Loading...
HomeMy WebLinkAbout06050129 Misc. NOTES FOR: 06050129 ENCOMPASS NOTE PAD - 05/17/06 - PI DATE TIME NOTE TEXT '~o:ri~~' fo\ ~1Ai\tkt: **** STATE RELEASE 316534 INFO: --Listed as Standard type, but listed as a partially submitted/released project in the conditions section. --FIVE conditions total, reo 1.Partially submitted/released project 2.Shall be accessible to persons wlth disabilities 3.Bldg's heated and mechanically cooled need to provide the thermal performance required for components 4.Fire resistance ratings for exterior walls to meet table specifications 5.Bldg. to be protected with automatic fire extingulshing system, or exterior openings to the correct size and location to be provided. Builder stated that release should also have included ELEC, MECH, and PLUM. He is going to contact State and his architect to get these releases. He was told at submittal meeting on 5/17/06 that the Rough-in inspection will be put on hold until State release for these is received. ALSO discussed at meeting: hold will be placed on Rough for the above listed reason, and for submittal of plumbing contractor's name and State llcense number. ',Als'o, 'suite. number assignments' were given by S. Lillard. Space farthest' to the left (as you face the front'of' the building) will be 100. The next ".. space to the right is 120. The third space from the. left is 140. . The space' on the right end of the building, which will be Prudential Allen Real Estate,' will be 160. ,With this permit, suites 100 and 160 will be fully finished, and the two interior spaces will be in between shell and white box finish. Builder knows that those spaces will require further interior permits when they are going to be built out. Inspections, smoke walls and openings, and how fees may be assessed for additional/extra inspections were also discussed at the meeting. Docket # for project: 05090008 ADLS. Copy of Brewer's stamped site plan in file. As of submittal, Planning & Zoning cannot locate their stamped copies of the elevations, but per Matt Grlffin, they were stamped/approved. PAGE 1 OPERATOR slillard