HomeMy WebLinkAboutChange_Order_3;_Calumet_Civil_Contractors,_Inc.;_($29,196.00);_16-ENG-37_116th_and_Medical_Drive_at_ DocuSign Envelope ID:C6116F7F-BE53-4F6E-A420-7D7E8247D1BB
City of Carmel Project 16- ENG-37 [APPROVEDSergey knm.,eu am,o ,a,m:a]
Roundabout Improvements : 116th Street
and Medical Drive at Range Line Road
CHANGE ORDER#3
Pay items are being created for added water main work and missing pay items on the contract. Items to
add include 8"ductile water main,8" gate valve,8" connection, 8" x 6" tapping sleeve with valve and 8"
electrofusion saddle. The number of calendar days is being increased by 3 days for this phase of work.
The Substantial and Final completion dates for the project are being extended by the same 3 days for
added work to the contract.
Contract Price prior to this Change Order $5,439,174.00
Contract Price will be changed by this Change Order $29,196.00
New Contract Price including this Change Order $5,468,370.00
Amount Adjusted Contract Cumulative%Change
Price from Original Contract
Original Contract $5,439,000.00 N/A N/A
CO1 $0.00 $5,439,000,00 0.0%
CO2 $174.00 $5,439,174.00 0.003%
CO3 $29,196.00 $5,468,370.00 0.5%
DocuSign Envelope ID:C6116F7F-BE53-4F6E-A420-7D7E8247D1BB
CITY OF CARMEL
TO: Jeremy Kashman CONTRACT CHANGE ORDER NO.: 3
City Engineer DATE: September 7, 2022
City of Carmel Indiana PROJECT NAME: 116th and Range Line RAB
One Civic Square CITY REQ. NO.:
Carmel, IN 46032 CITY PO NO.: 16-ENG-37
CITY PO DATE:
I. You are directed to make the following changes in this Contract:
Add pay items for missing water main items not shown on water main plans including 8"gate valve,
8"ductile water main,8"connection,8"x 6"tapping sleeve and 8"electrofusion saddle. The added
work is extending this phase of work by 3 days, including an extension to the substantial and final
completion date.
SCHEDULED ADJUSTMENT
ITEM AMOUNT (+)OR( ) DAYS
II. The following referenced Documents further describe the changes outlined in Paragraph I.
and are to be considered a part of this Change Order: R.F.P.: N/A W.D.C. NO.: N/A
The changes result in the following adjustment of Contract Price and Contract Time:
Contract Price prior to this Change Order $ 5,439,174.00
Contract Price will be increased by this Change Order $ 29,196.00
New Contract Price including this Change Order $ 5,468,370.00
Contract Time prior to this Change Order Days 10/3/2022 Substantial Completion Date
Contract Time prior to this Change Order 1 1/25/2022 Final Completion Date
Net increase resulting front this Change Order 3 Calendar Days
Current Contract Time including this Change Order 10/6/2022 Substantial Completion Date
Current Contract Time including this Change Order 11/28/2022 Final Completion Date
This Change Order is for full and final settlement of all direct, indirect, impact costs and time
extensions incurred at any time resulting from the performance of the changed work,
The Above Changes Are The Above Changes Are Accepted Approved
Recommended N O t Present
American Structurepoint,Inc. Calumet Civil Contractors, Inc.
ENGINEER CONTRACTOR
r1e'FnbeCtialiieLld3al'd, Mayor
9025 River Road,Suite 200 4898 Fieldstone Drive '1 .4'�f hilt& fJUv1t,
Address Address 'b¢aAoain .ke, Member
Indianapolis, IN 46240 Whitestown, IN 46075 Lori Olt -sota.
Cil Slale'Lip City Stale/Zip Lori
tWmber
Jeren as man.PE, ity Engineer
By: Parv7flz Bv: Shelbi Miller
A'l'"1"(='srpocuSigned by:
Phone: 317-281-9563 Phone: 317-362-1763 Sue WA-C r S
Sue WalfINg haaacs....1
09-14-2022 10/19/2022
Date: Date: 09-1R-2022 Date:
o«Sign Envelope ID:C61 ypnBE5a4SDA4 20-7D7Ew&D BB
= N CO
\
\ - u / o
% { 3 }
\ / \ \
Fi
/ \ \ j
- ( } /
\ .
•. ,\ / 3
\ g
\ \ ' \
..
j \ -
/ - k @ \
\ \ E. \ )
\ - \
C. / \ ._
\ C.'
73
ƒ ) 0 •z
_ § y j
\ \ .l
j _
5
71 - = - \
- - E -
\ \ { 4 j
\ \
U .2
— 2 - $
_ _ §
_ ^ - _ J j
- _
• \ } \ 2
Q / Ti / - Z • a -
` _ , j \ & e 5 e
V • } E 7 } g ƒ _ - 2
ii o - ii
\ s \: - Z.
- 2 - - \ 2 / .
_ _ a & . _ . - / { \ 2 \ CO
_ a)
_ g j E
/ \ _ }
- /
r. - : # . cc
t.— _ . _
4. . - " { ) /
\ . A J
` � \ / 2 - \ 7 / / •/
\ / 73- v. . \ 3 6 G
: . - e 6
% . - _ - } 2 / w
y _ 2 J ) _ } j j
0 6
o ms)nUvel ope ID:C6 1189BBE5$4mEA4 mJoE8 247D1BB
7 ` « = a \ Cr)
- _ _ = % ?
\ f 5 / \ 2
-I-,
\ - ƒ \ \ \ o
\ •
y \ - \ \ \ \
7 \ \ \ \
j \ \ z
dI
.I
y21
w = _ .... _ ....
\ \ \ \ /
■,'
7/
' !
< \ i
.
\
)
- - -
\ -
■f
«� _ / / / /
\_
- $
§ ^ \ § \ = z = \
- « « C - - - 8
\ - \ }
/ - 2 / @
` _ \ /
2 = j » / { )
2 / \ 2
}
_ \ - - _ j $
z - -
< _ : - 7 § 2
m _
\ ) 2 _ : \ \ j \
» - - - - / § - \ - CZ
\ \ \ \ \ \ \ \ \ - j _ \ \
DocuSign Envelope ID:C6116F7F-BE53-4F6E-A420-7D7E8247D1BB
N CO
07 1 r l r N
G n 1 r 1 N 0
'a F.:, r1 - .a- M
in i :".1. _ — rn
a _ r l l O
UA — —
re
ow it
'-i
1
•
,: ,.
T _ >.
id
d
F" !
i
•
•
-.y c 1 r I -.
r 1 n.
Q _ Q
s�
II
•
• I 7
a7 (,N r 1 X 7.
,, _ 'S
'C 1 r1 -
A -'(
S - -
o
.
J
Q
.2
!- cr'
Y7
- m
p
- - Q_'
i i c
- - J
-.r. 5 - _
:I - L l 0)
:I., - - - c
Oi
J , —
_ — i uj C
= Cl)
.m _ - r
+� y , 7 •
7. a C E—
DocuSign Envelope ID:C6116F7F-BE53-4F6E-A420-7D7E8247D1BB
CALUMET
CALUMET CIVIL CONTRACTORS, INC.
LETTER OF TRANSMITTAL
TO: City of Cannel DATE: 7/18/2022
PROJECT: 116th & Range Line RAB JOB: 21022
ATTN: David Machala RE: Change Order Request#2
Notes/Remarks:
Please use the pricing below to assist you in processing a Change Order as described below.
Thank you.
ITEM DESCRIPTION QTY UNIT UNIT PRICE EXTENSION
169 8" Ductile Iron Pipe 56 LF $166 $9,296
170 8" Gate Valve 1 EA $4,800 $4,800
171 8"Connection 2 EA $2,400 $4,800
172 8" Electrofusion Saddle 1 EA $4,500 $4,500
173 8" x 6" Tapping SaddleNalve 1 EA $5,800 $5,800
TOTAL $29,196
Sfie&i AtiteeN,
Shelbi Miller— Project Manager
4898 Fieldstone Dr. Whitestown, IN 46075 317-769-1900 FAX 317-769-7424