HomeMy WebLinkAboutA102 - PROPOSED PLAN-MASTER10'-2 1/4"
5'-9 3/4" 10'-6"7'-3 1/4"2'-11"2'-7 1/8"3'-1"6 1/2"2'-9"4"4'-0"4'-0"2'-11 3/16" CL
2'-0" CL1'-2" CL5'-5 1/2" CL1'-5 3/8" CL1'-10 9/16"1'-4 9/16"2'-4"1'-10 3/4"
4'-11" 7"7 1/16"
5'-1"
1'-2"1'-2" 2'-9" 2'-3 15/16"PATCH WALLS AND BASE/SHOE
EFFECTED BY OPENING DOORWAY
BETWEEN CLOSETS
CLOSET 1
CLOSET 2
CLOSET SYSTEM/SHELVING BY H.O.
#1
of
15
Date:
5.17.22
Sheet:
Revision:
www.caseindy.com
99 E. Carmel Drive, Suite 100
Carmel, Indiana 46032
317.846.2600 317.846.2601(f)
These drawings have been
prepared by Case Design &
Remodeling solely for its use and
should not be reproduced or relied
upon by any other parties.
Dimensions shown or scaled are
subject to change per actual job
condition and must be verified.
Materials are to be supplied as
specified as equal or standard
when not uniquely specified.
Installed materials may vary in
appearance from drawings.
Reference manufacturer's product
data for actual appearance and
specifications.Studer ResidenceMorgan and Chris5643 Blackfoot TrailCarmel, Indiana 46033Approved By:
Date:
A102
PERMIT
Maggie Smith
Designer
msmith@caseindy.com
Amanda Chapman
Project Developer
achapman@caseindy.com
#2 6.8.22
#3 7.22.22
#4 10.7.22
PROPOSED PLAN: MASTER
SCALE: 3/8" = 1'10/13/22