HomeMy WebLinkAboutP-100 - UNDER FLOOR PLUMBING PLAN12 12
B
B
11 11
9 9
8 8
7 7
6 6
5 5
4 4
2 2
C
C
D
D
E
E
B.4
B.4
3 3
10 10
3.3 3.3
B.5
B.5
D.5
D.5
C.5
C.5
A.9
A.9
A
A
1.9 1.9
1 1
A.3
A.3
1.6 1.6
F
F
E.7
E.7
1.4 1.4
E.1
E.1
9.9 9.9
B.3
B.3
2.1 2.1
1.3 1.3
hq8
hq8
1
33
3
3
3
3
3
5
3 3
6
7
3
3
6
7
6
7
6
7
6
7
6
7
4" OW WOWOWOWOWWWW
F4" OW
4" OW 4" OW
4" OW 4" OW
6" W
6" W
6" W
6" W
6" W
P-301
2
6"SANITARY/WASTE
INV. EL. = -6'-0" B.F.G.
3 3
4" V 4" V
GENERAL PLUMBING NOTES:
A. REFERENCE SHEET M-000 FOR PLUMBING SYMBOLS, LEGENDS,
ABBREVIATIONS AND ADDITIONAL GENERAL NOTES.
FOR PVC APPLICATION PROVIDE
SCH. 40 PIPE SADDLE UNDER
SEWER AND STORM UNDERGROUND LINES.
LOOPED AROUND REBAR REINFORCING
FLOOR SLAB
3/8" STAINLESS STEEL ROD
SEWER OR DRAIN
STAINLESS STEEL TURNBUCKLE
PROVIDE HANGERS AT EVERY JOINT
AND NO MORE THAN 4'-0" APART.
STAINLESS STEEL CLAMP PLATE
WITH STAINLESS STEEL NUTS
BOTTOM OF
DETENTION
FIRST LEVEL
6" STORM LINE
PROVIDE 12" AIR GAP AT
TERMINATION OF STORM PIPING
36" x 36" SPLASH BLOCK
SHEET TITLE
SHEET NUMBER
Kite Realty Group
30 South Meridian Street #1100
Indianapolis,Indiana 46204
Owner
RATIO
101 South Pennsylvania Street
Indianapolis, Indiana 46204
317-633-4040
Architect / Landscape Architect
McComas/O'Donnell & Naccarato
Structural Engineer
Mechanical / Electrical / Plumbing Engineer
Civil Engineer
1717 E. 116th Streeet, Suite 200
Carmel, Indiana 46032
317-580-0402
Circle Design Group
9229 Delegates Row, Suite 150
Indianapolis, Indiana 46240
317-781-6200
Kimley Horn
250 East 96th Street, Suite 580
Indianapolis, Indiana 46240
CDG PROJECT NO.
SHEET ISSUE
NOT FOR CONSTRUCTION
SEAL | DATE
Republic Airways Holdings
8909 Purdue Road, Suite 300
Indianapolis, Indiana 46268
Pure Development
815 East 65th Street, #200
Indianapolis, IN 46220
7/8/2022 8:43:17 AMP-100
UNDER FLOOR
PLUMBING PLAN
22045
REPUBLIC
CAMPUS -
PARKING
GARAGE
12195 N. Meridian
Street
Carmel, Indiana
46032
3/32" = 1'-0"
UNDER FLOOR PLUMBING PLAN1 0 24'16' 8'
N
SHEET PLAN NOTES
1 SEE SITE/CIVIL DRAWINGS FOR CONTINUATION.
3 4"W UP TO FCO.
5 4"W UP TO ECO.
6 4"OW UP TO AREA DRAIN.
7 4"OW AND 6"ST UP. SEE DETAIL #2/P-100 FOR STORM LINE TERMINATION.
NOT TO SCALE
UNDERGROUND PIPE HANGER DETAIL3
NOT TO SCALE
TYPICAL SPLASH BLOCK DETAIL2
08/09/22