Loading...
HomeMy WebLinkAboutP-100 - UNDER FLOOR PLUMBING PLAN12 12 B B 11 11 9 9 8 8 7 7 6 6 5 5 4 4 2 2 C C D D E E B.4 B.4 3 3 10 10 3.3 3.3 B.5 B.5 D.5 D.5 C.5 C.5 A.9 A.9 A A 1.9 1.9 1 1 A.3 A.3 1.6 1.6 F F E.7 E.7 1.4 1.4 E.1 E.1 9.9 9.9 B.3 B.3 2.1 2.1 1.3 1.3 hq8 hq8 1 33 3 3 3 3 3 5 3 3 6 7 3 3 6 7 6 7 6 7 6 7 6 7 4" OW WOWOWOWOWWWW F4" OW 4" OW 4" OW 4" OW 4" OW 6" W 6" W 6" W 6" W 6" W P-301 2 6"SANITARY/WASTE INV. EL. = -6'-0" B.F.G. 3 3 4" V 4" V GENERAL PLUMBING NOTES: A. REFERENCE SHEET M-000 FOR PLUMBING SYMBOLS, LEGENDS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES. FOR PVC APPLICATION PROVIDE SCH. 40 PIPE SADDLE UNDER SEWER AND STORM UNDERGROUND LINES. LOOPED AROUND REBAR REINFORCING FLOOR SLAB 3/8" STAINLESS STEEL ROD SEWER OR DRAIN STAINLESS STEEL TURNBUCKLE PROVIDE HANGERS AT EVERY JOINT AND NO MORE THAN 4'-0" APART. STAINLESS STEEL CLAMP PLATE WITH STAINLESS STEEL NUTS BOTTOM OF DETENTION FIRST LEVEL 6" STORM LINE PROVIDE 12" AIR GAP AT TERMINATION OF STORM PIPING 36" x 36" SPLASH BLOCK SHEET TITLE SHEET NUMBER Kite Realty Group 30 South Meridian Street #1100 Indianapolis,Indiana 46204 Owner RATIO 101 South Pennsylvania Street Indianapolis, Indiana 46204 317-633-4040 Architect / Landscape Architect McComas/O'Donnell & Naccarato Structural Engineer Mechanical / Electrical / Plumbing Engineer Civil Engineer 1717 E. 116th Streeet, Suite 200 Carmel, Indiana 46032 317-580-0402 Circle Design Group 9229 Delegates Row, Suite 150 Indianapolis, Indiana 46240 317-781-6200 Kimley Horn 250 East 96th Street, Suite 580 Indianapolis, Indiana 46240 CDG PROJECT NO. SHEET ISSUE NOT FOR CONSTRUCTION SEAL | DATE Republic Airways Holdings 8909 Purdue Road, Suite 300 Indianapolis, Indiana 46268 Pure Development 815 East 65th Street, #200 Indianapolis, IN 46220 7/8/2022 8:43:17 AMP-100 UNDER FLOOR PLUMBING PLAN 22045 REPUBLIC CAMPUS - PARKING GARAGE 12195 N. Meridian Street Carmel, Indiana 46032 3/32" = 1'-0" UNDER FLOOR PLUMBING PLAN1 0 24'16' 8' N SHEET PLAN NOTES 1 SEE SITE/CIVIL DRAWINGS FOR CONTINUATION. 3 4"W UP TO FCO. 5 4"W UP TO ECO. 6 4"OW UP TO AREA DRAIN. 7 4"OW AND 6"ST UP. SEE DETAIL #2/P-100 FOR STORM LINE TERMINATION. NOT TO SCALE UNDERGROUND PIPE HANGER DETAIL3 NOT TO SCALE TYPICAL SPLASH BLOCK DETAIL2 08/09/22