Loading...
HomeMy WebLinkAboutG001L ACQUIS CONSULTING ENGINEERS 9229 DELEGATES ROW, SUITE 550 INDIANAPOLIS, IN 46240 317.706.2075 WWW.LACQUIS.COM G001 CARMEL, INDIANA 46032 618 EAST MARKET STREET INDIANAPOLIS, INDIANA 46202 PH 317 / 264 8162 FX 317 / 264 8165 DESIGN TEAM CONTACTS AXIS ARCHITECTURE+INTERIORS ARCHITECT PROJECT LOCATION PROJECT CONTACTS OWNER SITE LOCATION OCCUPANCY CONST. TYPE III B BUILDING INFORMATION SQUARE FOOTAGE 33,414 GROSS SF HVAC RENOVATIONS TO DRAWING INDEX INDIANAPOLIS, IN 46240 FX 317/ 706 2076 PH 317/ 706 2075 L'ACQUIS CONSULTING ENGINEERS 9229 DELEGATES ROW, SUITE 550 MEP ENGINEER ANDRE MAUE, P.E. ONE CIVIC SQUARE CARMEL CITY HALL B CHRIS HAGAN G001 COVER SHEET ISSUED FOR BIDMAY 13, 2011GENERAL DRAWINGS:.....G002 CODE AND LIFE SAFETY PLANS A001 GENERAL NOTES SYMBOLS AND LEGENDS ARCHITECTURAL DRAWINGS: A002 WALL TYPES AND DETAILS A101 FIRST FLOOR CONSTRUCTION PLAN A102 SECOND FLOOR CONSTRUCTION PLAN A401 FIRST FLOOR REFLECTED CEILING PLAN A402 SECOND FLOOR REFLECTED CEILING PLAN M-001 SYMBOLS AND ABBREVIATIONS SHEET MECHANICAL DRAWINGS: A103 THIRD FLOOR CONSTRUCTION PLAN A403 THIRD FLOOR REFLECTED CEILING PLAN MD201 MECHANICAL FIRST FLOOR DEMOLITION DUCTWORK PLAN MD202 MECHANICAL SECOND FLOOR DEMOLITION DUCTWORK PLAN MD203 MECHANICAL THIRD FLOOR DEMOLITION DUCTWORK PLAN MD204 MECHANICAL FOURTH FLOOR DEMOLITION DUCTWORK PLAN MD301 MECHANICAL FIRST FLOOR DEMOLITION PIPING PLAN MD302 MECHANICAL SECOND FLOOR DEMOLITION PIPING PLAN MD303 MECHANICAL THIRD FLOOR DEMOLITION PIPING PLAN MD304 MECHANICAL FOURTH FLOOR DEMOLITION PIPING PLAN M-201 MECHANICAL FIRST FLOOR DUCTWORK PLAN M-202 MECHANICAL SECOND FLOOR DUCTWORK PLAN M-203 MECHANICAL THIRD FLOOR DUCTWORK PLAN M-204 MECHANICAL FOURTH FLOOR DUCTWORK PLAN M-301 MECHANICAL FIRST FLOOR PIPING PLAN M-301ALT MECHANICAL FIRST FLOOR PIPING PLAN ALTERNATE BID M-302 MECHANICAL SECOND FLOOR PIPING PLAN M-302ALT MECHANICAL SECOND FLOOR PIPING PLAN ALTERNATE BID M-303 MECHANICAL THIRD FLOOR PIPING PLAN M-303ALT MECHANICAL THIRD FLOOR PIPING PLAN ALTERNATE BID M-304 MECHANICAL FOURTH FLOOR PIPING PLAN M-401 MECHANICAL SECTIONS M-402 ENLARGED SCALE MECHANICAL ROOM PLAN M-501 MECHANICAL DETAILS M-601 MECHANICAL SCHEDULES ELECTRICAL DRAWINGS: E-001 SYMBOLS AND ABBREVIATIONS SHEET ED-201 ELECTRICAL FIRST FLOOR DEMOLITION PLAN E-202 ELECTRICAL SECOND FLOOR PLAN ED-202 ELECTRICAL SECOND FLOOR DEMOLITION PLAN ED-203 ELECTRICAL THIRD FLOOR DEMOLITION PLAN ED-204 ELECTRICAL FOURTH FLOOR DEMOLITION PLAN E-201 ELECTRICAL FIRST FLOOR PLAN E-203 ELECTRICAL THIRD FLOOR PLAN E-204 ELECTRICAL FOURTH FLOOR PLAN E-600 SCHEDULES CARMEL CITY CENTER COMMUNITY DEVELOPMENT CORPORATION RICHARD F. TAYLOR III, PRESIDENT CARMEL, IN 46032 FX 317/ 573-6857 PH 317/ 573-6040 REI CONSTRUCTION, LLC 1016 3rd AVENUE SW, SUITE 200 CONSTRUCTION MANAGER BRANDON WEDDLE R AR-19400087 E AR-19400087 ERTEGISTEGIS RRAA HC I THCITRRDNADNo.No. GDI DE WRERE E CEC TIHDD ETWE May 13, 2011 P:\ACTIVE PROJECTS\11021 - Carmel Bldgs - LAcquis\03 CD\City Hall\DWG\G001.dwg, 5/20/2011 8:48:59 AM, Bid and Permit