Loading...
HomeMy WebLinkAboutRA-TC_compliance-report-20211027COMcheck Software Version 4.1.5.3 Envelope Compliance Certificate Project Title: 90.1 (2007) Standard Project Type:New Construction Vertical Glazing / Wall Area:28% Location:Carmel, Indiana Climate Zone:5a Construction Site: 12195 North Meridian Street Carmel, IN 46032 Owner/Agent: Marcus Menish Republic Airways 8909 Purdue Road Suite 300 Indianapolis, IN 46268 (317) 710-7086 mmenish@rjet.com Designer/Contractor: Jake Plummer RATIO 101 S. Pennsylvania Street Indianapolis, IN 46204 317-633-4040 jplummer@ratiodesign.com Project Information Energy Code: Republic Airways Training Center Building Area Floor Area 1-Office : Nonresidential 51142 Envelope Assemblies Assembly Cavity R-Value Cont. R-Value Proposed U-Factor Budget U- Factor(a) Gross Area or Perimeter Exterior Wall - EAST - MP stud: Steel-Framed, 16" o.c., [Bldg. Use 1 - Office] 5208 0.0 15.0 0.056 0.064 Window 1: Metal Frame with Thermal Break, Perf. Specs.: Product ID Kawneer 1600 CW, SHGC 0.28, [Bldg. Use 1 - Office] (b) 3183 ------0.460 0.550 Door 1: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf. Specs.: Product ID Trifab VG 451T, SHGC 0.21, [Bldg. Use 1 - Office] (b) 47 ------0.490 0.800 Exterior Wall - EAST - PC: Solid Concrete:12" Thickness, Normal Density, Furring: Metal, [Bldg. Use 1 - Office] 7464 0.0 9.5 0.081 0.090 Door 2: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf. Specs.: Product ID Trifab VG 451T, SHGC 0.21, [Bldg. Use 1 - Office] (b) 66 ------0.490 0.800 Door 3: Insulated Metal, Non-Swinging, [Bldg. Use 1 - Office]324 ------0.110 0.500 Exterior Wall - NORTH - PC: Solid Concrete:12" Thickness, Normal Density, Furring: Metal, [Bldg. Use 1 - Office] 6000 0.0 9.5 0.081 0.090 Door 4: Insulated Metal, Non-Swinging, [Bldg. Use 1 - Office]192 ------0.110 0.500 Door 5: Insulated Metal, Swinging, [Bldg. Use 1 - Office]22 ------0.110 0.700 Exterior Wall - NORTH - MP stud: Steel-Framed, 16" o.c., [Bldg. Use 1 - Office] 3838 0.0 15.0 0.056 0.064 Window 2: Metal Frame with Thermal Break, Perf. Specs.: Product ID Kawneer 1600 CW, SHGC 0.28, [Bldg. Use 1 - Office] (b) 3183 ------0.460 0.550 Door 6: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf. Specs.: Product ID Trifab VG 451T, SHGC 0.21, [Bldg. Use 1 - Office] (b) 47 ------0.490 0.800 Exterior Wall - WEST - PC: Solid Concrete:12" Thickness, Normal Density, Furring: Metal, [Bldg. Use 1 - Office] 6787 0.0 9.5 0.081 0.090 Project Title: Data filename: Republic Airways Training Center P:\2021\21040 - Republic Airways Training Center\Management\Code and Agency Approvals\IDHS\Train\Republic_Training Center Envelope Comcheck.cck 10/27/21Report date: 91 ofPage Assembly Cavity R-Value Cont. R-Value Proposed U-Factor Budget U- Factor(a) Gross Area or Perimeter Exterior Wall - WEST - MP stud: Steel-Framed, 16" o.c., [Bldg. Use 1 - Office] 7180 0.0 15.0 0.056 0.064 Window 3: Metal Frame with Thermal Break, Perf. Specs.: Product ID Kawneer 1600 CW, SHGC 0.28, [Bldg. Use 1 - Office] (b) 4558 ------0.460 0.550 Exterior Wall - SOUTH - PC: Solid Concrete:12" Thickness, Normal Density, Furring: Metal, [Bldg. Use 1 - Office] 6558 0.0 9.5 0.081 0.090 Exterior Wall - SOUTH - MP stud: Steel-Framed, 16" o.c., [Bldg. Use 1 - Office] 2836 0.0 15.0 0.056 0.064 Window 4: Metal Frame with Thermal Break, Perf. Specs.: Product ID Kawneer 1600 CW, SHGC 0.28, [Bldg. Use 1 - Office] (b) 1471 ------0.460 0.550 Roof 1: Insulation Entirely Above Deck, [Bldg. Use 1 - Office]50485 ---30.0 0.032 0.048 Floor 1: Slab-On-Grade:Unheated, Vertical 2 ft., [Bldg. Use 1 - Office] (c) 915 ---10.0 0.540 0.540 (a)Budget U-factors are used for software baseline calculations ONLY, and are not code requirements. (b)Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation. (c)Slab-On-Grade proposed and budget U-factors shown in table are F-factors. Envelope Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed envelope systems have been designed to meet the 90.1 (2007) Standard requirements in COMcheck Version 4.1.5.3 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Envelope PASSES: Design 8% better than code Project Title: Data filename: Republic Airways Training Center P:\2021\21040 - Republic Airways Training Center\Management\Code and Agency Approvals\IDHS\Train\Republic_Training Center Envelope Comcheck.cck 10/27/21Report date: 92 ofPage William A. Browne, Jr.10/27/21 Inspection Checklist Requirements: 100.0% were addressed directly in the COMcheck software COMcheck Software Version 4.1.5.3 Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Energy Code: 90.1 (2007) Standard Section # & Req.ID Plan Review Complies?Comments/Assumptions 4.2.2 [PR1]1 Plans and/or specifications provide all information with which compliance can be determined for the building envelope and document where exceptions to the standard are claimed. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Republic Airways Training Center P:\2021\21040 - Republic Airways Training Center\Management\Code and Agency Approvals\IDHS\Train\Republic_Training Center Envelope Comcheck.cck 10/27/21Report date: 93 ofPage Section # & Req.ID Footing / Foundation Inspection Plans Verified Value Field Verified Value Complies?Comments/Assumptions 5.5.3.3 [FO1]1 Below-grade wall insulation R- value. R-_____R-_____Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 5.5.3.5 [FO3]1 Slab edge insulation R-value.R-_____ Unheated Heated R-_____ Unheated Heated Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 5.8.1.2 [FO4]1 Slab edge insulation installed per manufacturer’s instructions. Complies Does Not Not Observable Not Applicable Requirement will be met. 5.5.3.5 [FO5]1 Slab edge insulation depth/length. _____ ft _____ ft Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 5.8.1.7.3 [FO7]1 Insulation in contact with the ground has <=0.3% water absorption rate per ASTM C272. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Republic Airways Training Center P:\2021\21040 - Republic Airways Training Center\Management\Code and Agency Approvals\IDHS\Train\Republic_Training Center Envelope Comcheck.cck 10/27/21Report date: 94 ofPage Section # & Req.ID Framing / Rough-In Inspection Plans Verified Value Field Verified Value Complies?Comments/Assumptions 5.4.3.2 [FR1]3 Factory-built fenestration and doors are labeled as meeting air leakage requirements. Fenestration____ _ cfm/ft2 Doors_____ cfm/ft2 Fenestration____ _ cfm/ft2 Doors_____ cfm/ft2 Complies Does Not Not Observable Not Applicable Requirement will be met. 5.4.3.4 [FR4]3 Vestibules are installed where building entrances separate conditioned space from the exterior, and meet exterior envelope requirements. Doors have self-closing devices, and are >=7 ft apart. Complies Does Not Not Observable Not Applicable Requirement will be met. 5.5.4.3a [FR8]1 Vertical fenestration U-Factor.U-_____U-_____Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 5.5.4.3b [FR9]1 Skylight fenestration U-Factor.U-_____U-_____Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 5.5.4.4.1 [FR10]1 Vertical fenestration SHGC value.SHGC:_____SHGC:_____Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 5.5.4.4.2 [FR11]1 Skylight SHGC value.SHGC:_____SHGC:_____Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 5.8.2.1, 5.8.2.4 [FR12]2 Fenestration products rated in accordance with NFRC. Complies Does Not Not Observable Not Applicable Requirement will be met. 5.8.2.2 [FR13]1 Fenestration products are certified as to performance labels or certificates provided. Complies Does Not Not Observable Not Applicable Requirement will be met. 5.8.2.3, 5.5.3.6 [FR14]2 U-factor of opaque doors associated with the building thermal envelope meets requirements. U-_____ Swinging Nonswinging U-_____ Swinging Nonswinging Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Republic Airways Training Center P:\2021\21040 - Republic Airways Training Center\Management\Code and Agency Approvals\IDHS\Train\Republic_Training Center Envelope Comcheck.cck 10/27/21Report date: 95 ofPage Section # & Req.ID Insulation Inspection Plans Verified Value Field Verified Value Complies?Comments/Assumptions 5.4.3.1 [IN1]1 All sources of air leakage in the building thermal envelope are sealed, caulked, gasketed, weather stripped or wrapped with moisture vapor-permeable wrapping material to minimize air leakage. Complies Does Not Not Observable Not Applicable Requirement will be met. 5.5.3.1 [IN2]1 Roof R-value. For some ceiling systems, verification may need to occur during Framing Inspection. R-_____ Above deck Metal Attic R-_____ Above deck Metal Attic Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 5.8.1.2, 5.8.1.3 [IN3]1 Roof insulation installed per manufacturer’s instructions. Blown or poured loose-fill insulation is installed only where the ceiling slope is <= 3:12. Complies Does Not Not Observable Not Applicable Requirement will be met. 5.5.3.1.1 [IN5]3 High-albedo roofs meet solar reflectance of 0.70 and thermal emittance of 0.75 or SRI of 82. SR:_____ SRI:_____ SR:_____ SRI:_____ Complies Does Not Not Observable Not Applicable Requirement will be met. 5.5.3.2 [IN6]1 Above-grade wall insulation R- value. R-_____ Mass Metal Steel Wood R-_____ Mass Metal Steel Wood Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 5.8.1.2 [IN7]1 Above-grade wall insulation installed per manufacturer’s instructions. Complies Does Not Not Observable Not Applicable Requirement will be met. 5.5.3.4 [IN8]1 Floor insulation R-value.R-_____ Mass Steel Wood R-_____ Mass Steel Wood Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 5.8.1.1 [IN10]2 Building envelope insulation is labeled with R-value or insulation certificate providing R-value and other relevant data. Complies Does Not Not Observable Not Applicable Requirement will be met. 5.8.1.4 [IN11]2 Eaves are baffled to deflect air to above the insulation. Complies Does Not Not Observable Not Applicable Requirement will be met. 5.8.1.5 [IN12]2 Insulation is installed in substantial contact with the inside surface separating conditioned space from unconditional space. Complies Does Not Not Observable Not Applicable Requirement will be met. 5.8.1.6 [IN13]2 Recessed equipment installed in building envelope assemblies does not compress the adjacent insulation. Complies Does Not Not Observable Not Applicable Requirement will be met. 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Republic Airways Training Center P:\2021\21040 - Republic Airways Training Center\Management\Code and Agency Approvals\IDHS\Train\Republic_Training Center Envelope Comcheck.cck 10/27/21Report date: 96 ofPage Section # & Req.ID Insulation Inspection Plans Verified Value Field Verified Value Complies?Comments/Assumptions 5.8.1.7 [IN14]2 Exterior insulation is protected from damage with a protective material. Verification for exposed foundation insulation may need to occur during Foundation Inspection. Complies Does Not Not Observable Not Applicable Requirement will be met. 5.8.1.7.1 [IN15]2 Attics and mechanical rooms have insulation protected where adjacent to attic or equipment access. Complies Does Not Not Observable Not Applicable Requirement will be met. 5.8.1.7.2 [IN16]2 Foundation vents do not interfere with insulation. Complies Does Not Not Observable Not Applicable Requirement will be met. 5.8.1.8 [IN17]3 Insulation intended to meet the roof insulation requirements cannot be installed on top of a suspended ceiling. Mark this requirement compliant if insulation is installed accordingly. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Republic Airways Training Center P:\2021\21040 - Republic Airways Training Center\Management\Code and Agency Approvals\IDHS\Train\Republic_Training Center Envelope Comcheck.cck 10/27/21Report date: 97 ofPage Section # & Req.ID Final Inspection Complies?Comments/Assumptions 5.4.3.3 [FI1]1 Weatherseals installed on all loading dock cargo doors in Climate Zones 4- 8. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Republic Airways Training Center P:\2021\21040 - Republic Airways Training Center\Management\Code and Agency Approvals\IDHS\Train\Republic_Training Center Envelope Comcheck.cck 10/27/21Report date: 98 ofPage Project Title: Data filename: Republic Airways Training Center P:\2021\21040 - Republic Airways Training Center\Management\Code and Agency Approvals\IDHS\Train\Republic_Training Center Envelope Comcheck.cck 10/27/21Report date: 99 ofPage