HomeMy WebLinkAboutS101 - FOUNDATION PLAN4'-10"8'-4"1'-3"11"11" 11" 4' 11" 11" 11" 1'-9 1/8" 4'7'-1 1/2"7'-3 1/2"DNDN
PUBLIC SIDEWALK NEW CONCRETE
STEPS & LANDING
NEW PORTICO FOUNDATION
EXISTING HOUSE FOUNDATION
N
FOUNDATION PLAN NOTES:
FURNISH & INSTALL16"W X 8"D
CONTINUOUS CONCRETE FOOTING TO
MIN. 36" BELOW GRADE FOR NEW
PORTICO FOUNDATION AS SHOWN ON
PLAN.
FURNISH & INSTALL 12" CMU FOUNDATION
WALLS W/ BRICK LEDGE FOR NEW
PORTICO AS SHOWN ON PLAN.
FURNISH & INSTALL BRICK VENEER AT ALL
EXPOSED SIDES OF NEW PORTICO
FOUNDATION. NEW BRICK TO MATCH
EXISTING ON HOUSE AS CLOSELY AS
POSSIBLE.
FURNISH & INSTALL 4" CONCRETE SLAB
W/ EXPOSED AGGREGATE FINISH OVER
COMPACTED FILL FOR NEW PORTICO
FLOOR.
FURNISH & INSTALL NEW CAST-IN-PLACE
CONCRETE STEPS & LANDING FROM NEW
PORTICO TO PUBLIC SIDEWALK W/ BRICK
VENEER AT ALL EXPOSED SIDES &
TREADS AS SHOWN ON PLAN.
CONSTRUCTION
#0
ISSUE DATE:
2022-10-05
REV:
www.caseindy.com
99 E. Carmel Drive, Suite 100
Carmel, Indiana 46032
317.846.2600 317.846.2601(f)
These drawings have been prepared
by Case Design & Remodeling solely
for its use and should not be
reproduced or relied upon by any
other parties. Dimensions shown or
scaled are subject to change per
actual job condition and must be
verified. Materials are to be supplied
as specified as equal or standardwhen not uniquely specified. Installed
materials may vary in appearance
from drawings. Reference
manufacturer's product data for actual
appearance and specifications. MOORE RESIDENCEPORTICO ADDITIONCRAIG & REBECCA MOORE12629 MALCOMBE STREETCARMEL, INDIANA 46032Approved By:
Date:
S101
Jordan Stocklin
Designer
jstocklin@caseindy.com
262590174
JOB NUMBER:
FOUNDATION PLAN
SCALE: 1/4" = 1'
Dawn Ashburn
Project Developer
dashburn@caseindy.com
10/18/22