HomeMy WebLinkAboutP-102B-SECOND FLOOR PLUMBING PLAN -AREA BP-400
2
(19,153 SQ.FT.)
3
1
2
(13,176 SQ.FT.)
(4,221 SQ.FT.)
1
2
4
5
1 2 3 4 5 6 7 8
D
E
F
G
H
I
7.7
D.8
D.3
3.2
1.8 2.2 2.3 2.4 3.8 4.13.9 5.4 5.5 5.6 6.4 6.5 6.6 7.4 7.5 7.6 7.8
C.8
5.2 6.2
CTP/ UPGRADE/SYSTEMS/ RECURRENT
24 STUDENTS
207
VIRTUAL CLASSROOM
216
CTP/ UPGRADE/ SYSTEMS/ RECURRENT
24 STUDENTS
217
CTP/ UPGRADE SYSTEMS/ RECURRENT
- 24 STUDENTS
218
CTP UPGRADE SYSTEMS/ RECURRENT
- 24 STUDENTS
219
FLIGHT OPS 48 PEOPLE
220
FLIGHT OPS 48 PEOPLE
221
FTD
208
DEBRIEF
208A
BRIEF
208B
DEBRIEF
209A
BRIEF
209B
DEBRIEF
210ABRIEF
210B
DEBRIEF
211A
BRIEF
211B
DEBRIEF
212ABRIEF
212B
FTD
212 FTD
211
FTD
210
FTD
209
LIFT CLASSROOM - 30 PEOPLE
202
CTP/ UPGRADE/ SYSTEMS/ RECURRENT
24 STUDENTS
203
ELEC
203A
EAGLES NEST
201A
STAIR/ ENTRY
201
MEN
223UNISEX
222
UNISEX
225
WOMEN
224JAN
226
STAIR/ ENTRY
201
NEW HIRE FLIGHT OPS 40 STUDENT
ROOM
206
NEW HIRE FLIGHT OPS 40 STUDENT
ROOM
205
1
2
(4,775 SQ.FT.)
6" ST
(3,358 SQ.FT.)
6" ST
6" ST
(9,818 SQ.FT.)7
8
8" ST
8" ST
8" ST
6" ST
(4,775 SQ.FT.)
6" ST
(8,996 SQ.FT.)
(8,996 SQ.FT.)
10" ST
10" ST
10" ST
10" ST
4" ST
4" ST
C.O.
(15,791 SQ.FT.)
(3,362 SQ.FT.)
10" ST
6
GENERAL NOTES:
1. PROVIDE NEW DOMESTIC WATER, SANITARY WASTE, STORM
DRAINAGE AND NATURAL GAS SYSTEMS FOR THIS BUILDING. PROVIDE
ALL NECESSARY COMPONENTS FOR FULLY OPERATIONAL SYSTEM.
INSTALL SYSTEMS IN ACCORDANCE WITH STATE REQUIREMENTS AND
LOCAL AUTHORITY HAVING JURISDICTION. COORDINATE THE
LOCATION OF ALL UTILITY CONNECTION POINTS, FLOOR DRAINS AND
HUB DRAINS FOR EQUIPMENT WITH OTHER TRADES.
2. ALL FLOOR PENETRATIONS TO BE SEALED WATER TIGHT AND
COMPLETELY PACKED WITH FIRE STOP MATERIAL BY TRADE
CONTRACTORS.
3. ALL PENETRATIONS THROUGH FIRE RESISTANCE RATED
CONSTRUCTION SHALL BE PROVIDED A UL LISTED THROUGH
PENETRATION FIRESTOP ASSEMBLY. THE RATINGS OF ALL FIRESTOP
ASSEMBLIES SHALL BE GREATER THAN OR EQUAL TO THE RATING OF
THE PENETRATED BARRIER.
4. CORE DRILL PENETRATIONS IN CONCRETE FLOORS OR WALLS 1-2
INCHES LARGER THAN THE PIPE DRIAMETER OF THE PENETRATING
PIPE.
5. NO STURCTURAL MEMBERS SHALL BE CUT, DRILLED OR BURNED
WITHOUT THE KNOWLEDGE AND WRITTEN APPROVAL OF OWNER.
6. CONTRACTOR SHALL PROVIDE LABELS (WITH FLOW ARROWS) FOR ALL
PIPING.
7. MAINTAIN MAIXIMUM HEADROOM AT ALL LOCATIONS. ALL PIPING TO
BE AS TIGHT TO THE UNDERSIDE OF DECK AS POSSIBLE. ALL
EXPOSED PIPING SHALL BE APPROVED BY ARCHITECT AND SHALL
MAINTAIN REQUIRED CLEARANCES.
8. STORM AND SANITARY PIPING ARE TO BE INSTALLED SLOPED AT CODE
ALLOWABLE SLOPES.
SHEET TITLE
SHEET NUMBER
Kite Realty Group
30 S. Meridian Street, #1100
Indianapolis, Indiana 46204
Owner
Republic Airways Holdings
RATIO
101 South Pennsylvania Street
Indianapolis, Indiana 46204
317-633-4040
Architect
McComas/O'donnell & Naccarato
Structural Engineer
Mechanical / Plumbing Design/Builder
Civil Engineer
8909 Purdue Road, Suite 300
Indianapolis, Indiana 46268
1717 E. 116th Street, Suite 200
Carmel, Indiana 46032
317-580-0402
DEEM LLC
6831 E 32nd Street
Indianapolis, Indiana 46226
Kimley Horn
250 East 96th Street, Suite 580
Indianapolis, Indiana 46240
KEY PLAN
B
A
HOTEL
PROJECT NO.
SHEET ISSUE
NOT FOR CONSTRUCTION
SEAL | DATE
COPYRIGHT NOTICE: THIS ARCHITECTURAL
AND ENGINEERING DRAWING IS GIVEN IN
CONFIDENCE AND SHALL BE USED ONLY
PURSUANT TO THE AGREEMENT WITH RATIO.
NO OTHER USE, DISSEMINATION OR
DUPLICATION MAY BE MADE WITHOUT PRIOR
WRITTEN CONSENT OF RATIO. ALL COMMON
LAW RIGHTS OF COPYRIGHT AND OTHERWISE
ARE HEREBY SPECIFICALLY RESERVED.
TRAINING
CENTER
Electrical Design/Builder
Barth Electric Co., Inc.
1934 N. Illinois Street
Indianapolis, Indiana 46202
10/15/2021 11:57:40 AMP-102B
SECOND FLOOR
PLUMBING PLAN -
AREA B
Republic Airways
Training Center
12195 N. Meridian St.
Carmel, Indiana
46032
1/8" = 1'-0"P-102B
1 SECOND FLOOR PLUMBING PLAN B
# PLAN NOTES
1 4" STORM UP TO OVERFLOW ROOF DRAIN.
2 4" STORM UP TO ROOF DRAIN
3 8" STORM DOWN ALONG COLUMN
4 8" STORM DOWN IN VOID SPACE
5 SEE ENLARGED PLAN FOR WORK IN THIS AREA (P-400)
6 10" STORM DOWN IN VOID SPACE.
7 6" STORM UP TO ROOF DRAIN.
8 6" STORM UP TO OVERFLOW ROOF DRAIN
10/19/22