Loading...
HomeMy WebLinkAboutFloor PlanUP UP 1 A 2.1 3 4 5 6 7 8 9 11 12 14 15 15 16 16 C.5 E.5 18 18 J 13.6 G.5 UP RAMP 6.52% SLOPE GARAGE ENTRY GARAGEENTRY25' - 7"7' - 9" 25' - 9"30' - 9" 16' - 0"16' - 0" 30' - 0"16' - 0" 16' - 0"30' - 0" 16' - 0"230' - 10" LIVE/ WORK B 110 LIVE/WORK B 111 LIVE/ WORK A 112 LIVE/ WORK A 113 LIVE/ WORK B 114 LIVE/WORK A 115 LEASING/AMENITIES 100 STAIR 1 ST1-1 RECYCLING 117 TRASH ROOM 118 STAIR 2 ST2-1 30' - 6"36' - 11"30' - 6"36' - 11"30' - 6"30' - 6"36' - 11"30' - 6"36' - 11"30' - 6"17' - 0"27' - 0"27' - 0"27' - 0"27' - 0"27' - 0"27' - 0"27' - 0"27' - 0"9' - 1"19' - 5"27' - 0"27' - 0"28' - 0"17' - 0"37' - 3"12' - 2" 17' - 0" 19' - 10" 17' - 5"27' - 7 1/2" ELEV 1 EL1- 1 ELEV 2 EL2- 1 STAIR 3 ST3-1 ELEV 3 EL3- 1 RISER ROOM 125 TOWNHOUSE A 133 TOWNHOUSE B 134 TOWNHOUSE B 136 TOWNHOUSE A 137 TOWNHOUSE A 138 TOWNHOUSE B 139 TOWNHOUSE B 141 TOWNHOUSE A 142 EV CHARGING STATION 2 13 17 17 H G F E D C B F. 9 10 30 ps)15 MINUTEPARKINGVANVAN 30 ps) LOADING ZONE 2ND FL = 197 ps) RAMP = 36 ps) 1ST FL= 169 ps) TOTAL = 402) C. 1 TOWNHOUSE A 135 8 ps) EV CHARGING STATION EV CHARGING STATION EV CHARGING STATION ELEVATOR LOBBY 126 STORAGE 123 RR 122 OFFICE 121 CAR WASH 120 MAINTENANCE SHOP 119 F. F.E. EL: -2' - 0"F. F.E. EL: 0"F. F. E.EL: 0"10. 8 1 1 1 3 121212 12 12 12 12 12 12 12 12 25 ps) 15 ps) 14 ps) 15 MINUTE PARKING DOG WASH 127 84)( 84) BIKE STORAGE 128 STORAGE 129 BIKE STORAGE 130 IDF 131 MDF 132 B. 1 B. 7 C. 6 D.3 D. 9 E.7 F.7 27' - 7 1/ 2"27' - 1 1/2" 20' - 0" 20' - 0" 27' - 0" 20' - 0" 19' - 9"LIVE/ WORK A 116 B. 4 G. 9 7 ps) AREA LEGEND Accessory Amenities Circulation Live/ Work TownHouse IT 124 FUTURE RESIDENT FUTURE RESIDENT TOWNHOUSE A 140 20) REFER TO ID SHEETS FOR MORE INFORMATION REGARDING THE LEASING/ AMENITIES SPACE 30 ps) 2 ps)(3 ps)(1 ps)(4 ps)MGR OFFICE 102 OFFICE 103 WORK ROOM 104 MECH U101 RR 105 PARCEL 108 398' - 9"160' - 10 1/2"77' - 9 3/4"238' - 8"E.4 D.4 C.8 LOBBY LOUNGE 106 COFFEE LOUNGE 101 MAIN LOBBY 107 MECH 130AMECH 128A MAIL 109 1 3 2 PARKING DRAWING TITLE:CERTIFIED BY:DRAWING NUMBER PROJECT NUMBER REVISIONS:SCOPE DRAWINGS:These drawings indicate the general scope of the project in terms of architectural design concept, the dimensions of the building, themajor architectural elements and the type of structural, mechanical and electrical systems.The drawings do notnecessarily indicate or describe all work required for full performance and completion of the requirements of the Contract.On the basis of the general scope indicated or described, the trade contractors shall furnish all items required for the proper execution and completion of the work.ISSUE DATE DRAWN BY CHECKED BYPROJECT:CARMEL MIDTOWN09/ 19/2022 JCC NSA 2020058 A101 FIRST FLOOR PLAN CARMEL, INSCALE: 1/ 16" = 1'- 0"A101 1 FIRST FLOOR PLAN NORTH PLAN NOTES 1 BOLLARDS. TYPICAL 2 TRANSFORMERS - SEE ELECTRICAL DRAWINGS FOR MORE INFORMATION.3 PROPOSED ELECTRICAL METER LOCATION - SEE MEP