE FLOOR REMOVE AND HAUL DOOR TO CLOSET 2 DEMO WALL BETWEEN CLOSET 1 AND 2 FOR NEW DOORWAY REMOVE AND HAUL BASE/SHOE AS NEEDED REMOVE AND HAUL CAN LIGHT OVER TUB REMOVE AND HAUL FAN/LIGHT IN TOILET ROOM KITCHEN:KITCHEN: PATCH AND REPAIR DRYWALL WALLS AND CEILINGS FROM DEMOLITION AND GENERAL ROUGH IN; MATCH TEXTURE CEILING FURNISH AND INSTALL NEW DUCT WORK FOR ENW HOOD BLOWER UNIT; DUCT TO EXTERIOR WITH NEW DAMPER FURNISH AND INSTALL NEW CABINETRY PER PLANS; THIS INCLUDES WOOD HOOD WITH EXHAUST INSERT; AND ACCESSORIES; SEE LOCATIONS IN PLAN FURNISH AND INSTALL NEW CABINETRY TRIMS TO MATCH CABINET FINISHES FURNISH AND INSTALL NEW CABINETRY HARDWARE FURNISH AND INSTALL NEW COUNTERTOPS FURNISH AND INSTALL NEW MOSIAC PICKET TILE BACKSPLASH THROUGHOUT; INSTALL SHLUTER TRIM FOR EXPOSED EDGES PAINT WALLS AND CEILINGS; BASE/SHOE TOUCH UP AS NEEDED PAINT CASINGS ON KITCHEN SIDE OF BACKDOOR, FAMILY ROOM DOOR, DINING DOORWAY, AND DOORWAY TO ENTRY MASTER BATH:MASTER BATH: FRAME NEW SHOWER THRESHOLD AND NEW SHOWER NICHE FRAME FOR NEW CLOSET DOORWAY BETWEEN CLOSET 1 AND 2; DOORWAY TO BE DRYWALL WRAPPED FRAME IN WHERE CLOSET 1 DOOR WAS REMOVED PATCH AND REPAIR DRYWALL WALLS AND CEILING FROM DEMOLITION AND GENERAL ROUGH IN AND FRAMING FURNISH AND INSTALL NEW VANITY CABINETRY FURNISH AND INSTALL NEW 8X20 SHOWER WALL TILE ON HORIZONTAL BRICK LAY; INSTALL 3X8 ACCENT BAND ON VERTICAL STRAIGHT LAY; INSTALL SHLUTER TRIM FOR EXPOSED EDGES FURNISH AND INSTALL NEW PENNY SHOWER FLOOR TILE FURNISH AND INSTALL NEW 12X24 ROOM FLOOR TILE ON 1/3 BRICK LAY PERPENDICULAR WITH VANITY CABINETS FURNISH AND INSTALL NEW VANITY COUNTERTOPS WITH 4" SPLASH; INCLUDES SHOWER PARTS TO MATCH (THRESHOLD PIECES AND NICHE CAP) FURNISH AND INSTALL 1 NEW GLASS SHELF ON CLIPS IN NICHE FURNISH AND INSTALL NEW CLEAR GLASS SHOWER ENCLOSURE WITH BRUSHED NICKEL HARDWARE FURNISH AND INSTALL NEW MIRRORS AT VANITY FURNISH AND INSTALL NEW ACCESSORIES PER PLANS; FIELD VERIFY INSTALL HEIGHT LOCATIONS WITH H.O. FURNISH AND INSTALL NEW BASE AND SHOW TO MATCH EXISTING IN BATHROOM AND CLOSET TUCK CARPET IN CLOSET AND INSTALL WOOD THRESHOLD BETWEEN CLOSETS WHERE WALL WAS REMOVED; PAINT THRESHOLD TO MATCH TRIM PAINT WALLS AND CEILINGS IN MASTER BATHROOM AND TOILET ROOM PAINT BOTH MODIFIED WALLS IN CLOSETS; INCLUDES BOTH SIDES OF NEW WALL WITH DOORWAY PAINT BASE/SHOE IN BATHROOM AND TOILET ROOM; INCLUDES PATCHING IN NEW BASE ON BOTH SIDES OF MODIFIED CLOSET WALL AND WHERE DOORWAY WAS FRAMED IN FURNISH AND INSTALL BATHROOM ACCESSORIES PER PLANS; FIELD VERIFY INSTALL HEIGHTS WITH H.O. 10/13/22